Flowshop-scheduling problems with makespan criterion: a review
The DOI matches its Crossref record; 39 of the 39 references it cites were found in a registry or an index.
Abstract
This paper is a complete survey of flowshop-scheduling problems and contributions from early works of Johnson of to recent approaches of metaheuristics of 2004. It mainly considers a flowshop problem with a makespan criterion and it surveys some exact methods (for small size problems), constructive heuristics and developed improving metaheuristic and evolutionary approaches as well as some well-known properties and rules for this problem. Each part has a brief literature review of the contributions and a glimpse of that approach before discussing the implementation for a flowshop problem. Moreover, in the first section, a complete literature review of flowshop-related scheduling problems with different assumptions as well as contributions in solving these other aspects is considered. This paper can be seen as a reference to past contributions (particularly in n/m/p/c max or equivalently F/prmu/c max) for future research needs of improving and developing better approaches to flowshop-related scheduling problems.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Genetic algorithms in search, optimization, and machine learning
(1989) · Choice Reviews Online · doi:10.5860/choice.27-0936 · Cited by 49,010
Optimization by Simulated Annealing
Kirkpatrick, S., Gelatt, C. D., & Vecchi, M. P. (1983) · Science · doi:10.1126/science.220.4598.671 · Cited by 45,134
Equation of State Calculations by Fast Computing Machines
Metropolis, N., Rosenbluth, A. W., Rosenbluth, M. N., Teller, A. H., & Teller, E. (1953) · The Journal of Chemical Physics · doi:10.1063/1.1699114 · Cited by 37,192
Genetic Algorithms in Search, Optimization and Machine Learning
Goldberg, D. E., & Robson, D. (1988) · Cited by 18,391
Goldberg, D. E., & Shakespeare, W. (2002) · Cited by 16,088
Ant colony system: a cooperative learning approach to the traveling salesman problem
Dorigo, M., & Gambardella, L. M. (1997) · IEEE Transactions on Evolutionary Computation · doi:10.1109/4235.585892 · Cited by 8,081
Scheduling: Theory, Algorithms, and Systems
(1996) · IIE Transactions · doi:10.1080/15458830.1996.11770714 · Cited by 6,210
Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
Graham, R. L., Lawler, E. L., Lenstra, J. K., & Kan, A. H. G. R. (1979) · Annals of Discrete Mathematics · doi:10.1016/s0167-5060(08)70356-x · Cited by 5,854
Optimal two‐ and three‐stage production schedules with setup times included
Johnson, S. M. (1954) · Naval Research Logistics Quarterly · doi:10.1002/nav.3800010110 · Cited by 3,252
Glover, F., & Laguna, M. (1997) · doi:10.1007/978-1-4615-6089-0 · Cited by 3,001 · cited 1×
“(1993) and Glover and Laguna (1997).”
Simulated annealing: theory and applications.
(1988) · Mathematics and Computers in Simulation · doi:10.1016/0378-4754(88)90023-7 · Cited by 2,966
Benchmarks for basic scheduling problems
Taillard, É. D. (1993) · European Journal of Operational Research · doi:10.1016/0377-2217(93)90182-m · Cited by 2,813
Introduction to Sequencing and Scheduling
Clewett, A. J., & Baker, K. R. (1977) · Operational Research Quarterly (1970-1977) · doi:10.2307/3009192 · Cited by 2,597
Conway, R. W., Maxwell, W., & Miller, L. W. (1967) · Cited by 2,167
A multi-objective genetic local search algorithm and its application to flowshop scheduling
Ishibuchi, H., & Murata, T. (1998) · IEEE Transactions on Systems, Man and Cybernetics, Part C (Applications and Reviews) · doi:10.1109/5326.704576 · Cited by 1,019
A genetic algorithm for flowshop sequencing
Reeves, C. R. (1995) · Computers & Operations Research · doi:10.1016/0305-0548(93)e0014-k · Cited by 872
Some efficient heuristic methods for the flow shop sequencing problem
Taillard, É. D. (1990) · European Journal of Operational Research · doi:10.1016/0377-2217(90)90090-x · Cited by 869
A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process
