Critical Component Identification in Reliability Centered Asset Management of Power Distribution Systems Via Fuzzy AHP
The DOI matches its Crossref record; 7 of the 7 references it cites were found in a registry or an index.
Abstract
Confronted with the power system restructuring trend reforming the past-regulated power systems, the need for a narrower insight on the costly maintenance strategies seems imperative. It falls within the realm of reliability centered maintenance to enhance the cost effectiveness of power distribution maintenance policies. From a practical point of view, this paper devises a novel approach on the basis of the analytical hierarchical process (AHP) accompanied by fuzzy sets theory to determine the most critical component types of distribution power systems to be prioritized in maintenance scheduling. In the presence of many qualitative and quantitative attributes, fuzzy sets can effectively help to deal with the existent uncertainty and judgment vagueness. As demonstrated in a practical case study, the proposed fuzzy AHP method introduces its applicability and efficiency in the asset management procedure.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The Analytic Hierarchy Process
SAATY, T. L., & KEARNS, K. P. (1985) · Analytical Planning · doi:10.1016/b978-0-08-032599-6.50008-8 · Cited by 15,357
The Analytic Hierarchy Process: Structuring, Measurement, and Synthesis
Wang, J., Chakraborty, C., & Ouyang, H. (2011) · Encyclopedia of Decision Making and Decision Support Technologies · doi:10.4018/9781599048437.ch003 · Cited by 1,328
Reliability-Centered Maintenance
Ziegel, E. R., & Moubray, J. (1996) · Technometrics · doi:10.2307/1268924 · Cited by 1,067
Multi-criteria decision analysis with fuzzy pairwise comparisons
Boender, C. G. E., de Graan, J. G., & Lootsma, F. A. (1989) · Fuzzy Sets and Systems · doi:10.1016/0165-0114(89)90187-5 · Cited by 573 · cited 2×
“So, FAHP, which is going to be introduced in the next section, finds its relevance to the at hand dilemma.”
BackgroundMethodTjernberg, L. B., Allan, R. N., & Eriksson, R. (2005) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2004.840433 · Cited by 332 · cited 2×
“RCM develops a costeffective scheme [16] whose aim is to strategically manage the maintenance procedures more in the reliability point of view.”
BackgroundReliability centered maintenance for transmission systems
Beehler, M. E. (1997) · IEEE Transactions on Power Delivery · doi:10.1109/61.584432 · Cited by 65
Time management for assets: chronological strategies for power system asset management
Shahidehpour, M., & Ferrero, R. W. (2005) · IEEE Power and Energy Magazine · doi:10.1109/mpae.2005.1436498 · Cited by 60 · cited 3×
“Asset management, in general, means exploiting a group of assets over the whole technical life-cycle ensuring an appropriate amount of return and guarantying a predefined service and security standards [17].”
Background
Cited by
A state-of the-art survey & testbed of fuzzy AHP (FAHP) applications
Kubler, S., Robert, J., Derigent, W., Voisin, A., & Le Traon, Y. (2016) · Expert Systems with Applications · doi:10.1016/j.eswa.2016.08.064 · Cited by 441
Energy Internet: The business perspective
Zhou, K., Yang, S., & Shao, Z. (2016) · Applied Energy · doi:10.1016/j.apenergy.2016.06.052 · Cited by 343
Kandukuri, S. T., Klausen, A., Karimi, H. R., & Robbersmyr, K. G. (2016) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2015.08.061 · Cited by 203
Ramkumar, M., & Jenamani, M. (2015) · IEEE Systems Journal · doi:10.1109/jsyst.2014.2336291 · Cited by 51
Metadata
- Authors
- Dehghanian, P., Fotuhi-Firuzabad, M., Bagheri-Shouraki, S., & Razi Kazemi, A. A.
- Venue
- IEEE Systems Journal
- Published
- 2012-12
- Volume
- 6
- Issue
- 4
- Pages
- 593-602
- ISSN
- 1932-8184 (ISSN-L)
- 1937-9234
- 2373-7816
- OpenAlex
- W2068774636
- Cited by
- 165
- References
- 7
- FWCI
- 26.00
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.