Cited by 27Smart Grid Energy ManagementOptimal Power Flow DistributionElectric Power System Optimization

The effect of demand response on distribution system operation

Narimani, Mohammad Rasoul, Joo, Jhi-Young, Crow, Mariesa Louis·2015·2015 IEEE Power and Energy Conference at Illinois (PECI)

Abstract

Demand response is an important resource that can significantly increase the efficiency of the future power systems. It is a key component of smart grids that can bring a lot of benefits to power system operators and customers. This work assesses potential impacts of demand response on some major attributes of the distribution system such as the network losses, voltage profiles, and maximum power flow through the lines. We considered detailed and practical models of individual residential loads for flexible loads in the system. The flexible load models are various household appliances with different acceptable delay times (ADTs) within which their consumption can be shifted from the normal schedules. With these models, demand response was applied to the 33-bus IEEE test system. In this system, each bus served a specific number of aggregated individual residential loads. The obtained results have shown the great effects of demand response on distribution system attributes.

Integrity signals

Registry

Crossref · 10.1109/peci.2015.7064916

Cites

1 of 1 references verified0 citation errors · 0 not checkable

Statistics

Recomputing p-values needs the paper’s full text.

Claims the paper makes

This paper’s full text isn’t openly available, so its claims and self-check weren’t run. The registry and citation checks still apply.

Claims other papers make about this one

Each is checked against this paper’s own text: does it say what the citing paper says it does?

  • In the California crisis in June 2000, a shortage of 300 MW (around 0.6% of the total system capacity) caused rolling blackouts.

    “A striking example is the crisis in California in June 2000 in which a shortage of 300 MW (around 0.6% of the total system capacity) caused rolling blackouts [101].”
  • Electrical equipment is designed for optimum operation at the nominal voltage. Any deviation from this can result in decreased efficiency, damage or severely reduced life of the infrastructure.

    “Electrical equipment is designed for optimum operation at the nominal voltage. Any deviation from this can result in decreased e ffi ciency, damage or severely reduced life of the infrastructure [101].”
  • In the long-run, benefits can also emerge for the consumers that do not participate in DR programs, since the lower wholesale market prices due to sustained DR programs are likely to cause a decrease in the flat retail rates as well.

    “As a result, in the long-run, bene fi ts can also emerge for the consumers that do not participate in DR programs, since the lower wholesale market prices due to sustained DR programs are likely to cause a decrease in the fl at retail rates as well [101].”

Cites

Flagged first, then by citations

Cited by

Sorted by citations

Authors
Narimani, M. R., Joo, J.-Y., & Crow, M. L.
Affiliations
Missouri University of Science and Technology (US)
Venue
2015 IEEE Power and Energy Conference at Illinois (PECI)
Publisher
IEEE
Published
2015-02
Pages
1-6
OpenAlex
W2085357631
Cited by
27
References
1
Citations by year
2026: 2 · 2024: 1 · 2023: 2 · 2022: 2 · 2021: 3 · 2020: 3 · 2019: 5 · 2018: 2 · 2017: 2 · 2016: 4 · 2015: 1
FWCI
3.72
Type
conference paper
Language
en
Open access
closed
Locations
IEEE Power and Energy Conference at Illinois (PECI) (publishedVersion)
Topics
  • Physical Sciences › Engineering › Electrical and Electronic Engineering › Smart Grid Energy Management
  • Physical Sciences › Engineering › Electrical and Electronic Engineering › Optimal Power Flow Distribution
  • Physical Sciences › Engineering › Electrical and Electronic Engineering › Electric Power System Optimization
Keywords
demand response, distribution network operation, network losses, voltage profile, flexible loads, smart grid, IEEE 33-bus system

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review