Multistage Generation and Network Expansion Planning in Distribution Systems Considering Uncertainty and Reliability
The DOI matches its Crossref record; 3 of the 3 references it cites were found in a registry or an index.
Abstract
This paper describes the incorporation of uncertainty and reliability in the dynamic expansion planning of distribution network assets and distributed generation. Several alternatives for the installation of feeders, transformers, and distributed generation are considered. Thus, the optimal expansion plan identifies the best alternative, location, and installation time for the candidate assets under the uncertainty related to demand and renewable energy sources. To that end, an iterative algorithm is devised to yield a pool of high-quality candidate solutions in terms of total investment and operational costs. Each candidate solution results from a stochastic-programming-based model driven by the minimization of the expected investment and operational costs. The associated scenario-based deterministic equivalent is formulated as a mixed-integer linear program for which finite convergence to optimality is guaranteed and efficient off-the-shelf software is available. Standard metrics are subsequently applied to each candidate solution to characterize its reliability so that valuable information is provided to the distribution system planner. Numerical results illustrate the effective performance of the proposed approach.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Introduction to Stochastic Programming
Birge, J. R., & Louveaux, F. (2011) · Springer Series in Operations Research and Financial Engineering · doi:10.1007/978-1-4614-0237-4 · Cited by 6,469
Power Distribution Planning Reference Book
Willis, H. L. (2004) · doi:10.1201/9781420030310 · Cited by 467
Keane, A., Ochoa, L. F., Borges, C. L. T., Ault, G. W., Alarcon-Rodriguez, A. D., Currie, R. A. F., Pilo, F., Dent, C., & Harrison, G. P. (2013) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2012.2214406 · Cited by 429
Cited by
Asensio, M., Meneses de Quevedo, P., Munoz-Delgado, G., & Contreras, J. (2018) · IEEE Transactions on Smart Grid · doi:10.1109/tsg.2016.2560339 · Cited by 232
“However, when DR is integrated in the expansion planning model, the minimization of costs partially disregard the benefits consumers receive from the modification of their electricity consumption [24].”
BackgroundSelf-citationZubo, R. H. A., Mokryani, G., Rajamani, H.-S., Aghaei, J., Niknam, T., & Pillai, P. (2017) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2016.10.036 · Cited by 218
Metadata
- Authors
- Munoz-Delgado, G., Contreras, J., & Arroyo, J. M.
- Venue
- IEEE Transactions on Power Systems
- Published
- 2016-09
- Volume
- 31
- Issue
- 5
- Pages
- 3715-3728
- ISSN
- 0885-8950 (ISSN-L)
- 1558-0679
- OpenAlex
- W2342877771
- Cited by
- 199
- References
- 3
- FWCI
- 7.54
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Multistage Generation and Network Expansion Planning in Distribution Systems Considering Uncertainty and Reliability. https://app.cochat.ai/papers/10.1109/tpwrs.2015.2503604
- The paper
- Munoz-Delgado, G., Contreras, J., & Arroyo, J. M. (2016). Multistage Generation and Network Expansion Planning in Distribution Systems Considering Uncertainty and Reliability. IEEE Transactions on Power Systems. https://doi.org/10.1109/tpwrs.2015.2503604
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.