Collaborative relationships in construction: the UK contractors' perception

Akintoye, Akintola, Main, Jamie · 2007 · Engineering, Construction and Architectural Management
Cited by 248

The DOI matches its Crossref record; 13 of the 13 references it cites were found in a registry or an index.

Abstract

Purpose: The purpose of this paper is to describe UK contractors' perceptions of collaborative relationships in construction. Design/methodology/approach: Based on a UK wide postal questionnaire survey, the opinions of contractors were assessed on reasons for collaborative relationships and the factors that are responsible for the success and failure of collaborative relationships in construction development. The respondents were split into two groups (SME's and large) based on their number of employees, to determine whether their responses varied with size as part of the analysis. Statistical analyses, based on Analysis of Variance (ANOVA) and factor analysis technique were used to investigate the cluster of relationships. Findings: The research shows that UK contractors are positive about collaboration and are engaged in collaborative relationships for construction developments. Factor analysis shows that the principal reasons why contractors are involved in collaborative relationships are for risk sharing, access to innovation and technology, response to market, resource efficiency and client requirements. The principal success factors are commitment of adequate resources from the partners, equity of relationship, recognition of the importance of non‐financial benefits and clarity of objectives while the principal failure factors are lack of trust and consolation and lack of experience and business fit. Practical implications: Drawing from the findings, the study confirms that construction collaborative relationships are customer driven with very little consideration for competitors, suppliers and subcontractors although a a true collaborative relationship should take into account all the parties involved in construction development supply and demand chains to reap the full benefits. Originality/value: The paper makes an original contribution of exploring the area of relationships in construction in the UK from the contractors point‐of‐view. The contents within the paper will be of interest to those working within the field.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1108/09699980710829049

Cites

13 of 13 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

  • An Index of Factorial Simplicity

    Kaiser, H. F. (1974) · Psychometrika · doi:10.1007/bf02291575 · Cited by 14,898 · cited 3×

    “Various tests are required for the appropriateness of factor analysis for factor extraction; this include Kaiser-Meyer-Olkin (KMO) measure of sampling accuracy, anti-image correlation, measure of sampling activities (MSA) and Barlett Test of Sphericity. The reasons for collaborative relationship variables, success fac…”
    BackgroundMethodInfluential
  • Trust: making and breaking cooperative relations

    (1989) · Choice Reviews Online · doi:10.5860/choice.26-3664 · Cited by 4,014

  • SPSS for Windows

    Norussis, H. (1993) · Medical Entomology and Zoology · Cited by 2,704

  • A comparative study of causes of time overruns in Hong Kong construction projects

    Chan, D. W., & Kumaraswamy, M. M. (1997) · International Journal of Project Management · doi:10.1016/s0263-7863(96)00039-7 · Cited by 831 · cited 2×

    “, 1999) and time cost overruns in projects (Chan and Kumaraswamy, 1997).”
    Background
  • Strategic alliances: Choose your partners

    Brouthers, K. D., Brouthers, L. E., & Wilkinson, T. J. (1995) · Long Range Planning · doi:10.1016/0024-6301(95)00008-7 · Cited by 416 · cited 1×

    “Brouthers et al. (1995) identified 4Cs under which strategic alliances should be utilised; this they termed the major forces involved in helping assure success: complementary skills are offered by the partners, cooperative cultures exist between the firms; the firms have compatible goals; and…”
    Background
  • Building partnerships: case studies of clientcontractor collaboration in the UK construction industry

    Bresnen, M., & Marshall, N. (2000) · Construction Management and Economics · doi:10.1080/014461900433104 · Cited by 312 · cited 4×

    “The results corroborate a study by Bresnen and Marshall (2000) that found senior management support very vital in making a collaborative approach both credible and legitimate. In all cases, partnering or alliancing had been championed at the highest levels of the organisation and the general perception was that goal a…”
    ResultInfluential
  • Building Alliance Capability:

    Draulans, J., deMan, A.-P., & Volberda, H. W. (2003) · Long Range Planning · doi:10.1016/s0024-6301(02)00173-5 · Cited by 308 · cited 1×

    “It was noted by Draulans et al. (2003) that rather than a strategic fit between the partners and the characteristics of alliance, the capacity which an organisation has been built up in managing alliances (including alliance training, cross-alliance evaluation, use of alliance specialists) makes an…”
    Background
  • Creating strategic alliances which endure

    Spekman, R. E., Isabella, L. A., MacAvoy, T. C., & Forbes, T. (1996) · Long Range Planning · doi:10.1016/0024-6301(96)00021-0 · Cited by 201 · cited 3×

    “Spekman et al. (1996) concluded from their study, based on in-depth interviews with managers on both sides of five strategic alliances, that successful alliances have their origin at the top of the organisation.”
    BackgroundInfluential
  • Strategic Alliances

    Douma, M. U., Bilderbeek, J., Idenburg, P. J., & Looise, J. K. (2000) · Long Range Planning · doi:10.1016/s0024-6301(00)00062-5 · Cited by 201 · cited 2×

    “Douma et al. (2000) are of the view that the need to cooperate is determined by pressure on continuity, market opportunities, time pressure or the number of alternative options (such as autonomous development or acquisitions).”
    Background
  • Why too many alliances end in divorce

    Medcof, J. W. (1997) · Long Range Planning · doi:10.1016/s0024-6301(97)00050-2 · Cited by 178 · cited 1×

    “Medcof (1997) also identified different 4Cs for successful alliances: capability (are the prospective partners capable of carrying out their role in the alliance?)”
    Background

Show all 13 references

Cited by

Metadata

Authors
Akintoye, A., & Main, J.
Venue
Engineering, Construction and Architectural Management
Publisher
Emerald
Published
2007-11-13
Volume
14
Issue
6
Pages
597-617
ISSN
0969-9988 (ISSN-L)
OpenAlex
W2140458300
Cited by
248
References
13
FWCI
4.29
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.