Critical Success Factors for the Construction Industry
The DOI matches its Crossref record; 8 of the 8 references it cites were found in a registry or an index.
Abstract
The traditional approach to success in the construction industry, both in academia and in industry, places great emphasis on the ability to plan and execute projects. In the past, companies completing projects in a timely manner within an established budget and meeting required quality considerations have been considered successful companies. Minimizing an emphasis on management practices and organizational stability, companies with a track record of successful project completion have been considered the construction industries' top-performers. In contrast, other industries emphasize management practices at a corporate level as an essential element of success. However, the future environment of the typical construction company will be much different due to technological and economic advancements. Therefore, a shift in emphasis from project success to corporate success should be examined for construction organizations to compete in an ever-changing marketplace. This paper advocates the adoption of a critical success factor methodology to enhance construction organization success and identify elements that are essential for organizations to achieve this success.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“However, despite the great success achieved by the Ministry of Housing, the diversity and complexity of engineering systems in homes [20], the high maintenance costs, limited budgets allocated to maintain these units for Saudi families, high aspirations and expectations of users, high and varied maintenance defects resulting from operation [21], and increasing concerns regarding security and”
From Impact of the Saudi Building Code on Residential Construction Costs (2024) · cites this paper as [20]
Citations
Cites
Critical factors in successful project implementation
Pinto, J. K., & Slevin, D. P. (1987) · IEEE Transactions on Engineering Management · doi:10.1109/tem.1987.6498856 · Cited by 966 · cited 1×
“These factors of success include project schedule/plans, client acceptance, monitoring and feedback, communication, trouble-shooting, and characteristics of the project team leader (Pinto and Slevin 1987).”
BackgroundAn assessment of critical success factors
Zahidy, I. (1984) · Cited by 679
The changing role of the information systems executive : a critical success factors perspectivePreprint
Rockart, J. F. (1980) · RePEc: Research Papers in Economics · Cited by 550
Critical Success Factors for Construction Projects
Sanvido, V., Grobler, F., Parfitt, K., Guvenis, M., & Coyle, M. (1992) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1992)118:1(94 · Cited by 478
Checklist of Critical Success Factors for Building Projects
Parfitt, M. K., & Sanvido, V. E. (1993) · Journal of Management in Engineering · doi:10.1061/(asce)9742-597x(1993)9:3(243 · Cited by 157
The Space Shuttle Program: A Policy Failure?
Logsdon, J. M. (1986) · Science · doi:10.1126/science.232.4754.1099 · Cited by 82
Strategic Corporate Management for Engineering
Chinowsky, P. S., & Meredith, J. E. (2000) · Cited by 32
Benchmarking the World Wide Web in Student Collaboration
Chinowsky, P. S. (1999) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)0887-3801(1999)13:4(254 · Cited by 5
Cited by
Critical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects
Iyer, K. C., & Jha, K. N. (2006) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2006)132:8(871 · Cited by 244
Commitment, coordination, competence and the iron triangle
Jha, K. N., & Iyer, K. C. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.11.009 · Cited by 243
Identification and evaluation of success factors for public construction projects
Tabish, S. Z. S., & Jha, K. N. (2011) · Construction Management and Economics · doi:10.1080/01446193.2011.611152 · Cited by 187
“Zhang (2005) studied CSFs for public–private partnerships in infrastructure development while Abraham (2003) studied CSFs for the construction industry.”
BackgroundDetermining Success Factors for a Construction Organization: A Structural Equation Modeling Approach
Tripathi, K. K., & Jha, K. N. (2017) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000569 · Cited by 159
Shehu, Z., & Akintoye, A. (2009) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.02.004 · Cited by 132
Labour-intensive construction sub-contractors: Their critical success factors
Ng, S. T., & Tang, Z. (2009) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.11.005 · Cited by 132
Improving Sustainability Performance for Public-Private-Partnership (PPP) Projects
Shen, L., Tam, V. W. Y., Gan, L., Ye, K., & Zhao, Z. (2016) · Sustainability · doi:10.3390/su8030289 · Cited by 103
“Research on examining the applications of PPP approach has been conducted extensively from many perspectives including technology innovation [10], risk management [11], critical success factors [12], cooperate governance [13], concessionaire determinants [14,15], and sustainability performance [16,17].”
