A Quantitative Analysis of the Performance of Transportation Projects in Developing Countries
The DOI matches its Crossref record; 6 of the 6 references it cites were found in a registry or an index.
Abstract
This paper presents the results of a detailed quantitative analysis of performance metrics of a sample consisting of 89 transportation projects sponsored by the World Bank. The sample and a subset consisting of 65 projects were evaluated using the performance metrics of project cost, schedule and scope. The effect of project size (dollar value) and project duration on performance metrics was investigated. Also, the achievement of project goals and potential improvement in planning and estimating over time (the learning effect) was studied. It was found that, in general, in transportation projects sponsored by the World Bank, costs are overestimated and schedules are optimistic. The outcome with respect to cost seems counter‐intuitive because previous work by other researchers had shown a systematic underestimation of project costs. There is significant evidence that there are no efficient controls in place to predict or prevent schedule delays. The study also showed that during the past 15 years, no improvement (learning effect) was evident in project cost and duration estimation as the level of accuracy has not changed significantly. Further, it is observed that project duration did not affect the performance with respect to cost and delay.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Gamez and Touran [33] studied 89 transportation infrastructure projects funded by the World Bank in 60 developing countries”
From Blockchain Technology: Potential Applications for Public Sector E-Procurement and Project Management (2022) · cites this paper as [33]
In the citing paper
“and claimed that, for large infrastructure projects, costs are overestimated, and the duration is calculated very optimistically due to poor information management.”
From Blockchain Technology: Potential Applications for Public Sector E-Procurement and Project Management (2022) · cites this paper as [33]
In the citing paper
“They also found that the overall project cost was overestimated for 59% of projects and, in case of the project duration, the average project delay was an increase of 35% from the original schedule.”
From Blockchain Technology: Potential Applications for Public Sector E-Procurement and Project Management (2022) · cites this paper as [33]
Citations
Cites
Probability Concepts in Engineering Planning and Design
Ang, A. H. ‐., & Tang, W. H. (1975) · Infoscience (Ecole Polytechnique Fédérale de Lausanne) · Cited by 2,649
Underestimating Costs in Public Works Projects:Error or Lie?
Flyvbjerg, B., Holm, M. S., & Buhl, S. (2002) · Journal of the American Planning Association · doi:10.1080/01944360208976273 · Cited by 1,046 · cited 6×
“Furthermore, Flyvbjerg et al. (2002) reported significant evidence that cost deviation was not a result of chance or error, but instead due to a deliberate underestimation of costs, whereas the data analysed in this report does not present a significant trend other than random error for cost…”
BackgroundResultInfluentialHow common and how large are cost overruns in transport infrastructure projects?
Flyvbjerg, B., Skamris holm, M. K., & Buhl, S. L. (2003) · Transport Reviews · doi:10.1080/01441640309904 · Cited by 783 · cited 6×
“Touran been a concern in the past when project data has been collected from questionnaires or surveys and not from their original sources (Flyvbjerg et al., 2003).”
BackgroundInfluentialBidding Considerations in Developing Countries
Jaselskis, E. J., & Talukhaba, A. A. (1998) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1998)124:3(185 · Cited by 47
Sangrey, D. A., Roberds, W. J., Reilly, J. J., McGrath, T., & Boone, S. (2003) · Cited by 8
RT METRO: FROM SACRAMENTO'S COMMUNITY DREAM TO OPERATING REALITY
Schumann, J. W. (1989) · Special report - Transportation Research Board, National Research Council · Cited by 3
Research works printed but not linked: 7
- 2005, Managing Capital Costs of Major Federally Funded Public Transportation Projects. TCRP Project G‐7
- Faulkner, B. and El‐Sharafi, M. From rehab to first class: Analyzing the increase in costs of the old colony commuter railroad project. Paper presented at the proceedings of TRB Conference. January2002, Boston, MA.
- Pickrell D. H., 1990, Urban Rail Transit Projects: Forecast versus Actual Ridership and Cost. Project No. DOT‐T‐91‐04
- Roberds, W. and McGrath, T. Quantitative cost and schedule risk assessment and risk management for large infrastructure projects. Paper presented at the proceedings of the 3rd PMI College of Scheduling Conference. April2006, Orlando, FL.
- 2006, World Bank Annual Report 2006
- 2007, A Decade of Action in Transport: An Evaluation of the World Bank Assistance to the Transport Sector, 1995–2005
- Harmonized Evaluation Criteria for ICR and OED Evaluations
Cited by
Son, H., Kim, C., & Kim, C. (2012) · Automation in Construction · doi:10.1016/j.autcon.2012.05.013 · Cited by 78
Blockchain Technology: Potential Applications for Public Sector E-Procurement and Project Management
Khalfan, M., Azizi, N., Haass, O., Maqsood, T., & Ahmed, I. (2022) · Sustainability · doi:10.3390/su14105791 · Cited by 57
“Gamez and Touran [33] studied 89 transportation infrastructure projects funded by the World Bank in 60 developing countries, and claimed that, for large infrastructure projects, costs are overestimated, and the duration is calculated very optimistically due to poor information management.”
BackgroundCavalieri, M., Cristaudo, R., & Guccio, C. (2019) · Transport Reviews · doi:10.1080/01441647.2019.1636895 · Cited by 56
“Other studies (Cantarelli, Flyvbjerg, Molin, et al., 2010; Eliasson & Fosgerau, 2013; Gamez & Touran, 2010; Makovšek, 2014; Odeck, 2014) indicate that project sponsors routinely ignore, hide, or otherwise leave out significant project costs and risks to make total costs appear low and, hence, to…”
BackgroundCost and schedule overruns in large hydropower dams: an assessment of projects completed since 2000
Braeckman, J. P., Disselhoff, T., & Kirchherr, J. (2019) · International Journal of Water Resources Development · doi:10.1080/07900627.2019.1568232 · Cited by 30
Owais, M. (2024) · Expert Systems with Applications · doi:10.1016/j.eswa.2024.125563 · Cited by 28
Metadata
- Authors
- Gamez, E. A., & Touran, A.
- Affiliations
- Northeastern University (US)
- Corresponding author
- Gamez, Eduardo A.
- Venue
- Transport Reviews
- Publisher
- Informa UK Limited
- Published
- 2010-05
- Volume
- 30
- Issue
- 3
- Pages
- 361-387
- ISSN
- 0144-1647 (ISSN-L)
- 1464-5327
- OpenAlex
- W2050372222
- Cited by
- 11
- References
- 6
- Citations by year
- 2026: 1 · 2025: 1 · 2024: 1 · 2022: 3 · 2019: 2 · 2018: 1 · 2014: 1 · 2012: 1
- FWCI
- 0.45
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- Transport Reviews (publishedVersion)
- RePEc: Research Papers in Economics (submittedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Social Sciences › Development › International Development and Aid
- Social Sciences › Economics, Econometrics and Finance › Finance › Capital Investment and Risk Analysis
- Keywords
- transportation projects, project performance metrics, cost overruns, schedule delays, project cost estimation, learning effects, project size, project duration, developing countries, World Bank projects, project scope
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: A Quantitative Analysis of the Performance of Transportation Projects in Developing Countries. https://app.cochat.ai/papers/10.1080/01441640903034070
- The paper
- Gamez, E. A., & Touran, A. (2010). A Quantitative Analysis of the Performance of Transportation Projects in Developing Countries. Transport Reviews. https://doi.org/10.1080/01441640903034070
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.