The DOI matches its Crossref record; 16 of the 16 references it cites were found in a registry or an index.
Short-term load forecasting via ARMA model identification including non-gaussian process considerations
Abstract
In this paper, the short-term load forecast by use of autoregressive moving average (ARMA) model including non-Gaussian process considerations is proposed. In the proposed method, the concept of cumulant and bispectrum are embedded into the ARMA model in order to facilitate Gaussian and non-Gaussian process. With embodiment of a Gaussianity verification procedure, the forecasted model is identified more appropriately. Therefore, the performance of ARMA model is better ensured, improving the load forecast accuracy significantly. The proposed method has been applied on a practical system and the results are compared with other published techniques.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Mendel, J. M. (1991) · Proceedings of the IEEE · doi:10.1109/5.75086 · Cited by 1,810
Electric load forecasting using an artificial neural network
Park, D.-C., El-Sharkawi, M. A., Marks, R. J., Atlas, L., & Damborg, M. J. (1991) · IEEE Transactions on Power Systems · doi:10.1109/59.76685 · Cited by 1,440
Signal processing with higher-order spectra
Nikias, C. L., & Mendel, J. M. (1993) · IEEE Signal Processing Magazine · doi:10.1109/79.221324 · Cited by 952
Gross, G., & Galiana, F. D. (1987) · Proceedings of the IEEE · doi:10.1109/proc.1987.13927 · Cited by 878
TESTING FOR GAUSSIANITY AND LINEARITY OF A STATIONARY TIME SERIES
Hinich, M. J. (1982) · Journal of Time Series Analysis · doi:10.1111/j.1467-9892.1982.tb00339.x · Cited by 784
Cryer, J. D., & Chan, K.-S. (2008) · Springer Texts in Statistics · doi:10.1007/978-0-387-75959-3 · Cited by 678
Short-term hourly load forecasting using time-series modeling with peak load estimation capability
Amjady, N. (2001) · IEEE Transactions on Power Systems · doi:10.1109/59.962429 · Cited by 515
Identification of nonminimum phase systems using higher order statistics
Giannakis, G. B., & Mendel, J. M. (1989) · IEEE Transactions on Acoustics, Speech, and Signal Processing · doi:10.1109/29.21704 · Cited by 485
Applied Time Series and Box-Jenkins Models
Vandaele, W. (1983) · Medical Entomology and Zoology · Cited by 381
Regression based peak load forecasting using a transformation technique
Haida, T., & Muto, S. (1994) · IEEE Transactions on Power Systems · doi:10.1109/59.331433 · Cited by 350
Cited by
Electric load forecasting methods: Tools for decision making
Hahn, H., Meyer-Nieberg, S., & Pickl, S. (2009) · European Journal of Operational Research · doi:10.1016/j.ejor.2009.01.062 · Cited by 549
Short-term load forecasting using lifting scheme and ARIMA models
Lee, C.-M., & Ko, C.-N. (2011) · Expert Systems with Applications · doi:10.1016/j.eswa.2010.11.033 · Cited by 438
Sadaei, H. J., de Lima e Silva, P. C., Guimarães, F. G., & Lee, M. H. (2019) · Energy · doi:10.1016/j.energy.2019.03.081 · Cited by 325
Stacking Ensemble Learning for Short-Term Electricity Consumption Forecasting
Divina, F., Gilson, A., Goméz-Vela, F., García Torres, M., & Torres, J. (2018) · Energies · doi:10.3390/en11040949 · Cited by 299
Deep learning for time series forecasting: The electric load case
Gasparin, A., Lukovic, S., & Alippi, C. (2022) · CAAI Transactions on Intelligence Technology · doi:10.1049/cit2.12060 · Cited by 293
Metadata
- Authors
- Huang, S.-J., & Shih, K.-R.
- Venue
- IEEE Transactions on Power Systems
- Published
- 2003-05
- Volume
- 18
- Issue
- 2
- Pages
- 673-679
- ISSN
- 0885-8950 (ISSN-L)
- OpenAlex
- W2133720763
- Cited by
- 675
- References
- 16
- FWCI
- 13.41
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Short-term load forecasting via ARMA model identification including non-gaussian process considerations. https://app.cochat.ai/papers/10.1109/tpwrs.2003.811010
- The paper
- Huang, S.-J., & Shih, K.-R. (2003). Short-term load forecasting via ARMA model identification including non-gaussian process considerations. IEEE Transactions on Power Systems. https://doi.org/10.1109/tpwrs.2003.811010
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.