BackgroundFactors contributing to the success of equipment-intensive subcontractors in construction
Ng, S. T., Tang, Z., & Palaneeswaran, E. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2008.09.006 · Cited by 87
Impact of COVID-19 on the US Construction Industry as Revealed in the Purdue Index for Construction
Jeon, J., Padhye, S., Bhattacharyya, A., Cai, H., & Hastak, M. (2021) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000995 · Cited by 62
Khattak, M. S., & Mustafa, U. (2019) · Engineering Construction & Architectural Management · doi:10.1108/ecam-05-2017-0079 · Cited by 59
Critical success factors for large building construction projects
Mathar, H., Assaf, S., Hassanain, M. A., Abdallah, A. S., & Sayed, A. M. Z. (2020) · Built Environment Project and Asset Management · doi:10.1108/bepam-07-2019-0057 · Cited by 56
An empirical study on factors leading to the success of construction organizations in India
Tripathi, K. K., & Jha, K. N. (2018) · International Journal of Construction Management · doi:10.1080/15623599.2017.1423162 · Cited by 55
“The dominance of an engineering culture and a lack of organizational learning in infrastructure and development process experiments suggest that organizations with a balance among cultures may be more likely to succeed than those dominated by a single culture. Ofori and Lean (2001) used ranking analysis and factor ana…”
BackgroundInfluentialLong-Term Entropy and Profitability Change of United States Public Construction Firms
Choi, J.-S., & Russell, J. S. (2004) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2005)21:1(17 · Cited by 48
A hierarchical model for critical success factors in apparel supply chain
Chowdhury, N. A., Ali, S. M., Paul, S. K., Mahtab, Z., & Kabir, G. (2020) · Business Process Management Journal · doi:10.1108/bpmj-08-2019-0323 · Cited by 50
Du, J., & El-Gafy, M. A. (2012) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000122 · Cited by 45
Alemayehu, S., Nejat, A., Ghebrab, T., & Ghosh, S. (2021) · Engineering Construction & Architectural Management · doi:10.1108/ecam-02-2021-0165 · Cited by 42
Key drivers for adopting design build: A comparative study between project stakeholders
Lee, Z. P., Rahman, R. A., & Doh, S. I. (2020) · Physics and Chemistry of the Earth Parts A/B/C · doi:10.1016/j.pce.2020.102945 · Cited by 36
Tripathi, K. K., & Jha, K. N. (2018) · Engineering Construction & Architectural Management · doi:10.1108/ecam-01-2017-0004 · Cited by 37
Dimensions for improvement of construction management practice in Ethiopian construction industry
Mengistu, D. G., & Mahesh, G. (2019) · Journal of Engineering Design and Technology · doi:10.1108/jedt-10-2018-0175 · Cited by 26
Rafique, M., Jaafar, M., Zafar, A. M., & Ahmed, S. (2023) · International Journal of Organization Theory and Behavior · doi:10.1108/ijotb-02-2022-0034 · Cited by 31
Norhidayah, Kasim, N. B., & Shamsudin, A. (2012) · Journal of Technology Management in China · doi:10.1108/17468771211242863 · Cited by 21
Critical success factors for Ghanaian contractors
Ofori-Kuragu, J. K., Baiden, B. K., & Badu, E. (2016) · Benchmarking An International Journal · doi:10.1108/bij-03-2014-0018 · Cited by 18
Urban Green Infrastructure in Jordan: A Perceptive of Hurdles and Challenges
Zeadat, Z. F. (2022) · Journal of Sustainable Real Estate · doi:10.1080/19498276.2022.2098589 · Cited by 23
Whang, S.-W., Flanagan, R., Kim, S., & Kim, S. (2016) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001242 · Cited by 16
“Categories of Critical factor Description of Critical factor Relevant literature General & traditional Project management Construction industry Abraham (2003), Arslan and Kivrak (2008) Specific project management Caralli et al. (2004), Dobbins (2002), Shen and Liu (2003), Pollalis and Frieze (1993)…”
BackgroundAlkhathami, M. M. (2005) · D-Scholarship@Pitt (University of Pittsburgh) · Cited by 15
Ghosh, A., Abawajy, J., & Chowdhury, M. (2022) · Construction Innovation · doi:10.1108/ci-11-2021-0224 · Cited by 21
Critical Success Factors for Effective Risk Management
Kikwasi, G. J. (2018) · IntechOpen eBooks · doi:10.5772/intechopen.74419 · Cited by 12
“[13] reveal initiation, identification, assessment, response planning, response implementation and risk communication and attitude, monitoring and review as CSFs for the construction industry.”
BackgroundNorizam, A., & Malek, M. A. (2013) · Asian Social Science · doi:10.5539/ass.v9n9p211 · Cited by 11
“212 enhancements and process benchmarking (Rockart 1982; Sanvido 1982; Abraham 2004).”
BackgroundInfluentialDo Longer Projects Have Larger Cost Deviation Than Shorter Construction Projects?
