CoChat

IGS/BIPM pilot project: GPS carrier phase for time/frequency transfer and timescale formation

Open access
Ray, J, Senior, K · 2003 · Metrologia
Cited by 89

The DOI matches its Crossref record.

Abstract

The development within the International GPS Service (IGS) of a suite of clock products, for both satellites and tracking receivers, offers some experiences which mirror the operations of the Bureau International des Poids et Mesures (BIPM) in its formation of TAI/UTC but some aspects differ markedly. The IGS relies exclusively on the carrier phase-based geodetic technique whereas BIPM time/frequency transfers use only common-view and two-way satellite (TWSTFT) methods. The carrier-phase approach has the potential of very high precision but suitable instrumental calibration procedures are only in the initial phases of deployment; the current BIPM techniques are more mature and widely used among timing labs, but are either less precise (common-view) or much more expensive (TWSTFT). In serving its geodetic users, the essential requirement for IGS clock products is that they be fully self-consistent in relative terms and also fully consistent with all other IGS products, especially the satellite orbits, in order to permit an isolated user to apply them with accuracy of a few centimetres. While there is no other strong requirement for the IGS timescale except to be reasonably close to broadcast GPS time, it is nonetheless very desirable for the IGS clock products to possess additional properties, such as being highly stable and being accurately relatable to UTC. These qualities enhance the value of IGS clock products for applications other than pure geodesy, especially for timing operations. The jointly sponsored `IGS/BIPM Pilot Project to Study Accurate Time and Frequency Comparisons using GPS Phase and Code Measurements' is developing operational strategies to exploit geodetic GPS methods for improved global time/frequency comparisons to the mutual benefit of both organizations. While helping the IGS to refine its clock products and link them to UTC, this collaboration will also provide new time transfer results for the BIPM that may eventually improve the formation of TAI and allow meaningful comparisons of new cold atom clocks. Thus far, geodetic receivers have been installed at many timing labs, a new internally realized IGS timescale has been produced using a weighted ensemble algorithm, and instrumental calibration procedures developed. Formulating a robust frequency ensemble from a globally distributed network of clocks presents unique challenges compared with intra-laboratory timescales. We have used these products to make a detailed study of the observed time transfer performance for about 30 IGS stations equipped with H-maser frequency standards. The results reveal a large dispersion in quality which can often be related to differences in local station factors. The main elements of the Project's original plan are now largely completed or in progress. In major ways, the experiences of this joint effort can serve as a useful model for future distributed timing systems, for example, Galileo and other GNSS operations.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1088/0026-1394/40/3/307

Cites

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cited by

See all 89

Metadata

Authors
Ray, J., & Senior, K.
Venue
Metrologia
Published
2003-06
Volume
40
Issue
3
Pages
S270-S288
ISSN
  • 0026-1394 (ISSN-L)
  • 1681-7575
OpenAlex
W2126028176
Cited by
89
References
0
FWCI
16.43
Type
journal article
Language
en
Open access
bronze

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: IGS/BIPM pilot project: GPS carrier phase for time/frequency transfer and timescale formation. https://app.cochat.ai/papers/10.1088/0026-1394/40/3/307
The paper
Ray, J., & Senior, K. (2003). IGS/BIPM pilot project: GPS carrier phase for time/frequency transfer and timescale formation. Metrologia. https://doi.org/10.1088/0026-1394/40/3/307

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.