Route-reduction-based dynamic programming for large-scale satellite range scheduling problem
The DOI matches its Crossref record; 17 of the 17 references it cites were found in a registry or an index.
Abstract
Satellites offer many services through communication with stations, such as tracking, navigation, telecommand uplink, earth observation, etc. How to coordinate these services is referred to as the satellite range scheduling problem (SRSP). In the research, it is found that only the resources (referring to time slots of stations) requested by more than one satellite simultaneously influence scheduling results. These resources are called critical resources and selected as scheduling elements, which makes some jobs optimally served in advance and the problem be decomposable into a multi-stage decision process, so dynamic programming is suitable to be employed. For large-scale SRSPs, a route-reduction-based dynamic programming (RR-DP) is presented, wherein a multi-level route reduction strategy is adopted to alleviate ‘the curse of dimensionality’. Experimental results reveal that RR-DP can find optimal solutions for small-to-medium sized problems and outperforms state-of-the-art methods for large-scale problems.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Citations
Cites
Schedule Optimization Using Genetic Algorithms
Syswerda, G. (1991) · Medical Entomology and Zoology · Cited by 494
Scheduling Space–Ground Communications for the Air Force Satellite Control Network
Barbulescu, L., Watson, J.-P., Whitley, L. D., & Howe, A. E. (2004) · Journal of Scheduling · doi:10.1023/b:josh.0000013053.32600.3c · Cited by 232 · cited 10×
“These algorithms include greedy algorithms (Barbulescu et al. 2004), Lagrangian versions of relaxation-based mixed integer programming (MIP) heuristics (Marinelli et al. 2011) and exact polynomial time algorithms (Vazquez and Erwin 2014), among others.”
BackgroundMethodInfluentialGraph colouring approaches for a satellite range scheduling problem
Zufferey, N., Amstutz, P., & Giaccari, P. (2008) · Journal of Scheduling · doi:10.1007/s10951-008-0066-8 · Cited by 177 · cited 6×
“Through studying the similarities between graph colouring problems (GCPs) and SRSPs, Zufferey, Amstutz, and Giaccari (2008) proposed the TS-MURRSP algorithm, wherein the stations correspond to the colours and the jobs are analogous to the vertices of the graph.”
BackgroundMethodInfluentialA Lagrangian heuristic for satellite range scheduling with resource constraints
Marinelli, F., Nocella, S., Rossi, F., & Smriglio, S. (2011) · Computers & Operations Research · doi:10.1016/j.cor.2011.01.016 · Cited by 177 · cited 4×
“Marinelli et al. (2011) proposed a Lagrangian fix-and-relaxMIP heuristic (L-FR-Heu) which searches froman infeasible solution obtained fromaLagrangian relaxation of the problem.”
BackgroundMethodInfluentialXu, R., Chen, H., Liang, X., & Wang, H. (2016) · Expert Systems with Applications · doi:10.1016/j.eswa.2015.12.039 · Cited by 165 · cited 1×
“The first one takes jobs as scheduling elements (Barbulescu et al. 2004; Zufferey, Amstutz, and Giaccari 2008; Marinelli et al. 2011; Liu et al. 2014; Xu et al. 2016).”
BackgroundMulti-satellite control resource scheduling based on ant colony optimization
Zhang, Z., Zhang, N., & Feng, Z. (2013) · Expert Systems with Applications · doi:10.1016/j.eswa.2013.10.014 · Cited by 129
Self-citationOn the tractability of satellite range scheduling
Vazquez, A. J., & Erwin, R. S. (2015) · Optimization Letters · doi:10.1007/s11590-014-0744-8 · Cited by 61
Multi satellites scheduling algorithm based on task merging mechanism
Xiaolu, L., Baocun, B., Yingwu, C., & Feng, Y. (2014) · Applied Mathematics and Computation · doi:10.1016/j.amc.2013.12.109 · Cited by 59 · cited 1×
“The first one takes jobs as scheduling elements (Barbulescu et al. 2004; Zufferey, Amstutz, and Giaccari 2008; Marinelli et al. 2011; Liu et al. 2014; Xu et al. 2016).”
BackgroundGuidance-solution based ant colony optimization for satellite control resource scheduling problem
Zhang, N., Feng, Z., & Ke, L. (2010) · Applied Intelligence · doi:10.1007/s10489-010-0234-3 · Cited by 32
Self-citationFireworks algorithm for the multi-satellite control resource scheduling problem
Liu, Z., Feng, Z., & Ke, L. (2015) · IEEE Congress on Evolutionary Computation (CEC) · doi:10.1109/cec.2015.7257036 · Cited by 32 · cited 2×
“When an LEO satellite passes over, the arcs created with different stations may have overlaps (Zhang, Feng, and Ke 2011; Zhang, Zhang, and Feng 2014; Liu, Feng, and Ke 2015; Zhang et al. 2018).”
