The DOI matches its Crossref record; 11 of the 11 references it cites were found in a registry or an index.
A framework to minimise total energy consumption and total tardiness on a single machine
Open accessAbstract
A great amount of energy is wasted in industry by machines that remain idle due to underutilisation. A way to avoid wasting energy and thus reducing the carbon print of an industrial plant is to consider minimisation of energy consumption objective while making scheduling decisions. To minimise energy consumption, the decision maker has to decide the timing and length of turn off/turn on operation (a setup) and also provide a sequence of jobs that minimises the scheduling objective, assuming that all jobs are not available at the same time. In this paper, a framework to solve a multiobjective optimisation problem that minimises total energy consumption and total tardiness is proposed. Since total tardiness problem with release dates is an NP‐hard problem, a new greedy randomised multiobjective adaptive search metaheuristic is utilised to obtain an approximate pareto front (i.e. an approximate set of non‐dominated solutions). Analytical Hierarchy Process is utilised to determine the ‘best’ alternative among the solutions on the pareto front. The proposed framework is illustrated in a case study. It is shown that a wide variety of dispersed solutions can be obtained via the proposed framework, and as total tardiness decreases, total energy consumption increases.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Multiple Criteria Optimization: Theory, Computation, and Application
Laundy, R. S. (1989) · Cited by 3,420
Greedy Randomized Adaptive Search Procedures
Feo, T. A., & Resende, M. G. C. (1995) · Journal of Global Optimization · doi:10.1007/bf01096763 · Cited by 2,778
Greedy Randomized Adaptive Search Procedures
Resende, M. G. C., & Ribeiro, C. C. (2006) · International Series in Operations Research & Management Science · doi:10.1007/0-306-48056-5_8 · Cited by 2,310
Complexity of Machine Scheduling Problems
Lenstra, J. K., Rinnooy Kan, A. H. G., & Brucker, P. (1977) · Annals of Discrete Mathematics · doi:10.1016/s0167-5060(08)70743-x · Cited by 2,197
Evolutionary algorithms for multiobjective optimization: methods and applications
Zitzler, E. (1999) · doi:10.3929/ethz-a-003856832 · Cited by 1,965
Moutinho, L., & Curry, B. (1994) · ENLIGHTEN (Jurnal Bimbingan dan Konseling Islam) · Cited by 1,813
Operational methods for minimization of energy consumption of manufacturing equipment
Mouzon, G., Yildirim, M. B., & Twomey, J. (2007) · International Journal of Production Research · doi:10.1080/00207540701450013 · Cited by 597
Self-citationMulti-objective meta-heuristics: An overview of the current state-of-the-art
Jones, D. F., Mirrazavi, S. K., & Tamiz, M. (2002) · European Journal of Operational Research · doi:10.1016/s0377-2217(01)00123-0 · Cited by 567
Parallel GRASP with path-relinking for job shop scheduling
Aiex, R. M., Binato, S., & Resende, M. G. C. (2003) · Parallel Computing · doi:10.1016/s0167-8191(03)00014-0 · Cited by 218
A branch-and-bound algorithm to minimize total tardiness with different release dates
Chu, C. (1992) · Naval Research Logistics (NRL) · doi:10.1002/1520-6750(199203)39:2<265::aid-nav3220390209>3.0.co;2-l · Cited by 123
Cited by
A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction
Fang, K., Uhan, N., Zhao, F., & Sutherland, J. W. (2011) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2011.08.004 · Cited by 552
Energy-efficient scheduling in manufacturing companies: A review and research framework
Gahm, C., Denz, F., Dirr, M., & Tuma, A. (2016) · European Journal of Operational Research · doi:10.1016/j.ejor.2015.07.017 · Cited by 474
Dai, M., Tang, D., Giret, A., Salido, M. A., & Li, W. D. (2013) · Robotics and Computer-Integrated Manufacturing · doi:10.1016/j.rcim.2013.04.001 · Cited by 466
A Review of Engineering Research in Sustainable Manufacturing
Haapala, K. R., Zhao, F., Camelio, J., Sutherland, J. W., Skerlos, S. J., Dornfeld, D. A., Jawahir, I. S., Clarens, A. F., & Rickli, J. L. (2013) · Journal of Manufacturing Science and Engineering · doi:10.1115/1.4024040 · Cited by 432
Hybrid flow shop scheduling considering machine electricity consumption cost
Luo, H., Du, B., Huang, G. Q., Chen, H., & Li, X. (2013) · International Journal of Production Economics · doi:10.1016/j.ijpe.2013.01.028 · Cited by 381
Metadata
- Authors
- Mouzon, G., & Yildirim, M. B.
- Venue
- International Journal of Sustainable Engineering
- Publisher
- Informa UK Limited
- Published
- 2008-06
- Volume
- 1
- Issue
- 2
- Pages
- 105-116
- ISSN
- 1939-7038 (ISSN-L)
- 1939-7046
- OpenAlex
- W2066555597
- Cited by
- 315
- References
- 11
- FWCI
- 10.13
- Type
- journal article
- Language
- en
- Open access
- bronze
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: A framework to minimise total energy consumption and total tardiness on a single machine. https://app.cochat.ai/papers/10.1080/19397030802257236
- The paper
- Mouzon, G., & Yildirim, M. B. (2008). A framework to minimise total energy consumption and total tardiness on a single machine. International Journal of Sustainable Engineering. https://doi.org/10.1080/19397030802257236
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.