Critical factors of MRP implementation in small and medium‐sized firms
The DOI matches its Crossref record.
Abstract
The paper deals with the implementation process of material requirements planning (MRP) within small and medium‐sized firms. While the literature shows almost general agreement on the critical factors of MRP implementation, few empirical studies exist to support the proposed elements. The purpose of this study is to identify the elements of MRP implementation that are required to ensure successful implementation. A number of elements of implementation were identified and subsequently grouped into a hierarchical structure consisting of eight broader elements. Criteria were selected as measures of the level of implementation success. The analysis revealed that only a few of the identified elements were indeed required for successful implementation. Among these are management support, level of functional integration and data accuracy.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
The industrial management of SMEs in the era of Industry 4.0
Moeuf, A., Pellerin, R., Lamouri, S., Tamayo-Giraldo, S., & Barbaray, R. (2018) · International Journal of Production Research · doi:10.1080/00207543.2017.1372647 · Cited by 1,188
“As was the case with previous production planning and control systems, such as MRP, ERP and MES information systems, we can expect that methodologies developed for large organisations will not fit the needs and constraints of SMEs.”
MethodIdentification of critical success factors, risks and opportunities of Industry 4.0 in SMEs
Moeuf, A., Lamouri, S., Pellerin, R., Tamayo-Giraldo, S., Tobon-Valencia, E., & Eburdy, R. (2020) · International Journal of Production Research · doi:10.1080/00207543.2019.1636323 · Cited by 515
Critical success factors for TQM implementation and their impact on performance of SMEs
Ismail Salaheldin, S. (2009) · International Journal of Productivity and Performance Management · doi:10.1108/17410400910938832 · Cited by 386
Loh, T. C., & Koh *, S. C. L. (2004) · International Journal of Production Research · doi:10.1080/00207540410001671679 · Cited by 311
A literature review of lean manufacturing
Gupta, S., & Jain, S. K. (2013) · International Journal of Management Science and Engineering Management · doi:10.1080/17509653.2013.825074 · Cited by 228
“Petroni (2002) found that there are many problems involved in the proper execution of MRP systems.”
Background
Metadata
- Authors
- Petroni, A.
- Venue
- International Journal of Operations & Production Management
- Publisher
- Emerald
- Published
- 2002-03-01
- Volume
- 22
- Issue
- 3
- Pages
- 329-348
- ISSN
- 0144-3577 (ISSN-L)
- OpenAlex
- W1969498397
- Cited by
- 102
- References
- 0
- FWCI
- 6.74
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Critical factors of MRP implementation in small and medium‐sized firms. https://app.cochat.ai/papers/10.1108/01443570210417623
- The paper
- Petroni, A. (2002). Critical factors of MRP implementation in small and medium‐sized firms. International Journal of Operations & Production Management. https://doi.org/10.1108/01443570210417623
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.