Use of Prefabrication to Minimize Construction Waste - A Case Study Approach
The DOI matches its Crossref record.
Abstract
The increasing awareness of environmental impacts from construction waste has aroused much public concern. Some construction organizations have included waste management as one of the major functions of construction project management. As a result, some approaches and methods for managing construction waste have been developed. Replacing wet-trade activities with prefabrication is advocated as one of the waste minimization techniques on site. However, the adoption of prefabrication is mainly confined to public housing developments in Hong Kong. This paper uses four private building projects as case studies to demonstrate the effectiveness in the use of prefabrication to minimize construction waste in Hong Kong. The wastage levels of the four projects are compared with conventional cast in-situ methods under similar project natures and conditions. The hindrances and the future trend of adopting prefabrication in Hong Kong are also examined.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Jaillon, L., Poon, C. S., & Chiang, Y. H. (2009) · Waste Management · doi:10.1016/j.wasman.2008.02.015 · Cited by 592
Zhang, C., Hu, M., Di Maio, F., Sprecher, B., Yang, X., & Tukker, A. (2022) · Science of The Total Environment · doi:10.1016/j.scitotenv.2021.149892 · Cited by 514
Salvaging building materials in a circular economy: a BIM-based whole-life performance estimator
Akanbi, L. A., Oyedele, L. O., Akinade, O. O., Ajayi, A. O., Davila Delgado, M., Bilal, M., & Bello, S. A. (2018) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2017.10.026 · Cited by 468
“The use of prefabricated assemblies in buildings also contributes greatly to the reduction of construction and demolition wastes (Baldwin et al., 2008; Tam et al., 2005; Lu and Yuan, 2013).”
BackgroundJaillon, L., & Poon, C. S. (2008) · Construction Management and Economics · doi:10.1080/01446190802259043 · Cited by 405
Jaillon, L., & Poon, C. S. (2009) · Automation in Construction · doi:10.1016/j.autcon.2008.09.002 · Cited by 367
Metadata
- Authors
- Tam, C. M., Tam, V. W. Y., Chan, J. K. W., & Ng, W. C. Y.
- Venue
- International Journal of Construction Management
- Publisher
- Informa UK Limited
- Published
- 2005-01
- Volume
- 5
- Issue
- 1
- Pages
- 91-101
- ISSN
- 1562-3599 (ISSN-L)
- 2331-2327
- OpenAlex
- W2031215151
- Cited by
- 116
- References
- 0
- FWCI
- 5.42
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Use of Prefabrication to Minimize Construction Waste - A Case Study Approach. https://app.cochat.ai/papers/10.1080/15623599.2005.10773069
- The paper
- Tam, C. M., Tam, V. W. Y., Chan, J. K. W., & Ng, W. C. Y. (2005). Use of Prefabrication to Minimize Construction Waste - A Case Study Approach. International Journal of Construction Management. https://doi.org/10.1080/15623599.2005.10773069
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.