Student or educator? Sign up with your school email and get 6 months of Pro free.
Cited by 552

The DOI matches its Crossref record; 26 of the 26 references it cites were found in a registry or an index.

Project Management Under Risk: Using the Real Options Approach to Evaluate Flexibility in R…D

Huchzermeier, Arnd, Loch, Christoph H.·2001·Management Science

Abstract

Managerial flexibility has value in the context of uncertain R…D projects, as management can repeatedly gather information about uncertain project and market characteristics and, based on this information, change its course of action. This value is now well accepted and referred to as “real option value.” We introduce, in addition to the familiar real option of abandonment, the option of corrective action that management can take during the project. The intuition from options pricing theory is that higher uncertainty in project payoffs increases the real option value of managerial decision flexibility. However, R…D managers face uncertainty not only in payoffs, but also from many other sources. We identify five example types of R…D uncertainty, in market payoffs, project budgets, product performance, market requirements, and project schedules. How do they influence the value from managerial flexibility? We find that if uncertainty is resolved or costs/revenues occur after all decisions have been made, more variability may “smear out” contingencies and thus reduce the value of flexibility. In addition, variability may reduce the probability of flexibility ever being exercised, which also reduces its value. This result runs counter to established option pricing theory intuition and contributes to a better risk management in R…D projects. Our model builds intuition for R…D managers as to when it is and when it is not worthwhile to delay commitments—for example, by postponing a design freeze, thus maintaining flexibility in R…D projects.

Overview

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1287/mnsc.47.1.85.10661

Cites

26 of 26 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 26 references

Cited by

See all 552

Metadata

Authors
Huchzermeier, A., & Loch, C. H.
Venue
Management Science
Published
2001-01
Volume
47
Issue
1
Pages
85-101
ISSN
  • 0025-1909 (ISSN-L)
  • 1526-5501
OpenAlex
W2119828741
Cited by
552
References
26
FWCI
21.52
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Project Management Under Risk: Using the Real Options Approach to Evaluate Flexibility in R…D. https://app.cochat.ai/papers/10.1287/mnsc.47.1.85.10661
The paper
Huchzermeier, A., & Loch, C. H. (2001). Project Management Under Risk: Using the Real Options Approach to Evaluate Flexibility in R…D. Management Science. https://doi.org/10.1287/mnsc.47.1.85.10661

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.