Rescheduling for New Orders
The DOI matches its Crossref record; 8 of the 8 references it cites were found in a registry or an index.
Abstract
This paper considers scheduling problems where a set of original jobs has already been scheduled to minimize some cost objective, when a new set of jobs arrives and creates a disruption. The decision maker needs to insert the new jobs into the existing schedule without excessively disrupting it. Two classes of models are considered. First, we minimize the scheduling cost of all the jobs, subject to a limit on the disruption caused to the original schedule, where this disruption is measured in various ways. In the second class, a total cost objective, which includes both the original cost measure and the cost of disruption, is minimized. For both classes and various costs based on classical scheduling objectives, and for almost all problems, we provide either an efficient algorithm or a proof that such an algorithm is unlikely to exist. We also show how to extend both classes of models to deal with multiple disruptions in the form of repeated arrivals of new jobs. Our work refocuses the extensive literature on scheduling problems towards issues of rescheduling, which are important because of the frequency with which disruptions occur in manufacturing practice.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
(1979) · Cited by 43,841
The Hungarian method for the assignment problem
Kuhn, H. W. (1955) · Naval Research Logistics Quarterly · doi:10.1002/nav.3800020109 · Cited by 13,120
Scheduling: Theory, Algorithms, and Systems
(1996) · IIE Transactions · doi:10.1080/15458830.1996.11770714 · Cited by 6,210
Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
Graham, R. L., Lawler, E. L., Lenstra, J. K., & Kan, A. H. G. R. (1979) · Annals of Discrete Mathematics · doi:10.1016/s0167-5060(08)70356-x · Cited by 5,854
Conway, R. W., Maxwell, W., & Miller, L. W. (1967) · Cited by 2,167
Brucker, P. (2004) · Springer eBooks · doi:10.1007/978-3-540-24804-0 · Cited by 2,064
Various optimizers for single‐stage production
Smith, W. E. (1956) · Naval Research Logistics Quarterly · doi:10.1002/nav.3800030106 · Cited by 1,831 · cited 2×
“Thus, the algorithm of Smith (1956) schedules the jobs according to the (SPT, SPT) property.”
BackgroundMethodSCHEDULING A PRODUCTION LINE TO MINIMIZE MAXIMUM TARDINESS
Jackson, J. R. (1955) · Cited by 796
Cited by
Ant colony intelligence in multi-agent dynamic manufacturing scheduling
Xiang, W., & Lee, H. P. (2008) · Engineering Applications of Artificial Intelligence · doi:10.1016/j.engappai.2007.03.008 · Cited by 211
Metadata
- Authors
- Hall, N. G., & Potts, C. N.
- Venue
- Operations Research
- Published
- 2004-06
- Volume
- 52
- Issue
- 3
- Pages
- 440-453
- ISSN
- 0030-364X (ISSN-L)
- 1526-5463
- OpenAlex
- W2114123132
- Cited by
- 170
- References
- 8
- FWCI
- 21.10
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Rescheduling for New Orders. https://app.cochat.ai/papers/10.1287/opre.1030.0101
- The paper
- Hall, N. G., & Potts, C. N. (2004). Rescheduling for New Orders. Operations Research. https://doi.org/10.1287/opre.1030.0101
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.