Some Properties of Schedules for Large Projects with Limited Resources

Wiest, Jerome D. · 1964 · Operations Research

Abstract

The Critical Path Method, PERT, and related techniques that make use of arrow diagrams for scheduling large projects implicitly assume that unlimited resources are available for assignment to project activities. When resources are limited, however, the usual concepts of “critical path” and “job slack” basic to these methods lose their normal meaning. Jobs may be delayed by the unavailability of resources as well as by technological orderings. A scheme for analyzing project schedules in the limited resource case is developed in this paper, with the intent of preserving for the project scheduler the operational utility of the slack concept. A new procedure for calculating slack values leads to the identification of a “critical sequence” of jobs in a certain class of project schedules—a notion analogous to that of a critical path in the unlimited resource case. Some properties of project schedules when resources are limited are explored and suggestions are made for utilizing the revised concept of slack in scheduling large projects.

Overview

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1287/opre.12.3.395

Cites

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cited by

See all 166

Metadata

Authors
Wiest, J. D.
Venue
Operations Research
Published
1964-06
Volume
12
Issue
3
Pages
395-418
ISSN
  • 0030-364X (ISSN-L)
  • 1526-5463
OpenAlex
W2092940221
Cited by
166
References
0
FWCI
4.13
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Some Properties of Schedules for Large Projects with Limited Resources. https://app.cochat.ai/papers/10.1287/opre.12.3.395
The paper
Wiest, J. D. (1964). Some Properties of Schedules for Large Projects with Limited Resources. Operations Research. https://doi.org/10.1287/opre.12.3.395

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.