Student or educator? Sign up with your school email and get 6 months of Pro free.
Cited by 230

The DOI matches its Crossref record.

Planning for Distributed Generation

Dugan, Roger C., McDermott, Thomas E., Ball, Greg J.·2001·IEEE Industry Applications Magazine

Abstract

Distributed generation (DG) can be incorporated into distribution planning as an option along with traditional feeder and substation options. In place of rigid capacity planning rules, the planning process needs to incorporate more detailed simulations of capacity constraints and customer damage costs because utilities now assume more risk. Planning tools need to simulate load variations, contingencies, dispatch and control action to more accurately determine the capacity limits and related costs. This is especially important when considering DG because the siting and dispatch have an important impact on the benefits to the utility. Equally important is the evaluation of economic risk given uncertainties such as load growth. Because of the added complexities associated with these analysis techniques, the planning process must incorporate appropriate screening tools to determine the depth of analysis needed for particular projects, thereby making more efficient use of already scarce planning resources.

Overview

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1109/2943.911193

Cites

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cited by

See all 230

Metadata

Authors
Dugan, R. C., McDermott, T. E., & Ball, G. J.
Venue
IEEE Industry Applications Magazine
Published
2001-03
Volume
7
Issue
2
Pages
80-88
ISSN
  • 1077-2618 (ISSN-L)
  • 1558-0598
OpenAlex
W2077925350
Cited by
230
References
0
FWCI
4.60
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Planning for Distributed Generation. https://app.cochat.ai/papers/10.1109/2943.911193
The paper
Dugan, R. C., McDermott, T. E., & Ball, G. J. (2001). Planning for Distributed Generation. IEEE Industry Applications Magazine. https://doi.org/10.1109/2943.911193

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.