The DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.
Demand response in the New Zealand Electricity market
Abstract
This paper examines a proposal for the introduction of incentive based demand curtailment in the New Zealand Electricity market (NZEM). Today NZEM participants do not submit demand bids (except in pre-dispatch schedule) to the markets for energy and regulation reserve. Professional literature identifies demand response (DR) in a broad variety of uses. Such uses range across peak load management, transmission congestion management, regulating reserve, market efficiency, transmission and distribution investment deferral, among other things. Despite the apparent benefits of these various options demand side participation has been very limited in today's markets throughout the world. Many US and Canadian markets have embraced demand response, but many markets are still reluctant to implement demand management products in real time markets. The New Zealand power system has a limited Advance Metering Infrastructure (AMI) and a low penetration of smart appliances. In the installed AMI much of the communication capability is limited to remote meter reading. Consequent perhaps on the limited TOU capability of the AMI, tariffs are fixed rather than TOU based. Some adhoc incentives have been given to persuade consumers to participate in conservation initiatives during periods of energy shortage. At the time of writing New Zealand does not use price based demand response methods. Our discussion is centered on a generic incentive based demand response. This paper reviews the status of the…
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“DR can contribute to a reduced forecasted peak demand, since long-term DR programs will be implicitly taken into account in the peak demand forecasts [98].”
From An overview of Demand Response: Key-elements and international experience (2017) · cites this paper as [98]
In the citing paper
“In such cases, a small reduction in the demand may induce a signi fi cant reduction in the market price [98].”
From An overview of Demand Response: Key-elements and international experience (2017) · cites this paper as [98]
Citations
Cites
A summary of demand response in electricity markets
Albadi, M. H., & El-Saadany, E. F. (2008) · Electric Power Systems Research · doi:10.1016/j.epsr.2008.04.002 · Cited by 1,884
Research works printed but not linked: 2
- 2007, GAMS Userss' Guide
- hindsberger, 2008, Deferral of Network Investments by DSM-New Zealand Experience
Cited by
Sorted by citations
An overview of Demand Response: Key-elements and international experience
Paterakis, N. G., Erdinç, O., & Catalão, J. P. S. (2017) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2016.11.167 · Cited by 640
Metadata
- Authors
- Chakrabarti, B., Bullen, D., Edwards, C., & Callaghan, C.
- Affiliations
- Transpower (New Zealand) (NZ)
- Venue
- PES T&D 2012
- Publisher
- IEEE
- Published
- 2012-05
- Pages
- 1-7
- OpenAlex
- W2030568301
- Cited by
- 35
- References
- 1
- Citations by year
- 2025: 1 · 2023: 1 · 2022: 1 · 2021: 2 · 2020: 3 · 2019: 3 · 2018: 2 · 2017: 4 · 2016: 5 · 2015: 7 · 2014: 6
- FWCI
- 5.31
- Type
- conference paper
- Language
- en
- Open access
- closed
- Topics
- Physical Sciences › Engineering › Electrical and Electronic Engineering › Smart Grid Energy Management
- Physical Sciences › Engineering › Electrical and Electronic Engineering › Electric Power System Optimization
- Physical Sciences › Engineering › Electrical and Electronic Engineering › Integrated Energy Systems Optimization
- Keywords
- demand response, demand curtailment, incentive-based demand response, New Zealand electricity market, locational marginal pricing, contingency reserves, time-of-use pricing, demand-side participation, peak load management, transmission congestion management, energy market design
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review