BackgroundSelf-citation
Research works printed but not linked: 1
- Bertsekas Dimitri P., 1999, Nolinear Programming
Cited by
Deep Reinforcement Learning Method for Satellite Range Scheduling Problem
Ou, J., Xing, L., Yao, F., Li, M., Lv, J., He, Y., Song, Y., Wu, J., & Zhang, G. (2023) · Swarm and Evolutionary Computation · doi:10.1016/j.swevo.2023.101233 · Cited by 91
Satellite Scheduling Problems: A survey of applications in Earth and outer space observation
Ferrari, B., Cordeau, J., Delorme, M., Iori, M., & Orosei, R. (2024) · Computers & Operations Research · doi:10.1016/j.cor.2024.106875 · Cited by 62
“Finally, to simplify the problem Liu et al. (2019) considered as the resource set only the critical resources, i.e., ground stations requested by more than one satellite simultaneously.”
BackgroundWang, T., Luo, Q., Zhou, L., & Wu, G. (2023) · Swarm and Evolutionary Computation · doi:10.1016/j.swevo.2023.101396 · Cited by 36
Wang, T., Gu, Y., Wang, H., & Wu, G. (2024) · Computers & Operations Research · doi:10.1016/j.cor.2024.106757 · Cited by 35
Energy-Efficient Satellite Range Scheduling Using a Reinforcement Learning-Based Memetic Algorithm
Song, Y., Suganthan, P. N., Pedrycz, W., Yan, R., Fan, D., & Zhang, Y. (2024) · IEEE Transactions on Aerospace and Electronic Systems · doi:10.1109/taes.2024.3371964 · Cited by 42
“Somestudies have also focused on minimizing task failure rate [18] and maximizing task priority [19] as optimization objectives.”
BackgroundChen, J., Chen, M., Wen, J., He, L., & Liu, X. (2022) · Mathematics · doi:10.3390/math10193498 · Cited by 26
Chen, H., Zhang, X., Wang, L., Xing, L., & Pedrycz, W. (2022) · Knowledge-Based Systems · doi:10.1016/j.knosys.2022.109496 · Cited by 19
Xiong, M., Xiong, W., & Liu, Z. (2023) · Complex & Intelligent Systems · doi:10.1007/s40747-023-01008-4 · Cited by 18
“(1) Exact algori thm : Some researchers formulate the scheduling problem as a linear or nonlinear programming problem and solve it with mathematical programming approaches, such as mixed integer programming with Lagrangian-relaxation [3], branch and cut [4], exact polynomial time algorithm [5] and dynamic programming…”
BackgroundSelf-citationA Hybrid Discrete Artificial Bee Colony Algorithm for Imaging Satellite Mission Planning
Yang, Y., & Liu, D. (2023) · IEEE Access · doi:10.1109/access.2023.3269066 · Cited by 16
“Liu et al. [4] used a multilevel path reduction dynamic planning method to deal with the satellite mission planning problem and obtained optimal solutions in small and medium-sized problems.”
MethodReviews and prospects in satellite range scheduling problem
Li, S., Yu, Q., & Ding, H. (2023) · Autonomous Intelligent Systems · doi:10.1007/s43684-023-00054-6 · Cited by 23
“[10] decomposed problem into a multi-stage decision process based on the identification of critical resources, and designed a route-reduction-based DP to alleviate the dimension disaster.”
BackgroundMethodDistributed Imaging Satellite Mission Planning Based on Multi-Agent
Yang, Y., & Liu, D. (2023) · IEEE Access · doi:10.1109/access.2023.3289964 · Cited by 13
“planning can be divided into exact algorithm [7], [8], heuristic”
BackgroundA Satellite Observation Data Transmission Scheduling Algorithm Oriented to Data Topics
Chen, H., Zhai, B., Wu, J., Du, C., & Li, J. (2020) · International Journal of Aerospace Engineering · doi:10.1155/2020/2180674 · Cited by 12
“Liu et al. [16] decomposed the satellite range scheduling problem into a multistage decision process.”
BackgroundMethodEvolutionary Multiobjective Satellite Range Scheduling With Learning-Guided Population Generation
Xiong, M., Xiong, W., & Liu, Z. (2022) · IEEE Access · doi:10.1109/access.2022.3197637 · Cited by 8
Self-citationHe, L., Jia, Z., Wang, J., Lansard, E., Han, Z., & Yuen, C. (2025) · IEEE Transactions on Network and Service Management · doi:10.1109/tnsm.2025.3561266 · Cited by 6
“The deterministic algorithms use mathematical tools, such as tree search [22] and dynamic programming [23], to find an optimal solution under mild assumptions.”
