Student or educator? Sign up with your school email and get 6 months of Pro free.
Cited by 277

The DOI matches its Crossref record.

Computerized shop floor scheduling

GOLDRATT, ELIYAHU M. · 1988 · International Journal of Production Research

Abstract

Computerized shop floor scheduling is probably one of the most glaring examples of an area in which the tremendous efforts and investments of a large number of companies have produced at best only a partial solution. One of the more successful attempts is known as OPTR (optimized production technology) on which numerous papers have been published highlighting the various aspects of this package. What was realized by only a small group of people, namely the user base, was that this package was evolving at an incredible rate from one year to the next. This article describes that evolutionary process from basically a computerized Kanban to an attempted computerization of the Drum-Buffer-Rope technique. The major emphasis will not be so much on the technical developments, but more on the reasoning—gained from the experience of implementing this package—that brought this evolution so quickly to its ultimate conclusion. Namely, the real key lies mainly in the conceptual framework under which we run our organizations.

Overview

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1080/00207548808947875

Cites

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cited by

See all 277

Metadata

Authors
GOLDRATT, E. M.
Venue
International Journal of Production Research
Published
1988-03
Volume
26
Issue
3
Pages
443-455
ISSN
  • 0020-7543 (ISSN-L)
  • 1366-588X
OpenAlex
W1972078654
Cited by
277
References
0
FWCI
24.49
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Computerized shop floor scheduling. https://app.cochat.ai/papers/10.1080/00207548808947875
The paper
GOLDRATT, E. M. (1988). Computerized shop floor scheduling. International Journal of Production Research. https://doi.org/10.1080/00207548808947875

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.