Adoption of the Building Information Modeling (BIM) for Construction Project Effectiveness: The Review of BIM Benefits
The DOI matches its OpenAlex record; 1 of the 1 references it cites were found in a registry or an index.
Abstract
Building Information Modeling (BIM) has recently attracted extensive attention in the Architectural, Engineering and Construction (AEC) industry with an increase in the use of information technology, all the while increasing productivity, efficiency, infrastructure value, quality, and sustainability, rendering a purer image of constructability issues that are dealt with at the beginning of the construction process. The purpose of this study is to better comprehend the BIM benefits and to analyze BIM adoption, thus providing better understanding of BIM and its usefulness in various stages of the construction projects. Our review concludes that BIM fulfills its purpose through all the stages of the construction project delivering benefits in terms of improved design quality, easiness to implement, information sharing ability, reduction of construction costs and design errors, faster work and shortening the construction time, enhancing energy efficiency, supporting construction and project management, and enabling its owners more operational efficiency in the building lifecycle. The current research identifies relevant factors and outcomes of BIM, and sets up a framework for a future study. The critical review of BIM benefits contributes to the existing body of literature on AEC and BIM.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The project benefits of Building Information Modelling (BIM)
Bryde, D., Broquetas, M., & Volm, J. M. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.12.001 · Cited by 1,268 · cited 1×
“Thus, BIM has implications for constructing more sustainable buildings, by using sustainable methods [19].”
Background
Cited by
Digital twin application in the construction industry: A literature review
Opoku, D.-G. J., Perera, S., Osei-Kyei, R., & Rashidi, M. (2021) · Journal of Building Engineering · doi:10.1016/j.jobe.2021.102726 · Cited by 753
Deng, M., Menassa, C. C., & Kamat, V. R. (2021) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2021.005 · Cited by 422
Na, S., Heo, S., Han, S., Shin, Y., & Roh, Y. (2022) · Buildings · doi:10.3390/buildings12020090 · Cited by 330
Digital twin aided sustainability-based lifecycle management for railway turnout systems
Kaewunruen, S., & Lian, Q. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.04.156 · Cited by 265
BIM and the small construction firm: a critical perspective
Dainty, A., Leiringer, R., Fernie, S., & Harty, C. (2017) · Building Research & Information · doi:10.1080/09613218.2017.1293940 · Cited by 202
“…the academic literature has over the past decade been dominated by claims that the adoption of BIM can lead to improved efficiency (Aranda-Mena et al. 2009, Doumbouya et al. 2016), quality and collaboration ( Demian and Walters, 2014; Ingemansson Havenvid et al. 2016) and so on (see Miettinen and…”
Metadata
- Authors
- Doumbouya, L., Gao, G., & Guan, C.
- Venue
- American journal of civil engineering and architecture
- Published
- 2016-04-22
- Volume
- 4
- Issue
- 3
- Pages
- 74-79
- ISSN
- 2328-398X (ISSN-L)
- OpenAlex
- W2400526434
- Cited by
- 121
- References
- 1
- FWCI
- 6.13
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.