Student or educator? Sign up with your school email and get 6 months of Pro free.
Cited by 269

The DOI matches its Crossref record; 44 of the 44 references it cites were found in a registry or an index.

Novel Machine-Learning Model for Estimating Construction Costs Considering Economic Variables and Indexes

Rafiei, Mohammad Hossein, Adeli, Hojjat·2018·Journal of Construction Engineering and Management

Abstract

In addition to materials, labor, equipment, and method, construction cost depends on many other factors such as the project locality, type, construction duration, scheduling, and the extent of use of recycled materials. Further, the fluctuation of economic variables and indexes (EV&Is), such as liquidity, wholesale price index, and building services index, causes variation in costs. These changes may increase or reduce the construction cost, are hard to predict, and are normally ignored in the traditional cost estimation computation. This paper presents an innovative construction cost estimation model using advanced machine-learning concepts and taking into account the EV&Is. A data structure is proposed that incorporates a set of physical and financial (P&F) variables of the real estate units as well as a set of EV&Is variables affecting the construction costs. The model includes an unsupervised deep Boltzmann machine (DBM) learning approach along with a softmax layer (DBM-SoftMax), and a three-layer back-propagation neural network (BPNN) or another regression model, support vector machine (SVM). The role of DBM-SoftMax is to extract relevant features from the input data. The role of the BPNN or SVM is to turn the trained unsupervised DBM into a supervised regression network. This combination improves the effectiveness and accuracy of both conventional BPNN and SVM. A sensitivity analysis was performed within the algorithm in order to achieve the best results taking into account the impact of the EV&I factors in different times (time lags). The model was verified using the construction cost data for 372 low- and midrise buildings in the range of three to nine stories. Cost estimation errors of the proposed model were much less than those of both the BPNN-only and SVM-only models, thus demonstrating the effectiveness of the strategies employed in this research and the superiority of the proposed model.

Overview

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1061/(asce)co.1943-7862.0001570

Cites

44 of 44 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 44 references

Cited by

See all 269

Metadata

Authors
Rafiei, M. H., & Adeli, H.
Venue
Journal of Construction Engineering and Management
Published
2018-12
Volume
144
Issue
12
ISSN
  • 0733-9364 (ISSN-L)
  • 1943-7862
OpenAlex
W2894295805
Cited by
269
References
44
FWCI
13.39
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Novel Machine-Learning Model for Estimating Construction Costs Considering Economic Variables and Indexes. https://app.cochat.ai/papers/10.1061/(asce)co.1943-7862.0001570
The paper
Rafiei, M. H., & Adeli, H. (2018). Novel Machine-Learning Model for Estimating Construction Costs Considering Economic Variables and Indexes. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)co.1943-7862.0001570

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.