The DOI matches its Crossref record; 36 of the 36 references it cites were found in a registry or an index.
Agent-based distributed manufacturing process planning and scheduling: a state-of-the-art survey
Abstract
Manufacturing process planning is the process of selecting and sequencing manufacturing processes such that they achieve one or more goals and satisfy a set of domain constraints. Manufacturing scheduling is the process of selecting a process plan and assigning manufacturing resources for specific time periods to the set of manufacturing processes in the plan. It is, in fact, an optimization process by which limited manufacturing resources are allocated over time among parallel and sequential activities. Manufacturing process planning and scheduling are usually considered to be two separate and distinct phases. Traditional optimization approaches to these problems do not consider the constraints of both domains simultaneously and result in suboptimal solutions. Without considering real-time machine workloads and shop floor dynamics, process plans may become suboptimal or even invalid at the time of execution. Therefore, there is a need for the integration of manufacturing process-planning and scheduling systems for generating more realistic and effective plans. After describing the complexity of the manufacturing process-planning and scheduling problems, this paper reviews the research literature on manufacturing process planning, scheduling as well as their integration, particularly on agent-based approaches to these difficult problems. Major issues in these research areas are discussed, and research opportunities and challenges are identified.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Genetic algorithms in search, optimization, and machine learning
(1989) · Choice Reviews Online · doi:10.5860/choice.27-0936 · Cited by 49,010
Optimization by Simulated Annealing
Kirkpatrick, S., Gelatt, C. D., & Vecchi, M. P. (1983) · Science · doi:10.1126/science.220.4598.671 · Cited by 45,134
Genetic Algorithms in Search, Optimization and Machine Learning
Goldberg, D. E., & Robson, D. (1988) · Cited by 18,391
Goldberg, D. E., & Shakespeare, W. (2002) · Cited by 16,088
Lecture Notes in Artificial Intelligence
Brézillon, P., & Bouquet, P. (1999) · Cited by 7,473
Glover, F., & Laguna, M. (1997) · Cited by 5,679
The Contract Net Protocol: High-Level Communication and Control in a Distributed Problem Solver
Smith (1980) · IEEE Transactions on Computers · doi:10.1109/tc.1980.1675516 · Cited by 3,716
Glover, F., & Laguna, M. (1997) · doi:10.1007/978-1-4615-6089-0 · Cited by 3,001
Reference architecture for holonic manufacturing systems: PROSA
Van Brussel, H., Wyns, J., Valckenaers, P., Bongaerts, L., & Peeters, P. (1998) · Computers in Industry · doi:10.1016/s0166-3615(98)00102-x · Cited by 1,417
Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop
Rand, G. K., & French, S. D. (1982) · Journal of the Operational Research Society · doi:10.1057/jors.1982.184 · Cited by 1,047
Agent-Based Systems for Intelligent Manufacturing: A State-of-the-Art Survey
Shen, W., & Norrie, D. H. (1999) · Knowledge and Information Systems · doi:10.1007/bf03325096 · Cited by 808
Self-citationZweben, M., & Fox, M. S. (1998) · Cited by 620
Computer Aided Process Planning: the state-of-the-art survey
ALTING, L., & ZHANG, H. (1989) · International Journal of Production Research · doi:10.1080/00207548908942569 · Cited by 401
Issues in automated negotiation and electronic commerce: extending the contract net framework
Sandholm, T., & Lesser, V. (1997) · Cited by 326
Multiobjective Scheduling by Genetic Algorithms
Bagchi, T. P. (1999) · Springer eBooks · doi:10.1007/978-1-4615-5237-6 · Cited by 266
Evolution and Future Perspectives of CAPP
ElMaraghy, H. A. (1993) · CIRP Annals · doi:10.1016/s0007-8506(07)62537-2 · Cited by 260
Developments in holonic production planning and control
Mcfarlane, D. C., & Bussmann, S. (2000) · Production Planning & Control · doi:10.1080/095372800414089 · Cited by 217
MetaMorph: An adaptive agent-based architecture for intelligent manufacturing
Maturana, F., Shen, W., & Norrie, D. H. (1999) · International Journal of Production Research · doi:10.1080/002075499190699 · Cited by 214
Self-citationIntegration of process planning and scheduling— a review
Tan, W., & Khoshnevis, B. (2000) · Journal of Intelligent Manufacturing · doi:10.1023/a:1008952024606 · Cited by 190
Selection of cutting tools and conditions of machining operations using an expert system
Arezoo, B., Ridgway, K., & Al-Ahmari, A. M. (2000) · Computers in Industry · doi:10.1016/s0166-3615(99)00051-2 · Cited by 142
