Root-Cause Analysis of Construction-Cost Overruns
The DOI matches its Crossref record.
Abstract
Despite their negative impact on the construction industry, cost overruns have become an almost natural part of building and infrastructure projects. This paper examines the phenomenon as a worldwide problem, identifies its root causes, ranks them (on a local basis), and analyses them. Root-cause analysis is not merely an arbitrary expression; rather, it is a systematic, formal, well-structured methodology, used as part of the total quality-management approach. The expand–focus principles and techniques were applied in this research for assembling an initial, as wide as possible, inclusive list (pool) of 146 potential causes gathered from the international professional literature as well as from prominent local experts. Through two cycles of expand–focus, they were filtered and merged into merely 15 independent universal root causes. These were further investigated through a cross-sectional survey among 200 local construction practitioners who ranked the 15 universal root causes according to their conceived local importance and influence on cost overruns. The survey revealed that, locally, Cause number 1 is premature tender documents; Cause number 2 is too many changes in owners’ requirements or definitions; and Cause number 3 is tender-winning prices are unrealistically low (suicide tendering). The unique value of this paper to the global community of construction engineering and management is twofold: (1) It identified 15 universal root causes of cost overruns, which provide a good starting point for any local investigation, and (2) offers a well-structured methodology for ranking these 15 universal root causes in accordance with the local circumstances, thereby pinpointing the vital few that may prevent locally a substantial part of the problem.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Cost overrun in the Malaysian construction industry projects: A deeper insight
Shehu, Z., Endut, I. R., Akintoye, A., & Holt, G. D. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.04.004 · Cited by 210
Methodological-Technological Framework for Construction 4.0
Muñoz-La Rivera, F., Mora-Serrano, J., Valero, I., & Oñate, E. (2021) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-020-09455-9 · Cited by 178
Love, P. E. D., Ahiaga-Dagbui, D. D., & Irani, Z. (2016) · Transportation Research Part A: Policy and Practice · doi:10.1016/j.tra.2016.08.007 · Cited by 138
“Furthermore, researchers have sought to pinpoint a single ‘root cause’ for a cost overrun and then suggest that an intervention to change and/or prevents its occurrence (e.g. Rosenfeld, 2014).”
Metadata
- Authors
- Rosenfeld, Y.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2014-01
- Volume
- 140
- Issue
- 1
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W2045249324
- Cited by
- 187
- References
- 0
- FWCI
- 10.43
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Root-Cause Analysis of Construction-Cost Overruns. https://app.cochat.ai/papers/10.1061/(asce)co.1943-7862.0000789
- The paper
- Rosenfeld, Y. (2014). Root-Cause Analysis of Construction-Cost Overruns. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)co.1943-7862.0000789
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.