Cited by 72Machine Fault Diagnosis TechniquesReliability and Maintenance OptimizationFault Detection and Control Systems

The DOI matches its Crossref record; 24 of the 24 references it cites were found in a registry or an index.

Time Series Prediction Algorithm for Intelligent Predictive Maintenance

Lin, Chin-Yi, Hsieh, Yu-Ming, Cheng, Fan-Tien, Huang, Hsien-Cheng, Adnan, Muhammad·2019·IEEE Robotics and Automation Letters

Abstract

Predictive maintenance aims to find out when the target device (TD) is in the sick state and almost entering the dead state before its actual occurrence to conduct just-in-time maintenance, so as to avoid unexpected TD down time. In this way, not only tool availability and manufacturing quality are improved, but the additional cost of excessive maintenance in preventive maintenance strategy can also be reduced. Among the predictive maintenance technologies proposed by many scholars, exponential model was commonly applied to predict the remaining useful life (RUL) of TD. However, due to the algorithm limitations, when TD is about to die, whether the TD's aging feature suddenly rises or becomes smooth, the exponential model may not be able to keep up with the real-time prediction or even falsely predicts long RUL. To solve the problem of inaccurate RUL prediction, the authors propose the time series prediction (TSP) algorithm. TSP applies the time series analysis model built by information criterion to adapt to the complicated future trend of solving TD fault prediction. Also, the Pre-Alarm Module (PreAM) to make alert of immediate maintenance when a TD is likely to shut down shortly as well as the Death Correlation Index (DCI) to reveal the possibility of entering the dead state are proposed in this work. How to select the most effective predictors and adjust the predictor weights to construct high-performance prediction model are also illustrated in this letter with the tools in various industries (such as solar-cell manufacturing and machine tool industry) being the examples of the TSP algorithm.

Overview

Integrity signals

Registry

Crossref · 10.1109/lra.2019.2918684

Cites

24 of 24 references verified0 citation errors · 0 not checkable

Statistics

Recomputing p-values needs the paper’s full text.

Verification

Claims the paper makes

This paper’s full text isn’t openly available, so its claims and self-check weren’t run. The registry and citation checks still apply.

Claims other papers make about this one

Each is checked against this paper’s own text: does it say what the citing paper says it does?

Citations

Cites

Show all 24 references

Cited by

Sorted by citations

See all 72

Metadata

Authors
Lin, C.-Y., Hsieh, Y.-M., Cheng, F.-T., Huang, H.-C., & Adnan, M.
Affiliations
National Cheng Kung University (TW)
Venue
IEEE Robotics and Automation Letters
Published
2019-07
Volume
4
Issue
3
Pages
2807-2814
ISSN
  • 2377-3766 (ISSN-L)
  • 2377-3774
OpenAlex
W2944921687
Cited by
72
References
24
Citations by year
2026: 10 · 2025: 12 · 2024: 6 · 2023: 12 · 2022: 13 · 2021: 13 · 2020: 5 · 2019: 1
FWCI
4.43
Type
journal article
Language
en
Open access
closed
Locations
IEEE Robotics and Automation Letters (publishedVersion)
Funders
  • Intelligent Manufacturing Research Center
  • Ministry of Education (MOE) in Taiwan
  • Ministry of Science and Technology of Taiwan, R.O.C. (107-2218-E-006-055, 107-2622-8-006-015, 107-2622-E-006-002-CC2, 105-2221-E-006-255-MY3)
Topics
  • Physical Sciences › Engineering › Control and Systems Engineering › Machine Fault Diagnosis Techniques
  • Physical Sciences › Engineering › Safety, Risk, Reliability and Quality › Reliability and Maintenance Optimization
  • Physical Sciences › Engineering › Control and Systems Engineering › Fault Detection and Control Systems
Keywords
predictive maintenance, time series forecasting, remaining useful life prediction, fault prediction, information criteria, predictor selection, solar cell fabrication, machine tools, machine downtime

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Time Series Prediction Algorithm for Intelligent Predictive Maintenance. https://app.cochat.ai/papers/10.1109/lra.2019.2918684
The paper
Lin, C.-Y., Hsieh, Y.-M., Cheng, F.-T., Huang, H.-C., & Adnan, M. (2019). Time Series Prediction Algorithm for Intelligent Predictive Maintenance. IEEE Robotics and Automation Letters. https://doi.org/10.1109/lra.2019.2918684