A Two-Phase Meta-Heuristic for Multiobjective Flexible Job Shop Scheduling Problem With Total Energy Consumption Threshold
The DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.
Abstract
Flexible job shop scheduling problem (FJSP) has been extensively considered; however, multiobjective FJSP with energy consumption threshold is seldom investigated, the goal of which is to minimize makespan and total tardiness under the constraint that total energy consumption does not exceed a given threshold. Energy constraint is not always met and the threshold is difficult to be decided in advance. These features make it more difficult to solve the problem. In this paper, a two-phase meta-heuristic (TPM) based on imperialist competitive algorithm (ICA) and variable neighborhood search (VNS) is proposed. In the first phase, the problem is converted into FJSP with makespan, total tardiness and total energy consumption and the new FJSP is solved by an ICA, which uses some new methods to build initial empires and do imperialist competition. In the second phase, new strategies are provided for comparing solutions and updating the nondominated set of the first phase and a VNS is used for the original problem. The current solution of VNS is periodically replaced with member of the set Ω to improve solution quality. An energy consumption threshold is obtained by optimization. Extensive experiments are conducted to test the performance of TPM finally. The computational results show that TPM is a very competitive algorithm for the considered FJSP.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
A fast and elitist multiobjective genetic algorithm: NSGA-II
Deb, K., Pratap, A., Agarwal, S., & Meyarivan, T. (2002) · IEEE Transactions on Evolutionary Computation · doi:10.1109/4235.996017 · Cited by 50,053
Cited by
A review of energy-efficient scheduling in intelligent production systems
Gao, K., Huang, Y., Sadollah, A., & Wang, L. (2020) · Complex & Intelligent Systems · doi:10.1007/s40747-019-00122-6 · Cited by 274
Self-citationPan, Q.-K., Gao, L., & Wang, L. (2022) · IEEE Transactions on Cybernetics · doi:10.1109/tcyb.2020.3041494 · Cited by 219
“shop with dynamic operation skipping [34], flexible job shop scheduling [35], batch-processing machine scheduling [36], dynamic production scheduling [37], [38], and to consider”
BackgroundSelf-citationDu, Y., Li, J.-Q., Chen, X.-L., Duan, P.-Y., & Pan, Q.-K. (2023) · IEEE Transactions on Emerging Topics in Computational Intelligence · doi:10.1109/tetci.2022.3145706 · Cited by 202
“[55], and BEG-NSGA-II proposed by Deng et al.”
Background
Metadata
- Authors
- Lei, D., Li, M., & Wang, L.
- Venue
- IEEE Transactions on Cybernetics
- Published
- 2019-03
- Volume
- 49
- Issue
- 3
- Pages
- 1097-1109
- ISSN
- 2168-2267 (ISSN-L)
- 2168-2275
- OpenAlex
- W2785512376
- Cited by
- 196
- References
- 1
- FWCI
- 18.28
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: A Two-Phase Meta-Heuristic for Multiobjective Flexible Job Shop Scheduling Problem With Total Energy Consumption Threshold. https://app.cochat.ai/papers/10.1109/tcyb.2018.2796119
- The paper
- Lei, D., Li, M., & Wang, L. (2019). A Two-Phase Meta-Heuristic for Multiobjective Flexible Job Shop Scheduling Problem With Total Energy Consumption Threshold. IEEE Transactions on Cybernetics. https://doi.org/10.1109/tcyb.2018.2796119
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.