Using a genetic algorithm to schedule the space-constrained AGV-based prefabricated bathroom units manufacturing system
The DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.
Abstract
In this article, scheduling problem of a space-constrained AGV-based prefabricated bathroom units (PBU) manufacturing system is addressed. Space becomes a key resource to this manufacturing system because a very large space is required to accommodate the settling units as well as the queues. Although line balancing helps to reduce the queues, the system is still prone to deadlock due to limited space. Hence, in order to prevent deadlock situations, the production start times of PBUs have to be controlled. A genetic algorithm is proposed with the objective to decide operation for each workstation and to choose a start time for each PBU. The project duration is minimised while satisfying precedence relations and resource availabilities. A rule-based simulation approach is used to estimate the fitness value of every GA chromosomes. At last, the experiment based on data from an industrial project shows that the proposed algorithm has the potential to guide the real practice.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Genetic Algorithms and Engineering Optimization
Gen, M., & Cheng, R. (1999) · doi:10.1002/9780470172261 · Cited by 2,548
Cited by
Baduge, S. K., Thilakarathna, S., Perera, J. S., Arashpour, M., Sharafi, P., Teodosio, B., Shringi, A., & Mendis, P. (2022) · Automation in Construction · doi:10.1016/j.autcon.2022.104440 · Cited by 1,007
“Chen et al. [122] proposed an algorithm to facilitate automated scheduling problems of the production of prefabricated bathroom units manufacturing with space constraints.”
BackgroundRole of artificial intelligence in operations environment: a review and bibliometric analysis
Dhamija, P., & Bag, S. (2020) · The TQM Journal · doi:10.1108/tqm-10-2019-0243 · Cited by 390
Scopus scientific mapping production in industry 4.0 (2011–2018): a bibliometric analysis
Kipper, L. M., Furstenau, L. B., Hoppe, D., Frozza, R., & Iepsen, S. (2020) · International Journal of Production Research · doi:10.1080/00207543.2019.1671625 · Cited by 272
The adoption of Industry 4.0 technologies in SMEs: results of an international study
Agostini, L., & Nosella, A. (2019) · Management Decision · doi:10.1108/md-09-2018-0973 · Cited by 239
Human-robot collaboration in disassembly for sustainable manufacturing
Liu, Q., Liu, Z., Xu, W., Tang, Q., Zhou, Z., & Pham, D. T. (2019) · International Journal of Production Research · doi:10.1080/00207543.2019.1578906 · Cited by 224
Metadata
- Authors
- Chen, C., Tiong, L. K., & Chen, I.-M.
- Venue
- International Journal of Production Research
- Publisher
- Informa UK Limited
- Published
- 2018-09-20
- Pages
- 1-17
- ISSN
- 0020-7543 (ISSN-L)
- 1366-588X
- OpenAlex
- W2890033210
- Cited by
- 110
- References
- 1
- FWCI
- 18.28
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Using a genetic algorithm to schedule the space-constrained AGV-based prefabricated bathroom units manufacturing system. https://app.cochat.ai/papers/10.1080/00207543.2018.1521532
- The paper
- Chen, C., Tiong, L. K., & Chen, I.-M. (2018). Using a genetic algorithm to schedule the space-constrained AGV-based prefabricated bathroom units manufacturing system. International Journal of Production Research. https://doi.org/10.1080/00207543.2018.1521532
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.