CoChat

Managing Interdependence: The Effects of Outsourcing Structure on the Performance of Complex Projects*

Hui, Pamsy P., Davis‐Blake, Alison, Broschak, Joseph P. · 2008 · Decision Sciences
Cited by 72

The DOI matches its Crossref record; 4 of the 4 references it cites were found in a registry or an index.

Abstract

The outsourcing of complex activities has become a common organizational practice. Yet very little research has focused on the implications of how these activities are divided up among outsourcing partners. Drawing on structural contingency theory, we argue that: (1) because activities within stages of complex projects are highly interdependent, outsourcing structures where owner firms do not maintain high levels of dominance over the activities that are performed will pose control and coordination challenges, leading to poor project performance; (2) the adverse effects of poorly structured outsourcing arrangements will spill over to subsequent project stages when activities are interdependent across project stages; and (3) dividing activities among large numbers of contractors or distributing work evenly among contractors exacerbates coordination and control problems further contributing to poor project performance. Our empirical analysis of 323 capital facility construction projects supports our predictions. Overall, these results provide strong evidence that some outsourcing structures are more costly than others and that because of the nature of complex projects the detrimental effects of poorly structured outsourcing are often not completely observable at the time activities are completed. We discuss the implications of our findings for capital construction and for outsourcing more generally.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1111/j.1540-5915.2008.00180.x

Cites

4 of 4 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 4 references

Cited by

See all 72

Metadata

Authors
Hui, P. P., Davis‐Blake, A., & Broschak, J. P.
Venue
Decision Sciences
Publisher
Wiley
Published
2008-02
Volume
39
Issue
1
Pages
5-31
ISSN
  • 0011-7315 (ISSN-L)
  • 1540-5915
OpenAlex
W2024739975
Cited by
72
References
4
FWCI
5.15
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Managing Interdependence: The Effects of Outsourcing Structure on the Performance of Complex Projects*. https://app.cochat.ai/papers/10.1111/j.1540-5915.2008.00180.x
The paper
Hui, P. P., Davis‐Blake, A., & Broschak, J. P. (2008). Managing Interdependence: The Effects of Outsourcing Structure on the Performance of Complex Projects*. Decision Sciences. https://doi.org/10.1111/j.1540-5915.2008.00180.x

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.