Dynamic Modeling for Analyzing Impacts of Skilled Labor Shortage on Construction Project Management
The DOI matches its Crossref record.
Abstract
In recent years, the shortage in skilled labor was one of the most significant concerns for the construction industry. Previous studies explored the causes and effects of such shortages; however, these efforts featured limited documentation and implemented subjective methods for analysis. This phenomenon is very complex and dynamically responds to the labor market's behavior and its influence on construction projects. The main goal of this study is to provide a simulation-based method for analyzing the causes and impacts of skilled labor shortages. By adopting a system dynamics (SD) approach, an integrated SD model was developed to explain the dynamic interrelationships between the causes and effects of the skilled labor shortage in construction projects. A total of five scenarios were established to simulate shortages and construction project behaviors. Based on statistical regression and sensitivity analysis, this study contributes to a better understanding of the patterns among the causes of shortages, the shortages themselves, and their impacts on labor wages, cost overruns, and scheduling concerns in construction projects.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
ANN-based automated scaffold builder activity recognition through wearable EMG and IMU sensors
Bangaru, S. S., Wang, C., Busam, S. A., & Aghazadeh, F. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103653 · Cited by 114
Bangaru, S. S., Wang, C., & Aghazadeh, F. (2020) · Sensors · doi:10.3390/s20185264 · Cited by 58
Predictive analytics approach to evaluate wage inequality in engineering organizations
Jafari, A., Rouhanizadeh, B., Kermanshachi, S., & Murrieum, M. (2020) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000841 · Cited by 24
Metadata
- Authors
- Kim, S., Chang, S., & Castro-Lacouture, D.
- Venue
- Journal of Management in Engineering
- Published
- 2020-01
- Volume
- 36
- Issue
- 1
- ISSN
- 0742-597X (ISSN-L)
- 1943-5479
- OpenAlex
- W2975634467
- Cited by
- 195
- References
- 0
- FWCI
- 13.59
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Dynamic Modeling for Analyzing Impacts of Skilled Labor Shortage on Construction Project Management. https://app.cochat.ai/papers/10.1061/(asce)me.1943-5479.0000720
- The paper
- Kim, S., Chang, S., & Castro-Lacouture, D. (2020). Dynamic Modeling for Analyzing Impacts of Skilled Labor Shortage on Construction Project Management. Journal of Management in Engineering. https://doi.org/10.1061/(asce)me.1943-5479.0000720
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.