Disassembly sequencing: A survey
The DOI matches its Crossref record; 44 of the 44 references it cites were found in a registry or an index.
Abstract
This paper is a survey of the presently available literature on disassembly sequencing, including the papers that are closely related to this topic. Disassembly theory is applied to complex products such as mechanical, electromechanical and electronic appliances. It is required for end-of-life processing and for maintenance and repair. Apart from these applications, disassembly is studied for supporting the analysis of assembly processes. Disassembly sequencing involves the search for all possible disassembly sequences and the selection of the optimum solution out of these. In each application, a slightly different approach can be observed, including level of detail, degrees of freedom, and the role of uncertainty. Disassembly sequencing also plays a major role in the modern design process and is an invaluable tool in concurrent engineering. Its connection with the more detailed or component level and the less detailed level or process level including logistics, is highlighted. This presentation of the state of the art is intended as a stimulus for further research in this interesting field.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Issues in environmentally conscious manufacturing and product recovery: a survey
Gungor, A., & Gupta, S. M. (1999) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(99)00167-9 · Cited by 1,107
Simplified generation of all mechanical assembly sequences
Fazio, T. D., & Whitney, D. E. (1987) · IEEE Journal on Robotics and Automation · doi:10.1109/jra.1987.1087132 · Cited by 812
Balancing and Sequencing of Assembly Lines
Schöll, A. (1999) · Contributions to management science · doi:10.1007/978-3-662-11223-6 · Cited by 752
AND/OR Graph Representation of Assembly Plans
Honicm, L. S., Arthur, M., & Sanderson, C. (1986) · Cited by 687
Product life cycle cost analysis: State of the art review
Asiedu, Y., & Gu, P. (1998) · International Journal of Production Research · doi:10.1080/002075498193444 · Cited by 672
Design for manufacture and design for ‘X’: concepts, applications, and perspectives
Kuo, T.-C., Huang, S. H., & Zhang, H.-C. (2001) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(01)00045-6 · Cited by 467
Environmental integrated production and recycling management
Spengler, T., Püchert, H., Penkuhn, T., & Rentz, O. (1997) · European Journal of Operational Research · doi:10.1016/s0377-2217(96)00200-7 · Cited by 325
On a medium term product recovery and disposal strategy for durable assembly products
Krikke, H. R., van Harten, A., & Schuur, P. C. (1998) · International Journal of Production Research · doi:10.1080/002075498193967 · Cited by 208
Linear programming in disassembly/clustering sequence generation
Lambert, A. J. D. (1999) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(99)00162-x · Cited by 196
Self-citationPlanning product disassembly for material recovery opportunities
JOHNSON, M. R., & WANG, M. H. (1995) · International Journal of Production Research · doi:10.1080/00207549508904864 · Cited by 186
Disassembly sequence planning for products with defective parts in product recovery
Gungor, A., & Gupta, S. M. (1998) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(98)00047-3 · Cited by 176
Sodhi, M. S., & Reimer, B. (2001) · OR Spektrum · doi:10.1007/pl00013347 · Cited by 175
Moore, K. E., Güngör, A., & Gupta, S. M. (2001) · European Journal of Operational Research · doi:10.1016/s0377-2217(00)00321-0 · Cited by 175
An evaluation methodology for disassembly processes
Güngör, A., & Gupta, S. M. (1997) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(97)00104-6 · Cited by 171
Determination of a disassembly strategy
Penev, K. D., & de Ron, A. J. (1996) · International Journal of Production Research · doi:10.1080/00207549608904915 · Cited by 166
A Multi-Objective Methodology for Evaluating Product End-of-Life Options and Disassembly
Lee, S. G., Lye, S. W., & Khoo, M. K. (2001) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s001700170086 · Cited by 161
Disassembly of multiple product structures
Taleb, K. N., & Gupta, S. M. (1997) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(97)00023-5 · Cited by 158
Design for Disassembly and the Environment
Harjula, T., Rapoza, B., Knight, W. A., & Boothroyd, G. (1996) · CIRP Annals · doi:10.1016/s0007-8506(07)63027-3 · Cited by 149
Business case Roteb: recovery strategies for monitors
Krikke, H. R., van Harten, A., & Schuur, P. C. (1999) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(99)00163-1 · Cited by 129
The Recovery Problem in Product Design
NAVTN-CHANDRA, D. (1994) · Journal of Engineering Design · doi:10.1080/09544829408907873 · Cited by 127
A MULTI-CRITERIA DECISION MAKING APPROACH FOR DISASSEMBLY-TO-ORDER SYSTEMS
Kongar, E. A., & Gupta, S. M. (2002) · Journal of Electronics Manufacturing · doi:10.1142/s0960313102000345 · Cited by 115
A Petri net approach to disassembly process planning
Moore, K. E., Güngör, A., & Gupta, S. M. (1998) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(98)00051-5 · Cited by 113
A Methodology to Evaluate Ease of Disassembly for Product Recycling
Kroll, E., Beardsley, B., & Parulian, A. (1996) · IIE Transactions · doi:10.1080/15458830.1996.11770736 · Cited by 110
Parallel Disassembly Sequencing with Sequence-Dependent Operation Times
