An exact solution approach for disassembly line balancing problem under uncertainty of the task processing times
Open accessThe DOI matches its Crossref record.
Abstract
The purpose of this work is to efficiently design disassembly lines taking into account the uncertainty of task processing times. The main contribution of the paper is the development of a decision tool that allows decision-makers to choose the best disassembly alternative (process), for an End of Life product (EOL), and assign the corresponding disassembly tasks to the workstations of the line under precedence and cycle time constraints. Task times are assumed to be random variables with known normal probability distributions. The case of presence of hazardous parts is studied and cycle time constraints are to be jointly satisfied with at least a certain probability level, or service level, fixed by the decision-maker. An AND/OR graph is used to model the precedence relationships among tasks. The objective is to minimise the line cost composed of the workstation operation costs and additional costs of workstations handling hazardous parts of the EOL product. To deal with task time uncertainties, lower and upper-bounding schemes using second-order cone programming and approximations with convex piecewise linear functions are developed. The applicability of the proposed solution approach is shown by solving to optimality a set of disassembly problem instances (EOL industrial products) from the literature.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Design, management and control of demanufacturing and remanufacturing systems
Tolio, T., Bernard, A., Colledani, M., Kara, S., Seliger, G., Duflou, J., Battaia, O., & Takata, S. (2017) · CIRP Annals · doi:10.1016/j.cirp.2017.05.001 · Cited by 277
Lean supply chain management: Empirical research on practices, contexts and performance
Tortorella, G. L., Miorando, R., & Marodin, G. (2017) · International Journal of Production Economics · doi:10.1016/j.ijpe.2017.07.006 · Cited by 166
Low-carbon production with low-carbon premium in cap-and-trade regulation
Du, S., Tang, W., & Song, M. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.01.012 · Cited by 166
Lean production and operational performance in the Brazilian automotive supply chain
Marodin, G. A., Frank, A. G., Tortorella, G. L., & Fetterman, D. C. (2019) · Total Quality Management & Business Excellence · doi:10.1080/14783363.2017.1308221 · Cited by 111
Bayesian regularisation neural network based on artificial intelligence optimisation
Yan, D., Zhou, Q., Wang, J., & Zhang, N. (2017) · International Journal of Production Research · doi:10.1080/00207543.2016.1237785 · Cited by 62
Metadata
- Authors
- Bentaha, M. L., Battaïa, O., & Dolgui, A.
- Venue
- International Journal of Production Research
- Publisher
- Informa UK Limited
- Published
- 2014-09-25
- Volume
- 53
- Issue
- 6
- Pages
- 1807-1818
- ISSN
- 0020-7543 (ISSN-L)
- 1366-588X
- OpenAlex
- W1996513145
- Cited by
- 181
- References
- 0
- FWCI
- 21.98
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: An exact solution approach for disassembly line balancing problem under uncertainty of the task processing times. https://app.cochat.ai/papers/10.1080/00207543.2014.961212
- The paper
- Bentaha, M. L., Battaïa, O., & Dolgui, A. (2015). An exact solution approach for disassembly line balancing problem under uncertainty of the task processing times. International Journal of Production Research. https://doi.org/10.1080/00207543.2014.961212
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.