Belay, A. M., & Torp, O. (2017) · Procedia Engineering · doi:10.1016/j.proeng.2017.07.198 · Cited by 10
A literature review on construction project success evaluation criteria and methods
Beshah, G. G., Mengesha, W. J., & Demiss, B. A. (2024) · Cogent Engineering · doi:10.1080/23311916.2024.2376220 · Cited by 9
Ko, T., Lee, J., & Jeong, H. D. (2023) · Journal of Construction Engineering and Management · doi:10.1061/jcemd4.coeng-13655 · Cited by 11
Lee, Z. P., Rahman, R. A., & Doh, S. I. (2022) · Built Environment Project and Asset Management · doi:10.1108/bepam-06-2021-0085 · Cited by 7
Critical success factors in infrastructure projects
Zakaria, S. F., Zin, R. M., Mohamad, I., Balubaid, S., Mydin, S. H., & Rahim, E. M. R. M. (2017) · AIP conference proceedings · doi:10.1063/1.5011586 · Cited by 7
Construction organization success strategy in post-conflict environment
Amarkhil, Q., & Elwakil, E. (2019) · International Journal of Construction Management · doi:10.1080/15623599.2019.1644761 · Cited by 6
“…performance prediction models and methodologies to help construction organization to achieve profit and success in the market, for instance, Abraham (2003), Elwakil et al. (2009), Horta et al. (2009), Inayat et al. (2013) and Elwakil (2017), have determined CSFs and developed performance…”
BackgroundMethodHuman Resource Management and the Implementation of Change
Mishra, P., Shukla, B., & Sujatha, R. (2021) · Routledge eBooks · doi:10.4324/9781003191384 · Cited by 14
Factors Leading To Success of Indian Construction Companies.
Gadekar, M. A. (2013) · IOSR Journal of Mechanical and Civil Engineering · doi:10.9790/1684-1015254 · Cited by 6
“The traditional approach to success in the construction industry is to focus on the ability to plan and execute projects [5].”
BackgroundAmarkhil, Q., & Elwakil, E. (2021) · Journal of Financial Management of Property and Construction · doi:10.1108/jfmpc-05-2020-0039 · Cited by 5
Dom, N. M., Kasim, N. B., & Shamsudin, A. (2012) · Journal of Construction Engineering and Project Management · doi:10.6106/jcepm.2012.2.1.005 · Cited by 5
“Technological Changes A constantly changing marketplace, technology has moved to the forefront for advancement potential in the construction industry [62].”
BackgroundKumaraswamy, M. M., Miller, C. J., Rahman, M. M., Pickernell, D. G., Ng, S. T., & Wong, I. P. Y. (2006) · Architectural Engineering and Design Management · doi:10.1080/17452007.2006.9684610 · Cited by 6
“Construction industry improvements have been suggested through improvements of some eight critical success factors (CSFs) (Abraham, 2003).”
BackgroundNEEDS OF SMCs IN HONG KONG: INFORMATION MANAGEMENT AND IT
Rahman, M. M., Kumaraswamy, M. M., Ng, S. T., Lam, E., Ho, E., Lee, S., Palaneeswaran, E., & Ugwu, O. O. (2004) · Swinburne figshare (Swinburne University of Technology) · Cited by 5
Belay, S. M., Goedert, J. D., Woldesenbet, A. K., & Rokooei, S. (2021) · African Journal of Science Technology Innovation and Development · doi:10.1080/20421338.2021.1982663 · Cited by 4
“2014; Hwang and Lim 2013; Inayat, Melhem, and Esmaeily 2015; Kog and Loh 2012; Saqib, Farooqui, and Lodi 2008b; Yong and Mustaffa 2013) PM3 – good communication of the PM team (Abraham 2004; Chen et al. 2012; Chua, Kog, and Loh 1999; Elwakil et al. 2009; Hwang and Lim 2013; Inayat, Melhem, and Esmaeily 2015; Kog and L…”
BackgroundInfluentialAboagye, J. N., Kissi, E., Acheampong, A., & Badu, E. (2022) · Journal of Engineering Design and Technology · doi:10.1108/jedt-07-2021-0378 · Cited by 4
Shah, M. N., Mulliner, E., Singh, T. P., & Ahuja, A. K. (2022) · Journal of Surveying Construction & Property · doi:10.22452/jscp.vol13no1.1 · Cited by 4
A Study of Project Characteristics and Project Performance Level of difficulty
Cho, Y.-S., & Cha, H.-S. (2010) · Korean Journal of Construction Engineering and Management · doi:10.6106/kjcem.2010.11.6.78 · Cited by 4
Impact of the Saudi Building Code on Residential Construction Costs
Allahaim, F. S., El shenawy, A. M., & Alfalah, G. (2024) · Buildings · doi:10.3390/buildings14010233 · Cited by 3
