CoChat

A Quantitative Analysis of the Performance of Transportation Projects in Developing Countries

Gamez, Eduardo A., Touran, Ali · 2010 · Transport Reviews

The DOI matches its Crossref record; 6 of the 6 references it cites were found in a registry or an index.

Abstract

This paper presents the results of a detailed quantitative analysis of performance metrics of a sample consisting of 89 transportation projects sponsored by the World Bank. The sample and a subset consisting of 65 projects were evaluated using the performance metrics of project cost, schedule and scope. The effect of project size (dollar value) and project duration on performance metrics was investigated. Also, the achievement of project goals and potential improvement in planning and estimating over time (the learning effect) was studied. It was found that, in general, in transportation projects sponsored by the World Bank, costs are overestimated and schedules are optimistic. The outcome with respect to cost seems counter‐intuitive because previous work by other researchers had shown a systematic underestimation of project costs. There is significant evidence that there are no efficient controls in place to predict or prevent schedule delays. The study also showed that during the past 15 years, no improvement (learning effect) was evident in project cost and duration estimation as the level of accuracy has not changed significantly. Further, it is observed that project duration did not affect the performance with respect to cost and delay.

Overview

Integrity signals

Registry

Crossref · 10.1080/01441640903034070

Cites

6 of 6 references verified0 citation errors · 0 not checkable

Statistics

Recomputing p-values needs the paper’s full text.

Verification

Claims the paper makes

This paper’s full text isn’t openly available, so its claims and self-check weren’t run. The registry and citation checks still apply.

Claims other papers make about this one

Each is checked against this paper’s own text: does it say what the citing paper says it does?

Citations

Cites

Show all 6 references

Research works printed but not linked: 7

  1. 2005, Managing Capital Costs of Major Federally Funded Public Transportation Projects. TCRP Project G‐7
  2. Faulkner, B. and El‐Sharafi, M. From rehab to first class: Analyzing the increase in costs of the old colony commuter railroad project. Paper presented at the proceedings of TRB Conference. January2002, Boston, MA.
  3. Pickrell D. H., 1990, Urban Rail Transit Projects: Forecast versus Actual Ridership and Cost. Project No. DOT‐T‐91‐04
  4. Roberds, W. and McGrath, T. Quantitative cost and schedule risk assessment and risk management for large infrastructure projects. Paper presented at the proceedings of the 3rd PMI College of Scheduling Conference. April2006, Orlando, FL.
  5. 2006, World Bank Annual Report 2006
  6. 2007, A Decade of Action in Transport: An Evaluation of the World Bank Assistance to the Transport Sector, 1995–2005
  7. Harmonized Evaluation Criteria for ICR and OED Evaluations

Cited by

See all 11

Metadata

Authors
Gamez, E. A., & Touran, A.
Affiliations
Northeastern University (US)
Corresponding author
Gamez, Eduardo A.
Venue
Transport Reviews
Published
2010-05
Volume
30
Issue
3
Pages
361-387
ISSN
  • 0144-1647 (ISSN-L)
  • 1464-5327
OpenAlex
W2050372222
Cited by
11
References
6
Citations by year
2026: 1 · 2025: 1 · 2024: 1 · 2022: 3 · 2019: 2 · 2018: 1 · 2014: 1 · 2012: 1
FWCI
0.45
Type
journal article
Language
en
Open access
closed
Locations
  • Transport Reviews (publishedVersion)
  • RePEc: Research Papers in Economics (submittedVersion)
Topics
  • Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
  • Social Sciences › Development › International Development and Aid
  • Social Sciences › Economics, Econometrics and Finance › Finance › Capital Investment and Risk Analysis
Keywords
transportation projects, project performance metrics, cost overruns, schedule delays, project cost estimation, learning effects, project size, project duration, developing countries, World Bank projects, project scope

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: A Quantitative Analysis of the Performance of Transportation Projects in Developing Countries. https://app.cochat.ai/papers/10.1080/01441640903034070
The paper
Gamez, E. A., & Touran, A. (2010). A Quantitative Analysis of the Performance of Transportation Projects in Developing Countries. Transport Reviews. https://doi.org/10.1080/01441640903034070

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.