The DOI matches its Crossref record; 3 of the 3 references it cites were found in a registry or an index.
Target value design: using collaboration and a lean approach to reduce construction cost
Abstract
Target costing is an effective management technique that has been used in manufacturing for decades to achieve cost predictability during new product development. Adoption of this technique promises benefits for the construction industry as it struggles to raise the number of successful outcomes and certainty of project delivery in terms of cost, quality and time. Target value design is a management approach that takes the best features of target costing and adapts them to the peculiarities of construction. The concept of target value design is introduced based on the results of action research carried out on 12 construction projects in the USA. It has been shown that systemic application of target value design leads to significant improvement of project performance—the final cost of projects was on average 15% less than market cost. The construction industry already has approaches that have similarities with elements of the target value design process or use the same terminology, e.g. partnering and target cost contracts, cost planning, etc. Following an exploration of the similarities and differences target value design is positioned as a form of target costing for construction that offers a more reliable route to successful project outcomes.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Action Research and Minority Problems
Lewin, K. (1946) · Journal of Social Issues · doi:10.1111/j.1540-4560.1946.tb02295.x · Cited by 6,554
The SAGE Handbook of Action Research
(2015) · doi:10.4135/9781473921290 · Cited by 848
Olawale, Y. A., & Sun, M. (2010) · Construction Management and Economics · doi:10.1080/01446191003674519 · Cited by 478 · cited 3×
“Several papers reporting successful application were published by the lean construction community, for example Pennanen et al. (2010) who provide evidence of positive adaptation of target costing in the Finnish market.”
BackgroundMethod
Metadata
- Authors
- Zimina, D., Ballard, G., & Pasquire, C.
- Venue
- Construction Management and Economics
- Publisher
- Informa UK Limited
- Published
- 2012-05
- Volume
- 30
- Issue
- 5
- Pages
- 383-398
- ISSN
- 0144-6193 (ISSN-L)
- 1466-433X
- OpenAlex
- W2053548512
- Cited by
- 250
- References
- 3
- FWCI
- 20.29
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Target value design: using collaboration and a lean approach to reduce construction cost. https://app.cochat.ai/papers/10.1080/01446193.2012.676658
- The paper
- Zimina, D., Ballard, G., & Pasquire, C. (2012). Target value design: using collaboration and a lean approach to reduce construction cost. Construction Management and Economics. https://doi.org/10.1080/01446193.2012.676658
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.