Resourcing challenges for post-disaster housing reconstruction: a comparative analysis
The DOI matches its Crossref record; 23 of the 23 references it cites were found in a registry or an index.
Abstract
Post-disaster housing reconstruction is likely to suffer project deficiencies in relation to the availability of resources. Inefficiencies in dealing with resource shortages in the aftermath of a catastrophe can trigger economic and environmental impacts on the affected areas. Based on data collected from field research in China, Indonesia, and Australia, three types of resource-led reconstruction strategies are compared: government driven, donor driven, and market driven. Conventional interventions from the Chinese government (e.g. price restrictions and discouraging profiteering to regulate the market) were unable to meet the long-term reconstruction needs after the Wenchuan earthquake (2008). Complexity inherent in both internal and external environments in Indonesia compromised donors' efforts in post-tsunami (2004) resource procurement. Market-oriented resourcing processes in Australian bushfire (2009) reconstruction are unlikely to succeed without facilitated solutions from the government and institutions. The answer to effective resource management for post-disaster reconstruction lies in the appropriateness of the responses and improvements to address resourcing challenges. The success of resourcing depends on multi-stakeholder collaboration and the development of polices, plans, and tools to allow market flexibility, donor management, and government intervention. Il est probable que la reconstruction de logements après une catastrophe se trouve confrontée à des insuffisances liées à la disponibilité des ressources pour les projets de construction. Le manque d'efficacité dans le traitement des pénuries de ressources suite à une catastrophe peut déclencher des répercussions économiques et environnementales sur les zones affectées. En se fondant sur les données tirées d’études de terrain en Chine, en Indonésie et en Australie, trois types de stratégies de reconstruction impulsées par les ressources sont comparés, mettant l'accent respectivement sur les gouvernements, les donateurs et le marché. Les interventions classiques du gouvernement chinois (par ex. limiter les prix et dissuader de faire des bénéfices excessifs pour réguler le marché) n'ont pas permis de répondre aux besoins de reconstruction à long terme après le tremblement de terre de Wenchuan (2008). La complexité inhérente aux environnements intérieurs aussi bien qu'extérieurs en Indonésie a mis en péril les efforts des donateurs concernant l'approvisionnement en ressources après le tsunami (2004). Il y a peu de chances que les processus de sourcing privilégiant le marché lors de la reconstruction suite aux incendies dans le bush australien (2009) puissent réussir sans des solutions facilitées par le gouvernement et les institutionnels. La réponse à apporter pour qu'une gestion efficace des ressources permette la reconstruction après une catastrophe réside dans la justesse des réponses et des améliorations faites pour relever les défis du sourcing. La réussite du sourcing dépend d'une collaboration entre les diverses parties prenantes et du développement de politiques, de plans et d'outils qui assureront la flexibilité du marché, la gestion des donateurs et l'intervention gouvernementale. Mots clés: préparation aux situations d'urgence, logement, organisations non gouvernementales (ONG), reconstruction après une catastrophe, disponibilité des ressources, gestion des ressources, sourcing, durabilité
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
(1984) · Cited by 81,983
Hartley, J. (2004) · Essential Guide to Qualitative Methods in Organizational Research · doi:10.4135/9781446280119.n26 · Cited by 15,461
Focus Groups: A Practical Guide for Applied Research
Billson, J. M. (1989) · Human Biology · Cited by 8,560
A new framework for determining critical success/failure factors in projects
Belassi, W., & Tukel, O. I. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00064-x · Cited by 1,187 · cited 2×
“Poor-quality materials can directly cause the failure of physical connections between construction elements (Belassi and Tukel, 1996) or interrupt such connections when defective materials are replaced (Love et al.”
BackgroundPerformance Measurement in Construction
Bassioni, H. A., Price, A. D. F., & Hassan, T. M. (2004) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2004)20:2(42 · Cited by 383 · cited 1×
“The availability of resources has been recognized by a number of scholars as a driving force necessary for a successful construction project (Tukel and Rom, 1998; Chua et al. 1999; Bassioni et al. 2004, 2005).”
BackgroundCho, S., Gordon, P., Moore, J. E., II, Richardson, H. W., Shinozuka, M., & Chang, S. E. (2001) · Journal of Regional Science · doi:10.1111/0022-4146.00206 · Cited by 229 · cited 1×
“This, if combined with disruption of transportation and energy supply (Cho et al., 2001), and pre-existing historical problems of the local industry (Singh and Wilkinson, 2008), could significantly exacerbate the difficulty in procuring building expertise and materials (Jayasuriya and McCawley, 2008), leading to proje…”
BackgroundDisaster hits home: new policy for urban housing recovery
(1999) · Choice Reviews Online · doi:10.5860/choice.36-5361 · Cited by 198
Material and equipment procurement delays in highway projects in Nepal
Manavazhi, M. R., & Adhikari, D. K. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00027-3 · Cited by 152 · cited 1×
“Material delays, especially long-lead items, are a well-known cause for construction delays and can also trigger other relevant resourcing issues (Manavazhi and Adhikari, 2002).”
BackgroundImpediments to recovery in New Orleans' Upper and Lower Ninth Ward: one year after Hurricane Katrina
Green, R., Bates, L. K., & Smyth, A. W. (2007) · Disasters · doi:10.1111/j.1467-7717.2007.01011.x · Cited by 136 · cited 2×
“A lack of suitable resources and alternatives (Russell, 2005; Zuo and Wilkinson, 2008), the disruption of access to available resources (Green et al., 2007), and limited ways of procuring resources (Brunsdon et al., 1996; Oxfam Australia et al., 2007) would further intensify competition among…”
BackgroundRework: a symptom of a dysfunctional supply-chain
Love, P. E. D., Li, H., & Mandal, P. (1999) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(98)00017-3 · Cited by 134 · cited 1×
“Poor-quality materials can directly cause the failure of physical connections between construction elements (Belassi and Tukel, 1996) or interrupt such connections when defective materials are replaced (Love et al., 1999).”
Background
Metadata
- Authors
- Chang, Y., Wilkinson, S., Potangaroa, R., & Seville, E.
- Venue
- Building Research & Information
- Publisher
- Informa UK Limited
- Published
- 2010-04-21
- Volume
- 38
- Issue
- 3
- Pages
- 247-264
- ISSN
- 0961-3218 (ISSN-L)
- 1466-4321
- OpenAlex
- W2150904998
- Cited by
- 166
- References
- 23
- FWCI
- 10.02
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Resourcing challenges for post-disaster housing reconstruction: a comparative analysis. https://app.cochat.ai/papers/10.1080/09613211003693945
- The paper
- Chang, Y., Wilkinson, S., Potangaroa, R., & Seville, E. (2010). Resourcing challenges for post-disaster housing reconstruction: a comparative analysis. Building Research & Information. https://doi.org/10.1080/09613211003693945
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.