Kang, J.-G., Lee, D.-H., Xirouchakis, P. C., & Persson, J.-G. (2001) · CIRP Annals · doi:10.1016/s0007-8506(07)62136-2 · Cited by 94
Optimization analysis for recycle-oriented manufacturing systems
HOSHINO, T., Yura, K., & HITOMI, K. (1995) · International Journal of Production Research · doi:10.1080/00207549508904802 · Cited by 89
Disassembly sequencing using a motion planning approach
Sundaram, S., Remmler, I., & Amato, N. M. (2002) · Proceedings - IEEE International Conference on Robotics and Automation/Proceedings · doi:10.1109/robot.2001.932818 · Cited by 89
Planning of Products Assembly and Disassembly
Laperrière, L., & ElMaraghy, H. A. (1992) · CIRP Annals · doi:10.1016/s0007-8506(07)61141-x · Cited by 86
Disassembly and recycling of electronic consumer products: An overview
de Ron, A. J., & Penev, K. D. (1995) · Technovation · doi:10.1016/0166-4972(95)96597-m · Cited by 81
A structure-oriented approach to assembly sequence planning
Chakrabarty, S., & Wolter, J. (1997) · IEEE Transactions on Robotics and Automation · doi:10.1109/70.554344 · Cited by 70
Process planning for product disassembly
Das, S. K., & Naik, S. (2002) · International Journal of Production Research · doi:10.1080/00207540110102142 · Cited by 69
On algebraic and graph structural properties of assembly Petri net
Suzuki, T., Kanehara, T., Inaba, A., et al. (2002) · Proceedings - IEEE International Conference on Robotics and Automation/Proceedings · doi:10.1109/robot.1993.291907 · Cited by 63
Integrated Development of Assembly and Disassembly
Westkämper, E., Feldmann, K., Reinhart, G., & Seliger, G. (1999) · CIRP Annals · doi:10.1016/s0007-8506(07)63234-x · Cited by 57
A case-based reasoning approach to planning for disassembly
ZEID, I., Gupta, S. M., & Bardasz, T. (1997) · Journal of Intelligent Manufacturing · doi:10.1023/a:1018500603358 · Cited by 55
Modelling material separation processes in bulk recycling
Sodhi, M. S., Young, J. B. W. M., & Knight, W. A. (1999) · International Journal of Production Research · doi:10.1080/002075499190743 · Cited by 49
Assembly sequences planning for simultaneous engineering applications
Laperrière, L., & ElMaraghy, H. A. (1994) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/bf01751121 · Cited by 43
Design for Bulk Recycling: Analysis of Materials Separation
Knight, W. A., & Sodhi, M. S. (2000) · CIRP Annals · doi:10.1016/s0007-8506(07)62901-1 · Cited by 41
A temporal framework for assembly sequence representation and analysis
Seow, K. T., & Devanathan, R. (1994) · IEEE Transactions on Robotics and Automation · doi:10.1109/70.282546 · Cited by 40
A Method for Sequencing the Disassembly of Products
Kaebernick, H., O'Shea, B., & Grewal, S. (2000) · CIRP Annals · doi:10.1016/s0007-8506(07)62886-8 · Cited by 35
An efficient algorithm for searching implicit AND/OR graphs with cycles
Jiménez, P., & Torras, C. (2000) · Artificial Intelligence · doi:10.1016/s0004-3702(00)00063-1 · Cited by 32
A graph model for face-to-face assembly
Floriani, L. D., & George Nagy, A. (2003) · Proceedings - IEEE International Conference on Robotics and Automation/Proceedings · doi:10.1109/robot.1989.99970 · Cited by 29
Maintainability Analysis in Concurrent Engineering of Mechanical Systems
Vujosevic, R. (1995) · Concurrent Engineering · doi:10.1177/1063293x9500300108 · Cited by 21
Environmental Design Industrial Template (EDIT): a software tool for analysis of product retirement
Spicer, A., & Wang, M. H. (1997) · Journal of Cleaner Production · doi:10.1016/s0959-6526(97)00029-2 · Cited by 16
Marginal emission and variation across models: life-cycle assessment of a television
Thomas, V. M., CAUDILL, R. J., & Badwe, D. J. (2002) · IEEE International Symposium on Electronics and the Environment (ISEE) · doi:10.1109/isee.1998.675029 · Cited by 15
Disassembly/assembly path search reusing solutions
Murayama, T., & Oba, F. (2002) · IEEE International Conference on Emerging Technologies and Factory Automation (ETFA) · doi:10.1109/etfa.1997.616266 · Cited by 10
Cited by
Ilgin, M. A., & Gupta, S. M. (2010) · Journal of Environmental Management · doi:10.1016/j.jenvman.2009.09.037 · Cited by 1,015
Operational methods for minimization of energy consumption of manufacturing equipment
Mouzon, G., Yildirim, M. B., & Twomey, J. (2007) · International Journal of Production Research · doi:10.1080/00207540701450013 · Cited by 597
Ravi, V., Shankar, R., & Tiwari, M. K. (2005) · Computers & Industrial Engineering · doi:10.1016/j.cie.2005.01.017 · Cited by 474
Agrawal, S., & Tiwari, M. K. (2008) · International Journal of Production Research · doi:10.1080/00207540600943985 · Cited by 252
Disassembly line balancing problem: a review of the state of the art and future directions
Özceylan, E., Kalayci, C. B., Güngör, A., & Gupta, S. M. (2019) · International Journal of Production Research · doi:10.1080/00207543.2018.1428775 · Cited by 220
“On the other hand, disassembly sequencing seeks a feasible/optimal order in which the disassembly tasks are processed (Lambert 2003).”
Background
Metadata
- Authors
- Lambert, A. J. D.
- Venue
- International Journal of Production Research
- Publisher
- Informa UK Limited
- Published
- 2003-01
- Volume
- 41
- Issue
- 16
- Pages
- 3721-3759
- ISSN
- 0020-7543 (ISSN-L)
- 1366-588X
- OpenAlex
- W2059890236
- Cited by
- 382
- References
- 44
- FWCI
- 55.87
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.