Computer Vision-Based Video Interpretation Model for Automated Productivity Analysis of Construction Operations
The DOI matches its Crossref record; 9 of the 9 references it cites were found in a registry or an index.
Abstract
Videotaping is an effective and inexpensive technique that has long been used in construction to conduct productivity analyzes. However, as schedules of modern construction projects become more and more compressed, the limitation of video-based analysis—intensive manual reviewing process—contrasts sharply with the need for effortless data analysis methods. This paper presents a study on developing a video interpretation model to interpret videos of construction operations automatically into productivity information. More specifically, this research formalizes key concepts and procedures of video interpretation within the construction domain. It focuses on designing a mechanism for furthering the crosstalk between the prior knowledge of construction operations and computer vision techniques. It uses this mechanism to guide the detection and tracking of project resources as well as work state classifications and abnormal production scenario identifications. The resulting approach has the potential to provide a common base for developing automated video interpretation procedures that can greatly improve current data collection and analyzes practices in construction. Experimental results from preliminary studies have shown the potential of the proposed video interpretation method as an improved productivity data analysis method.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Rapid object detection using a boosted cascade of simple features
Viola, P., & Jones, M. (2005) · Proceedings of the 2001 IEEE Computer Society Conference on Computer Vision and Pattern Recognition. CVPR 2001 · doi:10.1109/cvpr.2001.990517 · Cited by 18,300
Productivity improvement in construction
Oglesby, C. H., Parker, H. W., & Howell, G. A. (1988) · Medical Entomology and Zoology · Cited by 510
Assessing research issues in Automated Project Performance Control (APPC)
Navon, R., & Sacks, R. (2007) · Automation in Construction · doi:10.1016/j.autcon.2006.08.001 · Cited by 225
Trends in productivity improvement in the US construction industry
Arditi, D., & Mochtar, K. (2000) · Construction Management and Economics · doi:10.1080/014461900370915 · Cited by 221
Using Hue, Saturation, and Value Color Space for Hydraulic Excavator Idle Time Analysis
Zou, J., & Kim, H. (2007) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)0887-3801(2007)21:4(238 · Cited by 155
Application of Visualization Techniques for Construction Progress Monitoring
Fard, M. G., & Pena-Mora, F. A. (2007) · ASCE International Conference on Computing in Civil Engineering (i3CE) · doi:10.1061/40937(261)27 · Cited by 99
Goodrum, P. M., & Haas, C. T. (2002) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2002)128:6(463 · Cited by 96
Ladars for construction assessment and update
Cheok, G. S., Stone, W. C., Lipman, R. R., & Witzgall, C. (2000) · Automation in Construction · doi:10.1016/s0926-5805(00)00058-3 · Cited by 85
Comparison of Civil Infrastructure Optical-Based Spatial Data Acquisition Techniques
Zhu, Z., & Brilakis, I. (2007) · ASCE International Conference on Computing in Civil Engineering (i3CE) · doi:10.1061/40937(261)88 · Cited by 11
Cited by
Computer vision techniques for construction safety and health monitoring
Seo, J., Han, S., Lee, S., & Kim, H. (2015) · Advanced Engineering Informatics · doi:10.1016/j.aei.2015.02.001 · Cited by 552
Falls from heights: A computer vision-based approach for safety harness detection
Fang, W., Ding, L., Luo, H., & Love, P. E. D. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.02.018 · Cited by 450
Computer vision techniques in construction: A critical review
Xu, S., Wang, J., Shou, W., Ngo, T., Sadick, A.-M., & Wang, X. (2021) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-020-09504-3 · Cited by 409
“Other prior knowledge includes the site layout plan [51, 95] and leading resource for a particular operation [127], among others.”
BackgroundA vision-based motion capture and recognition framework for behavior-based safety management
Han, S., & Lee, S. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.05.001 · Cited by 347
Computer vision applications in construction: Current state, opportunities & challenges
Paneru, S., & Jeelani, I. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103940 · Cited by 287
Metadata
- Authors
- Gong, J., & Caldas, C. H.
- Venue
- Journal of Computing in Civil Engineering
- Published
- 2010-05
- Volume
- 24
- Issue
- 3
- Pages
- 252-263
- ISSN
- 0887-3801 (ISSN-L)
- 1943-5487
- OpenAlex
- W1983902753
- Cited by
- 207
- References
- 9
- FWCI
- 23.07
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.