The DOI matches its Crossref record.
Optimal Battery Sizing in Microgrids Using Probabilistic Unit Commitment
Abstract
The Stochastic nature of wind power can cause insufficiency of supply in electrical systems. Applying an energy storage system can alleviate the impact of wind power forecast error on power systems performance and increase system tolerance against deficiency of supply. This paper attempts to investigate a new unit commitment (UC) problem based on the cost-benefit analysis and here-and-now (HN) approach for optimal sizing of battery banks (BBs) imicrogrids (MGs) with wind power systems. To solve this problem, particle swarm optimization is used to minimize the total cost and maximize the total benefit. In this paper, 12 scenarios have been considered in the presence of BBs and without them in 2 operating modes: 1) stand-alone mode and 2) grid-connected mode. Using the HN approach, the uncertainty of wind power is applied as a constraint in these operating modes. The mathematical formulations related to the HN approach in MGs and its combination in a UC problem are presented in detail for optimal sizing of BBs. Simulation results show that the best sizes of BBs and the scheduling of distributed generations would be entirely different when the accessibility of wind power is taken into consideration by applying HN approach to the proposed probabilistic UC problem.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
A review of multi criteria decision making (MCDM) towards sustainable renewable energy development
Kumar, A., Sah, B., Singh, A. R., Deng, Y., He, X., Kumar, P., & Bansal, R. C. (2017) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2016.11.191 · Cited by 1,622
Battery energy storage system size determination in renewable energy systems: A review
Yang, Y., Bremner, S., Menictas, C., & Kay, M. (2018) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2018.03.047 · Cited by 977
DC Microgrid Planning, Operation, and Control: A Comprehensive Review
Al-Ismail, F. S. (2021) · IEEE Access · doi:10.1109/access.2021.3062840 · Cited by 542
Gaussian Process Regression for In Situ Capacity Estimation of Lithium-Ion Batteries
Richardson, R. R., Birkl, C. R., Osborne, M. A., & Howey, D. A. (2019) · IEEE Transactions on Industrial Informatics · doi:10.1109/tii.2018.2794997 · Cited by 407
“Battery capacity estimates are also an essential input for optimal battery sizing algorithms, for applications such as microgrids [3] and hybrid energy storage systems [4].”
Background
Metadata
- Authors
- Khorramdel, H., Aghaei, J., Khorramdel, B., & Siano, P.
- Venue
- IEEE Transactions on Industrial Informatics
- Published
- 2016-04
- Volume
- 12
- Issue
- 2
- Pages
- 834-843
- ISSN
- 1551-3203 (ISSN-L)
- 1941-0050
- OpenAlex
- W2333984711
- Cited by
- 158
- References
- 0
- FWCI
- 7.38
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Optimal Battery Sizing in Microgrids Using Probabilistic Unit Commitment. https://app.cochat.ai/papers/10.1109/tii.2015.2509424
- The paper
- Khorramdel, H., Aghaei, J., Khorramdel, B., & Siano, P. (2016). Optimal Battery Sizing in Microgrids Using Probabilistic Unit Commitment. IEEE Transactions on Industrial Informatics. https://doi.org/10.1109/tii.2015.2509424
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.