Dynamic scheduling in cellular manufacturing systems: A framework for networked decision making
Shaw, M. J. (1988) · Journal of Manufacturing Systems · doi:10.1016/0278-6125(88)90016-7 · Cited by 110
A multi-agent architecture for dynamic scheduling of steel hot rolling
Cowling, P., Ouelhadj, D., & Petrović, S. (2003) · Journal of Intelligent Manufacturing · doi:10.1023/a:1025701325275 · Cited by 100
Sikora, R. T., & Shaw, M. J. (1997) · IEEE Transactions on Engineering Management · doi:10.1109/17.584925 · Cited by 79
Computer-aided process planning in virtual one-of-a-kind production
Tu, Y., Chu, X., & Yang, W. (2000) · Computers in Industry · doi:10.1016/s0166-3615(99)00006-8 · Cited by 70
Application of multiagent systems in project management
Yan, Y., Kuphal, T., & Bode, J. (2000) · International Journal of Production Economics · doi:10.1016/s0925-5273(00)00082-7 · Cited by 63
Feature-based modelling and neural networks-based CAPP for integrated manufacturing
Devireddy, C. R. (1999) · International Journal of Computer Integrated Manufacturing · doi:10.1080/095119299130470 · Cited by 57
A cooperative agent modelling approach for process planning
Zhao, F. L., Tso, S. K., & Wu, P. S. Y. (2000) · Computers in Industry · doi:10.1016/s0166-3615(99)00012-3 · Cited by 46
Multi-agent system for dynamic scheduling and control in manufacturing cells
Ouelhadj, D., Hanach, C., & Bouzouia, B. (2002) · Proceedings - IEEE International Conference on Robotics and Automation/Proceedings · doi:10.1109/robot.1998.680635 · Cited by 45
A computer-based intelligent system for automatic tool selection
Edalew, K. O., Abdalla, H. S., & Nash, R. J. (2001) · Materials & Design (1980-2015) · doi:10.1016/s0261-3069(00)00106-0 · Cited by 43
Solving the n -job 3-stage flexible flowshop scheduling problem using an agent-based approach
Babayan, A., & He, D. (2003) · International Journal of Production Research · doi:10.1080/00207540310001602946 · Cited by 41
Chan, F. T. S., Zhang, J., & Li, P. (2001) · Proceedings of the Institution of Mechanical Engineers Part B Journal of Engineering Manufacture · doi:10.1243/0954405011519060 · Cited by 35
A Schema-Based Approach to Specifying Conversation Policies
Lin, F. O., Norrie, D. H., Shen, W., et al. (2000) · Lecture notes in computer science · doi:10.1007/10722777_13 · Cited by 30
Self-citationDistributed Problem Solving through Coordination in a Society of Agents
Liu, J.-S., & Sycara, K. P. (1994) · Cited by 30
Evaluation of agent-based manufacturing systems based on a parallel simulator
Huang, C., & Nof, S. Y. (2002) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(02)00124-9 · Cited by 23
An adaptive negotiation framework for agent based dynamic manufacturing scheduling
Chun, W., Shen, W., & Ghenniwa, H. H. (2004) · Conference proceedings/Conference proceedings - IEEE International Conference on Systems, Man, and Cybernetics · doi:10.1109/icsmc.2003.1244576 · Cited by 17
Self-citationObject-oriented and fuzzy-set-based approach for set-up planning
Wu, R., & Zhang, H. (1998) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/bf01304619 · Cited by 14
Cited by
Agent-based distributed manufacturing control: A state-of-the-art survey
Leitão, P. (2009) · Engineering Applications of Artificial Intelligence · doi:10.1016/j.engappai.2008.09.005 · Cited by 841
Artificial Intelligence in Advanced Manufacturing: Current Status and Future Outlook
Arinez, J. F., Chang, Q., Gao, R. X., Xu, C., & Zhang, J. (2020) · Journal of Manufacturing Science and Engineering · doi:10.1115/1.4047855 · Cited by 584
A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction
Fang, K., Uhan, N., Zhao, F., & Sutherland, J. W. (2011) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2011.08.004 · Cited by 552
A Review of Engineering Research in Sustainable Manufacturing
Haapala, K. R., Zhao, F., Camelio, J., Sutherland, J. W., Skerlos, S. J., Dornfeld, D. A., Jawahir, I. S., Clarens, A. F., & Rickli, J. L. (2013) · Journal of Manufacturing Science and Engineering · doi:10.1115/1.4024040 · Cited by 432
Wan, J., Li, X., Dai, H.-N., Kusiak, A., Martinez-Garcia, M., & Li, D. (2021) · Proceedings of the IEEE · doi:10.1109/jproc.2020.3034808 · Cited by 382
Metadata
- Authors
- Shen, W., Wang, L., & Hao, Q.
- Venue
- IEEE Transactions on Systems, Man, and Cybernetics, Part C (Applications and Reviews)
- Published
- 2006-07
- Volume
- 36
- Issue
- 4
- Pages
- 563-577
- ISSN
- 1094-6977 (ISSN-L)
- 1558-2442
- OpenAlex
- W2106025020
- Cited by
- 437
- References
- 36
- FWCI
- 59.85
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.