Adaptive scheduling for assembly job shop with uncertain assembly times based on dual Q-learning
Open accessThe DOI matches its Crossref record; 13 of the 13 references it cites were found in a registry or an index.
Abstract
To address the uncertainty of production environment in assembly job shop, in combination of the real-time feature of reinforcement learning, a dual Q-learning (D-Q) method is proposed to enhance the adaptability to environmental changes by self-learning for assembly job shop scheduling problem. On the basis of the objective function of minimising the total weighted earliness penalty and completion time cost, the top level Q-learning is focused on localised targets in order to find the dispatching policy which can minimise machine idleness and balance machine loads, and the bottom level Q-learning is focused on global targets in order to learn the optimal scheduling policy which can minimise the overall earliness of all jobs. Some theoretical results and simulation experiments indicate that the proposed algorithm achieves generally better results than the single Q-learning (S-Q) and other scheduling rules, under the arrival frequency of product with different conditions, and show good adaptive performance.Abbreviations: AFSSP, assembly flow shop scheduling problem; AJSSP, assembly job shop scheduling problem; RL, reinforcement learning; TASP, two-stage assembly scheduling problem
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Advances in Neural Information Processing Systems 25
Zhang, Y., Sutton, C. A., Storkey, A., & Zoubin Ghahramani, A. (2012) · Cited by 12,653
Pattern Recognition with Fuzzy Objective Function Algorithms
Bezdek, J. C. (1981) · doi:10.1007/978-1-4757-0450-1 · Cited by 9,881
Watkins, C. J. C. H., & Dayan, P. (1992) · Machine Learning · doi:10.1007/bf00992698 · Cited by 9,083
International Journal of Production Research
HAWKINS, T. H. (1962) · Nature · doi:10.1038/1931144a0 · Cited by 2,111
IEEE Transactions on Systems, Man, and Cybernetics: Systems
(2023) · IEEE Transactions on Systems Man and Cybernetics Systems · doi:10.1109/tsmc.6221021 · Cited by 1,099
(1992) · Springer eBooks · doi:10.1007/978-1-4615-3618-5 · Cited by 331
Dynamic job-shop scheduling using reinforcement learning agents
Aydin, M. E., & Öztemel, E. (2000) · Robotics and Autonomous Systems · doi:10.1016/s0921-8890(00)00087-7 · Cited by 274 · cited 2×
“…advancement of RL in the areas of artificial intelligence, control, decision and programming in recent years, Q-learning is increasingly being applied to production scheduling field (Aydin and Öztemel 2000; Wang and Usher 2007; Yang and Yan2009 ; Zhang, Zheng, and Li 2012; Shiue, Lee, and Su2018).”
MethodReal-time scheduling for a smart factory using a reinforcement learning approach
Shiue, Y.-R., Lee, K.-C., & Su, C.-T. (2018) · Computers & Industrial Engineering · doi:10.1016/j.cie.2018.03.039 · Cited by 225 · cited 1×
“…advancement of RL in the areas of artificial intelligence, control, decision and programming in recent years, Q-learning is increasingly being applied to production scheduling field (Aydin and Öztemel 2000; Wang and Usher 2007; Yang and Yan2009 ; Zhang, Zheng, and Li 2012; Shiue, Lee, and Su2018).”
MethodAl–Anzi, F. S., & Allahverdi, A. (2006) · European Journal of Operational Research · doi:10.1016/j.ejor.2006.09.011 · Cited by 136 · cited 1×
“Some scholars already have made some researches on adaptive scheduling (Al-Anzi and Allahverdi 2007; Norooziet al.2013; Wanget al. 2015; Luo et al. 2017; Jain and Raj2018).”
BackgroundA resource-constrained assembly job shop scheduling problem with Lot Streaming technique
Wong, T. C., Chan, F. T. S., & Chan, L. Y. (2009) · Computers & Industrial Engineering · doi:10.1016/j.cie.2009.04.002 · Cited by 75 · cited 1×
“Wong, Chan, and Chan (2009) used lot streaming techniques for AJSSP, at the same time, a further improvement on the batch flexibility was made by allowing part sharing in AJSSP (Chan, Wong, and Chan 2009); Lu, Huang, and Yang (2011) presented a simulation-based approach for AJSSP considering order…”
MethodNoroozi, A., Mokhtari, H., & Abadi, I. N. K. (2012) · Neurocomputing · doi:10.1016/j.neucom.2012.08.011 · Cited by 37
Wang, Y.-C., & Usher, J. M. (2006) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-006-0465-y · Cited by 29
Two-stage assembly-type flowshop batch scheduling problem subject to a fixed job sequence
Hwang, F.-J., & Lin, B. M. T. (2011) · Journal of the Operational Research Society · doi:10.1057/jors.2011.90 · Cited by 21 · cited 2×
“By now, majority of the assembly scheduling problems fall into AFSSP (Lee, Cheng, and Lin 1993; Hwang and Lin 2012; Wang and Wang 2016; Deng et al.2016; Luo, Liu, and Xing 2018b), where each subassembly of a product requires one or more machining stages with exactly the same order, after that, an…”
BackgroundMethod
Cited by
Deep reinforcement learning for dynamic scheduling of a flexible job shop
Liu, R., Piplani, R., & Toro, C. (2022) · International Journal of Production Research · doi:10.1080/00207543.2022.2058432 · Cited by 310
Luo, S., Zhang, L., & Fan, Y. (2022) · IEEE Transactions on Automation Science and Engineering · doi:10.1109/tase.2021.3104716 · Cited by 235
Kayhan, B. M., & Yildiz, G. (2023) · Journal of Intelligent Manufacturing · doi:10.1007/s10845-021-01847-3 · Cited by 168
“(cid:2) Wang et al. (2020) studied the problem of J // w i E i + TC and proposed a dual Q-learning algorithm to balance the localized targets and global targets and compared the results of the proposed method with a single Q-learning.”
ResultAI Agents and Agentic AI–navigating a plethora of concepts for future manufacturing
Ren, Y., Liu, Y., Ji, T., & Xu, X. (2025) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2025.08.017 · Cited by 66
Metadata
- Authors
- Wang, H., Sarker, B. R., Li, J., & Li, J.
- Venue
- International Journal of Production Research
- Publisher
- Informa UK Limited
- Published
- 2020-07-29
- Volume
- 59
- Issue
- 19
- Pages
- 5867-5883
- ISSN
- 0020-7543 (ISSN-L)
- 1366-588X
- OpenAlex
- W3045574728
- Cited by
- 173
- References
- 13
- FWCI
- 11.19
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.