Student or educator? Sign up with your school email and get 6 months of Pro free.
Cited by 172

The DOI matches its Crossref record.

BIM Execution Planning in Green Building Projects: LEED as a Use Case

Wu, Wei, Issa, Raja R. A.·2015·Journal of Management in Engineering

Abstract

Companies that embrace both building information modeling (BIM) and green building are making conscientious efforts to pursue the synergies between the two, namely the green BIM practice. When done right, project teams find that green BIM can improve project outcomes, and facilitate the accomplishment of established sustainability goals. Nevertheless, green BIM remains an emerging trend to the majority of the industry, and its full potential is yet to be explored according to recent market research reports. The hypothesis of this research is that for companies to succeed in practicing green BIM, a holistic approach that strategically plans for BIM execution in green building projects is needed. The BIM project execution planning guidelines (PEPG) is widely adopted today to offer general guidance and standardized workflow of strategic BIM implementation. PEPG is not meant to and lacks the specificity to address green building projects in particular. However, the popularity of PEPG is conceived as an opportunity for this research to inherit its framework and create a special case of its implementation in green building projects. Considering the prevalence of leadership in energy and environmental design (LEED) green building rating system in global green building industry, this research is further refined to focus on LEED projects as an exemplary use case. Two major activities conducted include: (1) a comprehensive literature review of existing green BIM strategies and best practices; and (2) the proposition of an integrated green BIM process map (IGBPM), which is essentially adapting and further developing relevant process maps from PEPG and initiatives such as the architecture, engineering, construction, owner and operator, phase 1 (AECOO-1) joint testbed to address unique business processes of implementing BIM in LEED projects. The deliverables of this research include level 1 IGBPM and examples of level 2 IGBPM process maps, discussed along with case studies for verification and validation. The goal of this research is to create a prototype that facilitates holistic and systematic green BIM practices based upon clearly defined business processes and execution planning.

Overview

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1061/(asce)me.1943-5479.0000314

Cites

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cited by

See all 172

Metadata

Authors
Wu, W., & Issa, R. R. A.
Venue
Journal of Management in Engineering
Published
2015-01
Volume
31
Issue
1
ISSN
  • 0742-597X (ISSN-L)
  • 1943-5479
OpenAlex
W2045415023
Cited by
172
References
0
FWCI
13.24
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: BIM Execution Planning in Green Building Projects: LEED as a Use Case. https://app.cochat.ai/papers/10.1061/(asce)me.1943-5479.0000314
The paper
Wu, W., & Issa, R. R. A. (2015). BIM Execution Planning in Green Building Projects: LEED as a Use Case. Journal of Management in Engineering. https://doi.org/10.1061/(asce)me.1943-5479.0000314

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.