The DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.
Optimization of construction time-cost trade-off analysis using genetic algorithms
Abstract
In the management of a construction project, the project duration can often be compressed by accelerating some of its activities at an additional expense. This is the so-called time-cost trade-off (TCT) problem, which has been studied extensively in the project management literature. TCT decisions, however, are complex and require planners to select appropriate resources for each project task, including crew size, equipment, methods, and technology. As combinatorial optimization problems, finding optimal decisions is difficult and time consuming considering the number of possible permutations involved. In this paper, a practical model for TCT optimization is developed using the principle of genetic algorithms (GAs). With its robust optimization search, the GAs model minimizes the total project cost as an objective function and accounts for project-specific constraints on time and cost. To maximize its benefits, the model has been implemented as a VBA macro program. This automates TCT analysis and combines it with standard resource-management procedures. Details of the proposed TCT model are described and several experiments conducted to demonstrate its benefits. The developments made in this paper provide guidelines for designing and implementing practical GA applications in the civil engineering domain.Key words: computer application, time-cost trade-off, construction management, genetic algorithms, and optimization.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
An Introduction to Genetic Algorithms
Mitchell, M. (1996) · doi:10.7551/mitpress/3927.001.0001 · Cited by 11,340
Cited by
Comparison among five evolutionary-based optimization algorithms
Elbeltagi, E., Hegazy, T., & Grierson, D. (2005) · Advanced Engineering Informatics · doi:10.1016/j.aei.2005.01.004 · Cited by 1,284
Self-citationResiliency assessment of urban rail transit networks: Shanghai metro as an example
Zhang, D.-M., Du, F., Huang, H., Zhang, F., Ayyub, B. M., & Beer, M. (2018) · Safety Science · doi:10.1016/j.ssci.2018.03.023 · Cited by 279
Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization
Zheng, D. X. M., Ng, S. T., & Kumaraswamy, M. M. (2004) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2004)130:2(168 · Cited by 266
Metadata
- Authors
- Hegazy, T.
- Venue
- Canadian Journal of Civil Engineering
- Publisher
- Canadian Science Publishing
- Published
- 1999
- Volume
- 26
- Issue
- 6
- Pages
- 685-697
- ISSN
- 0315-1468 (ISSN-L)
- 1208-6029
- OpenAlex
- W1970663411
- Cited by
- 229
- References
- 1
- FWCI
- 3.52
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Optimization of construction time-cost trade-off analysis using genetic algorithms. https://app.cochat.ai/papers/10.1139/cjce-26-6-685
- The paper
- Hegazy, T. (1999). Optimization of construction time-cost trade-off analysis using genetic algorithms. Canadian Journal of Civil Engineering. https://doi.org/10.1139/cjce-26-6-685
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.