Hall, N. G., & Sriskandarajah, C. (1996) · Operations Research · doi:10.1287/opre.44.3.510 · Cited by 842
Simulated annealing for permutation flow-shop scheduling
Osman, I., & Potts, C. (1989) · Omega · doi:10.1016/0305-0483(89)90059-5 · Cited by 614
Simulated annealing: Theory and applications
Rota, G. (1988) · Advances in Mathematics · doi:10.1016/0001-8708(88)90072-2 · Cited by 607
A comprehensive review and evaluation of permutation flowshop heuristics
Ruiz, R., & Maroto, C. (2005) · European Journal of Operational Research · doi:10.1016/j.ejor.2004.04.017 · Cited by 579
Machine Scheduling Problems: Classification, complexity and computations
Kan, R. (1976) · Medical Entomology and Zoology · Cited by 561
Palmer, D. S. (1965) · Journal of the Operational Research Society · doi:10.1057/jors.1965.8 · Cited by 547
A fast tabu search algorithm for the permutation flow-shop problem
Nowicki, E., & Smutnicki, C. (1996) · European Journal of Operational Research · doi:10.1016/0377-2217(95)00037-2 · Cited by 455
Ogbu, F. A., & Smith, D. K. (1990) · Computers & Operations Research · doi:10.1016/0305-0548(90)90001-n · Cited by 310
Genetic Algorithms, Path Relinking, and the Flowshop Sequencing Problem
Reeves, C. R., & Yamada, T. (1998) · Evolutionary Computation · doi:10.1162/evco.1998.6.1.45 · Cited by 274
Heuristics for flow-shop scheduling
KING, J. R., & SPACHIS, A. S. (1980) · International Journal of Production Research · doi:10.1080/00207548008919673 · Cited by 197
An Ant Approach to the Flow Shop Problem
Stützle, T. (1998) · Cited by 183
An ant colony system for permutation flow-shop sequencing
Ying, K.-C., & Liao, C.-J. (2004) · Computers & Operations Research · doi:10.1016/s0305-0548(03)00038-8 · Cited by 178
A tabu search approach for the flow shop scheduling problem
Ben‐Daya, M., & Al-Fawzan, M. A. (1998) · European Journal of Operational Research · doi:10.1016/s0377-2217(97)00136-7 · Cited by 160
Adapting Weighted Aggregation for Multiobjective Evolution Strategies
Jin, Y., Okabe, T., & Sendho, B. (2001) · Lecture notes in computer science · doi:10.1007/3-540-44719-9_7 · Cited by 155
Scheduling problems and traveling salesman: the genetic edge recombination
Whitley, D., Starkweather, T., & Fuquay, D. (1989) · international conference on Genetic algorithms · Cited by 152
An Ant Algorithm with a New Pheromone Evaluation Rule for Total Tardiness Problems
Merkle, D., & Middendorf, M. (2000) · Lecture notes in computer science · doi:10.1007/3-540-45561-2_28 · Cited by 125
Genetic algorithms for the two-stage bicriteria flowshop problem
Neppalli, V. R., Chen, C.-L., & Gupta, J. N. D. (1996) · European Journal of Operational Research · doi:10.1016/0377-2217(95)00275-8 · Cited by 103
Defining tabu list size and aspiration criterion within tabu search methods
Salhi, S. (2002) · Computers & Operations Research · doi:10.1016/s0305-0548(00)00062-9 · Cited by 83
New block properties for the permutation flow shop problem with application in tabu search
Grabowski, J., & Pempera, J. (2001) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2601055 · Cited by 76
Scheduling groups of jobs in the two-machine flow shop
Baker, K. R. (1990) · Mathematical and Computer Modelling · doi:10.1016/0895-7177(90)90368-w · Cited by 70
Raaymakers, W. H. M., & Weijters, T. (2002) · European Journal of Operational Research · doi:10.1016/s0377-2217(02)00173-x · Cited by 53
Parallel Processing and Applied Mathematics
Wyrzykowski, R., Waśniewski, J., Paprzycki, M., & Dongarra, J. J. (2002) · Lecture notes in computer science · doi:10.1007/3-540-48086-2 · Cited by 17
Cited by
Moreno, J., Ovalle, D. A., & Vicari, R. M. (2012) · Computers & Education · doi:10.1016/j.compedu.2011.09.011 · Cited by 172
Metadata
- Authors
- Reza Hejazi *, S., & Saghafian, S.
- Venue
- International Journal of Production Research
- Publisher
- Informa UK Limited
- Published
- 2005-07-15
- Volume
- 43
- Issue
- 14
- Pages
- 2895-2929
- ISSN
- 0020-7543 (ISSN-L)
- 1366-588X
- OpenAlex
- W2001664299
- Cited by
- 342
- References
- 39
- FWCI
- 28.56
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.