The DOI matches its Crossref record; 13 of the 13 references it cites were found in a registry or an index.
Evaluation and improvement of manufacturing performance measurement systems ‐ the role of OEE
Abstract
Abstract The paper identifies six requirements: four critical dimensions (what to measure) and two characteristics (how to measure) of an overall manufacturing performance measurement system. The overall equipment effectiveness (OEE) measure in such a system is assessed against these ideal requirements. The current measurement systems, and the potential of OEE, of three manufacturing organisations are evaluated with the dimensions and characteristics as comparative data. A common weakness of the systems was that they did not measure flow orientation or external effectiveness to any great extent. Another weakness was a high degree of complexity and lack of continuous improvement. Field experiments in the studied organisations showed that use of OEE in combination with an open and decentralised organisation design could improve several of those weaknesses.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The balanced scorecard : measures that drive performance
Caplan, R. S. (1992) · Harvard business review · Cited by 12,085
(1992) · PubMed · Cited by 7,979
Deming, W. E. (1982) · Medical Entomology and Zoology · Cited by 7,297
Ishikawa, K. (1982) · Cited by 737
The changing basis of performance measurement
Ghalayini, A. M., & Noble, J. S. (1996) · International Journal of Operations & Production Management · doi:10.1108/01443579610125787 · Cited by 676
The New Performance Challenge: Measuring Operations for World-Class Competition
Dixon, J. R., Nanni, A. J., & Vollmann, T. E. (1990) · Cited by 591
Measure Up!: Yardsticks for Continuous Improvement
Lynch, R., & Cross, K. F. (1991) · Cited by 455
A survey and taxonomy of strategy‐related performance measures for manufacturing
White, G. P. (1996) · International Journal of Operations & Production Management · doi:10.1108/01443579610110486 · Cited by 265
A Review and Evaluation of Logistics Performance Measurement Systems
Caplice, C., & Sheffi, Y. (1995) · The International Journal of Logistics Management · doi:10.1108/09574099510805279 · Cited by 180
Maintenance performance analysis: a practical approach
Groote, P. D. (1995) · Journal of Quality in Maintenance Engineering · doi:10.1108/13552519510089556 · Cited by 143
Cited by
Barratt, M., Choi, T. Y., & Li, M. (2011) · Journal of Operations Management · doi:10.1016/j.jom.2010.06.002 · Cited by 1,288
Total productive maintenance: literature review and directions
Ahuja, I. P. S., & Khamba, J. S. (2008) · International Journal of Quality & Reliability Management · doi:10.1108/02656710810890890 · Cited by 574
Muchiri, P., & Pintelon, L. (2008) · International Journal of Production Research · doi:10.1080/00207540601142645 · Cited by 539
Implementation of total productive maintenance: A case study
Chan, F. T. S., Lau, H. C. W., Ip, R. W. L., Chan, H. K., & Kong, S. (2005) · International Journal of Production Economics · doi:10.1016/j.ijpe.2003.10.021 · Cited by 392
Development of maintenance function performance measurement framework and indicators
Muchiri, P., Pintelon, L., Gelders, L., & Martin, H. (2011) · International Journal of Production Economics · doi:10.1016/j.ijpe.2010.04.039 · Cited by 335
Metadata
- Authors
- Jonsson, P., & Lesshammar, M.
- Venue
- International Journal of Operations & Production Management
- Publisher
- Emerald
- Published
- 1999-01
- Volume
- 19
- Issue
- 1
- Pages
- 55-78
- ISSN
- 0144-3577 (ISSN-L)
- OpenAlex
- W2048292487
- Cited by
- 308
- References
- 13
- FWCI
- 2.96
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Evaluation and improvement of manufacturing performance measurement systems ‐ the role of OEE. https://app.cochat.ai/papers/10.1108/01443579910244223
- The paper
- Jonsson, P., & Lesshammar, M. (1999). Evaluation and improvement of manufacturing performance measurement systems ‐ the role of OEE. International Journal of Operations & Production Management. https://doi.org/10.1108/01443579910244223
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.