Chen, C., Li, L., Du, Y., Yao, F., & Xing, L. (2025) · Frontiers of Engineering Management · doi:10.1007/s42524-025-4098-y · Cited by 4
“SGNOP is characterized by having robust linear constraints; therefore, this may offer an option of solving them by exact algorithms (Liu et al., 2019).”
Dobariya, R., & Hobiger, T. (2026) · CEAS Space Journal · doi:10.1007/s12567-026-00726-y · Cited by 3
Energy-Efficient Data Offloading for Earth Observation Satellite Networks
He, L., Jia, Z., Wang, J., Wang, F., Lansard, E., & Yuen, C. (2024) · IEEE Vehicular Technology Conference · doi:10.1109/vtc2024-spring62846.2024.10682994 · Cited by 2
“The scheduling algorithms proposed in these works are either deterministic [7], [8] or non-deterministic [9]–[13].”
BackgroundMethodDynamic Scheduling of Distributed Agile Satellites
Bai, J., & Zhang, Q. (2023) · International Conference on Electrical, Mechanical and Computer Engineering (ICEMCE) · doi:10.1109/icemce60359.2023.10490780
Long, X., Yang, L., Huang, H., & Xu, S. (2024) · SSRN Electronic Journal · doi:10.2139/ssrn.4841712
Satellite Resource Scheduling: Compaction Strategies for Genetic Algorithm Schedulers
Whitley, D., de Carvalho, O. Q., Roberts, M., Shetty, V., & Jampathom, P. (2024) · Lecture notes in computer science · doi:10.1007/978-3-031-70085-9_21
Meng, D., Liu, Z., Gao, Y.-H., Feng, Z., Guo, W., & Ren, Z. (2024) · IEEE Access · doi:10.1109/access.2024.3462765
“Liu et al. [112] presented a route-reduction-based dynamic programming for large-scale SRSP to alleviate ‘the curse of dimensionality’ after decomposing into a multi-stage decision process.”
BackgroundMethodInfluentialSelf-citationZhou, T., Chen, Y., Chen, M., Wang, H., Chun, J., & Lin, X. (2025) · International Conference on Big Data and Information Analytics (BigDIA) · doi:10.1109/bigdia68682.2025.11382797
“Liu [9] proposed a multi-stage decision framework suitable for dynamic programming and designed a two-level path-pruning dynamic programming algorithm that effectively obtains optimal solutions for small-and medium-scale instances.”
Long, X., Leping, Y. A. N. G., Zhu, Y., Weiwei, C. A. I., Huang, H., & Zhao, X. (2026) · Acta Astronautica · doi:10.1016/j.actaastro.2026.07.057
Memon, S. A., & Azam, F. (2026) · SSRN Electronic Journal · doi:10.2139/ssrn.7484821
A Resource Scheduling Algorithm for Optical Ground Stations Supporting Satellite Observation Tasks
Zhai, S., Cheng, W., & Zhang, T. (2026) · Aerospace · doi:10.3390/aerospace13100892
Metadata
- Authors
- Liu, Z., Feng, Z., & Ren, Z.
- Affiliations
- Xi'an Jiaotong University (CN)
- Corresponding author
- Feng, Zuren
- Venue
- Engineering Optimization
- Publisher
- Informa UK Limited
- Published
- 2019-01-24
- Volume
- 51
- Issue
- 11
- Pages
- 1944-1964
- ISSN
- 0305-215X (ISSN-L)
- 1029-0273
- OpenAlex
- W2912997292
- Cited by
- 24
- References
- 17
- Citations by year
- 2026: 3 · 2025: 3 · 2024: 7 · 2023: 7 · 2022: 3 · 2020: 1
- FWCI
- 0.74
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- Engineering Optimization (publishedVersion)
- Funders
- National Natural Science Foundation of China (61873199)
- Topics
- Physical Sciences › Engineering › Aerospace Engineering › Satellite Communication Systems
- Physical Sciences › Engineering › Industrial and Manufacturing Engineering › Scheduling and Optimization Algorithms
- Physical Sciences › Engineering › Industrial and Manufacturing Engineering › Vehicle Routing Optimization Methods
- Keywords
- dynamic programming, multi-stage decision making, critical resources, time slot allocation, curse of dimensionality, large-scale scheduling, satellite communication services
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.