Student or educator? Sign up with your school email and get 6 months of Pro free.
Cited by 247

The DOI matches its Crossref record; 2 of the 2 references it cites were found in a registry or an index.

Barriers in green lean six sigma product development process: an ISM approach

Kumar, Sanjay, Luthra, Sunil, Govindan, Kannan, Kumar, Naveen, Haleem, Abid·2016·Production Planning & Control

Abstract

In today’s competitive globalised business environment, production cost cutting is a primary issue before operation managers. As a research area, green lean six sigma (GLS) is proposed to have strategic importance in product development towards cutting costs, contributing to optimisation, and achieving sustainability. This research requirement has been realised to draw benefits out of three recent and involved approaches (green, lean and six sigma). In this research, an attempt has been made to address barriers in GLS product development (GLSPD) from an extensive literature review and from experts’ opinions towards developing a hierarchical model structuring these barriers. Twenty-one barriers have been identified and sorted from the review of literature and were then validated through discussions with experts. Relationships (contextual in nature) among these barriers have been realised during a brainstorming session. An interpretive structural modelling (ISM) technique has been utilised for developing a hierarchical model of barriers in implementing the GLSPD process in the automobile sector of India. A nine-level structural model has been deduced after application of the ISM technique, which shows ‘Competition and Uncertainty’ as the topmost output of the model and ‘Lack of Total Top Management Commitment’ as the bottom-level input to other barriers of the model. Further, MICMAC analysis has been also done to classify these barriers for better understanding; seven barriers are identified as driver barriers, nine as dependent, five barriers as linkage and no barrier as autonomous. An analysis of interdependence and interactions among these barriers may help supply chain managers reach a better understanding of barriers. Thus, managers may be helped in prioritising and managing barriers in order to gain a competitive advantage from GLS concept implementation in product development.

Overview

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1080/09537287.2016.1165307

Cites

2 of 2 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 2 references

Cited by

See all 247

Metadata

Authors
Kumar, S., Luthra, S., Govindan, K., Kumar, N., & Haleem, A.
Venue
Production Planning & Control
Published
2016-05-04
Pages
1-17
ISSN
  • 0953-7287 (ISSN-L)
  • 1366-5871
OpenAlex
W2345602496
Cited by
247
References
2
FWCI
40.38
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Barriers in green lean six sigma product development process: an ISM approach. https://app.cochat.ai/papers/10.1080/09537287.2016.1165307
The paper
Kumar, S., Luthra, S., Govindan, K., Kumar, N., & Haleem, A. (2016). Barriers in green lean six sigma product development process: an ISM approach. Production Planning & Control. https://doi.org/10.1080/09537287.2016.1165307

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.