CoChat

Developing Key Performance Indicators for Public-Private Partnership Projects: Questionnaire Survey and Analysis

Yuan, Jingfeng, Wang, Chao, Skibniewski, Mirosław J., Li, Qiming · 2012 · Journal of Management in Engineering
Cited by 164

The DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.

Abstract

Public-private partnerships (PPPs) are increasing in popularity. Major challenges in the development of PPPs have resulted from the global financial crisis. However, with respect to their monetary value, PPPs are still an attractive option for public sector projects. Performance management and measurement, in which Key Performance Indicators (KPIs) are the core elements, viewed as effective methods to help PPPs deliver value for money. This article describes in greater detail a KPI conceptual model composed of 5 performance packages and 48 indicators developed by the authors in previous studies. A structured questionnaire survey explored PPP stakeholders perceptions of 48 project performance indicators (PIs) to identify actual KPIs for performance management and measurement in PPPs. Although the survey results show that all PIs are important, performance packages contribute differently to the overall project performance. A confirmatory factor analysis (CFA) was used to test whether the proposed conceptual model fit the observed set of collected data in a predictable way, and to further consolidate the KPIs. The improved KPI model uses 41 PIs, which indicate that performance improvement within PPP projects is strongly influenced by reasonable procurement, design and planning in the public sector, effective process control in the private sector, and the ultimate satisfaction of both the public and private sectors. These 41 KPIs can be used to identify strengths and weaknesses of PPP projects and improve effective performance management and measurement in PPPs.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1061/(asce)me.1943-5479.0000113

Cites

1 of 1 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 1 references

Metadata

Authors
Yuan, J., Wang, C., Skibniewski, M. J., & Li, Q.
Venue
Journal of Management in Engineering
Published
2012-07
Volume
28
Issue
3
Pages
252-264
ISSN
  • 0742-597X (ISSN-L)
  • 1943-5479
OpenAlex
W2158412430
Cited by
164
References
1
FWCI
13.79
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Developing Key Performance Indicators for Public-Private Partnership Projects: Questionnaire Survey and Analysis. https://app.cochat.ai/papers/10.1061/(asce)me.1943-5479.0000113
The paper
Yuan, J., Wang, C., Skibniewski, M. J., & Li, Q. (2012). Developing Key Performance Indicators for Public-Private Partnership Projects: Questionnaire Survey and Analysis. Journal of Management in Engineering. https://doi.org/10.1061/(asce)me.1943-5479.0000113

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.