CoChat
Cited by 440

The DOI matches its Crossref record.

Insulation coordination for power systems

Hileman, A.R. · 1999 · IEEE Power Engineering Review

Abstract

Specifying the insulation strength insulation strength characteristics phase-ground switching overvoltages, transmission lines phase-phase switching overvoltages, transmission lines switching overvoltages, substations the lightning flash shielding of transmission lines shielding of substations review of travelling waves the backflash station insulation co-ordination, the incoming surge the surge arrester station insulation co-ordination, BIL's and clearances line arresters inducedovervoltages contamination national electric safety code overview of line insulation co-ordination.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1109/mper.1999.785802

Cites

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cited by

Metadata

Authors
Hileman, A. R.
Venue
IEEE Power Engineering Review
Published
1999-09
Volume
19
Issue
9
Pages
43-43
ISSN
  • 0272-1724 (ISSN-L)
  • 1558-1705
OpenAlex
W2028646417
Cited by
440
References
0
FWCI
0.89
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.