Cherkos, F. D., & Kifle, K. T. (2025) · Built Environment Project and Asset Management · doi:10.1108/bepam-01-2025-0051 · Cited by 3
Integrating SMCs into construction value chains
Rahman, M. M., Kumaraswamy, M. M., Ng, S. T., Palaneeswaran, E., Lam, E., & Ugwu, O. O. (2004) · Swinburne figshare (Swinburne University of Technology) · Cited by 3
Performance Improvements through Flexible Organisational Cultures
Rahman, M. M., Kumaraswamy, M. M., Rowlinson, S., & Sze, E. (2003) · Cited by 3
Shirouyehzad, H., Kashian, E., & Emadi, S. M. (2024) · Journal of Advances in Management Research · doi:10.1108/jamr-04-2023-0089 · Cited by 2
Altarawneh, J. Y., Thiruchelvam, V., & Samadi, B. (2017) · International Business Research · doi:10.5539/ibr.v10n12p139 · Cited by 2
Detecting faking responses during empirical research: a study in a developing country environment
Tetteh, G. A., Amoako‐Gyampah, K., & Kwarteng, A. (2021) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-03-2019-0019 · Cited by 3
Key Drivers for Adopting Design-Build in Public Construction Projects: Malaysian Perspective
Lee, Z. P., Rahman, R. A., & Doh, S. I. (2021) · Journal of Construction in Developing Countries · doi:10.21315/jcdc2021.26.1.07 · Cited by 3
Improving Determinant Factors to Facilitate Construction Industry Development in Ethiopia
Mengistu, D. G. (2019) · Cited by 2
CRITICAL SUCCESS FACTORS FOR THE CONSTRUCTION ORGANISATION
Mazri, I. A. (2005) · Cited by 2
Yusuf, M., Yusuf, M., & Asmoni, M. N. A. M. (2021) · Journal of Facilities Management · doi:10.1108/jfm-10-2020-0073 · Cited by 1
Critical Factors Affecting the Success of a Construction Project: A Review
Jain, M. (2014) · Cited by 1
Mengistu, D. G., Ashene, D. A., & Beyene, M. M. (2023) · Journal of Construction in Developing Countries · doi:10.21315/jcdc-12-22-0214 · Cited by 1
Integrated Risk Management Practice in the Construction Industry General Contractors' Perspective
Hintsay, H. (2016) · National Academic Digital Repository of Ethiopia · doi:10.20372/nadre/7923 · Cited by 1
Life Cycle Assessment on Green Building Implementation
Tam, V. W. Y., Shen, L., & Le, K. N. (2016) · MDPI eBooks · doi:10.3390/books978-3-03842-257-0 · Cited by 1
Ahmed, M. A. (2020) · Queensland University of Technology · doi:10.5204/thesis.eprints.200905 · Cited by 1
Assessing the Critical Success Factors for PWD Projects in Rural Area
Umberje, A., Gaur, S., & Tawalare, A. (2021) · Lecture notes in civil engineering · doi:10.1007/978-981-16-4396-5_14
ICT Cost Impact Model in Construction Project Management
Mandičák, T., Mésároš, P., Behúnová, A., & Zemánová, L. (2022) · EAI/Springer Innovations in Communication and Computing · doi:10.1007/978-3-030-96314-9_15
A business success evaluation of market entry mode types in Myanmar construction
Gay, N. (2019) · Chula Digiverse · doi:10.58837/chula.the.2019.133
autores, V. (2021) · Publicacions URV eBooks · doi:10.17345/9788484249603
Tripathi, K. K. (2025) · Journal of Legal Affairs and Dispute Resolution in Engineering and Construction · doi:10.1061/jladah.ladr-1302
Metadata
- Authors
- Abraham, G. L.
- Affiliations
- Georgia Institute of Technology (US)
- Corresponding author
- Abraham, Gena L.
- Venue
- Construction Research Congress
- Publisher
- American Society of Civil Engineers
- Published
- 2003-03-14
- Pages
- 1-9
- OpenAlex
- W1986034602
- Cited by
- 66
- References
- 8
- Citations by year
- 2025: 2 · 2024: 3 · 2023: 3 · 2022: 6 · 2021: 10 · 2020: 4 · 2019: 5 · 2018: 4 · 2017: 4 · 2016: 5 · 2014: 1 · 2013: 2 · 2012: 3
- FWCI
- 3.87
- Type
- conference paper
- Language
- en
- Open access
- closed
- Locations
- ASCE Construction Research Congress (CRC) (publishedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Physical Sciences › Engineering › Building and Construction › Real estate and construction management
- Keywords
- success factors, construction industry, construction companies, organizational success, project success, management practices, organizational stability, enterprise competitiveness, construction management
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.