The DOI matches its Crossref record.
Smart production scheduling with time-dependent and machine-dependent electricity cost by considering distributed energy resources and energy storage
Abstract
Many countries are actively trying to cope with recent effects of climate change and the energy crisis. At the same time, efficient energy use and the reduction of greenhouse gas emissions are very important, not only to reduce energy costs but also to contribute to an environment-friendly, sustainable lifestyle. Currently, manufacturing industries in some countries pay stratified electricity rates that depend on the time of the day (i.e. peak load, mid-load and off-peak load). Hence, the production scheduling process, which considers time-dependent and machine-dependent electricity costs, enables these industries to minimise energy expenses. Additionally, the emerging Smart Grid is supposed to require industries to pay real-time hourly electricity costs. More energy-efficient, intelligent production scheduling is thus a major goal. This paper deals with minimising the total production cost of the flexible job-shop scheduling problem. Our method allows each decision-maker in the manufacturing industry to seek a compromise solution for total production costs, by considering electricity costs with distributed energy resources and energy storage. We use constraint programming and mixed-integer programming approaches to solve this problem, and compare our proposed models with the classical computational method.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Kusiak, A. (2018) · International Journal of Production Research · doi:10.1080/00207543.2017.1351644 · Cited by 1,330
Energy-efficient scheduling in manufacturing companies: A review and research framework
Gahm, C., Denz, F., Dirr, M., & Tuma, A. (2016) · European Journal of Operational Research · doi:10.1016/j.ejor.2015.07.017 · Cited by 474
A review of energy-efficient scheduling in intelligent production systems
Gao, K., Huang, Y., Sadollah, A., & Wang, L. (2020) · Complex & Intelligent Systems · doi:10.1007/s40747-019-00122-6 · Cited by 274
Metadata
- Authors
- Moon, J.-Y., & Park, J.
- Venue
- International Journal of Production Research
- Publisher
- Informa UK Limited
- Published
- 2013-12-16
- Volume
- 52
- Issue
- 13
- Pages
- 3922-3939
- ISSN
- 0020-7543 (ISSN-L)
- 1366-588X
- OpenAlex
- W1977643613
- Cited by
- 163
- References
- 0
- FWCI
- 11.82
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Smart production scheduling with time-dependent and machine-dependent electricity cost by considering distributed energy resources and energy storage. https://app.cochat.ai/papers/10.1080/00207543.2013.860251
- The paper
- Moon, J.-Y., & Park, J. (2014). Smart production scheduling with time-dependent and machine-dependent electricity cost by considering distributed energy resources and energy storage. International Journal of Production Research. https://doi.org/10.1080/00207543.2013.860251
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.