The DOI matches its Crossref record; 38 of the 38 references it cites were found in a registry or an index.
Multistage Adaptive Robust Optimization for the Unit Commitment Problem
Abstract
The growing uncertainty associated with the increasing penetration of wind and solar power generation has presented new challenges to the operation of large-scale electric power systems. Motivated by these challenges, we present a multistage adaptive robust optimization model for the most critical daily operational problem of power systems, namely, the unit commitment (UC) problem, in the situation where nodal net electricity loads are uncertain. The proposed multistage robust UC model takes into account the time causality of the hourly unfolding of uncertainty in the power system operation process, which we show to be relevant when ramping capacities are limited and net loads present significant variability. To deal with large-scale systems, we explore the idea of simplified affine policies and develop a solution method based on constraint generation. Extensive computational experiments on the IEEE 118-bus test case and a real-world power system with 2,736 buses demonstrate that the proposed algorithm is effective in handling large-scale power systems and that the proposed multistage robust UC model can significantly outperform the deterministic UC and existing two-stage robust UC models in both operational cost and system reliability.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Breitung, J., & Hamilton, J. D. (1995) · Contemporary Sociology · doi:10.2307/2076916 · Cited by 10,966
Hamilton, J. D. (1994) · Princeton University Press eBooks · doi:10.1515/9780691218632 · Cited by 7,293
Zimmerman, R. D., Murillo-Sanchez, C. E., & Thomas, R. J. (2011) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2010.2051168 · Cited by 6,756
Booth, D. E. (1997) · Technometrics · doi:10.1080/00401706.1997.10485448 · Cited by 3,201
Ben-Tal, A., El Ghaoui, L., & Nemirovski, A. (2009) · Princeton University Press eBooks · doi:10.1515/9781400831050 · Cited by 2,895
Theory and Applications of Robust Optimization
Brown, D. B., Caramanis, C., & Bertsimas, D. (2010) · DSpace@MIT (Massachusetts Institute of Technology) · Cited by 2,524
Adaptive Robust Optimization for the Security Constrained Unit Commitment Problem
Bertsimas, D., Litvinov, E., Sun, X. A., Zhao, J., & Zheng, T. (2012) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2012.2205021 · Cited by 1,672
Self-citationAdjustable robust solutions of uncertain linear programs
Ben-Tal, A., Goryashko, A., Guslitzer, E., & Nemirovski, A. (2004) · Mathematical Programming · doi:10.1007/s10107-003-0454-y · Cited by 1,380
Decision Making Under Uncertainty in Electricity Markets
Conejo, A. J., Carrión, M., & Morales, J. M. (2010) · International Series in Operations Research & Management Science · doi:10.1007/978-1-4419-7421-1 · Cited by 1,231
Erdem, T., & Keane, M. P. (1996) · Marketing Science · doi:10.1287/mksc.15.1.1 · Cited by 1,221
Robust Unit Commitment With Wind Power and Pumped Storage Hydro
Jiang, R., Wang, J., & Guan, Y. (2012) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2011.2169817 · Cited by 941
Security-Constrained Unit Commitment With Volatile Wind Power Generation
Wang, J., Shahidehpour, M., & Li, Z. (2008) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2008.926719 · Cited by 914
Stochastic Security-Constrained Unit Commitment
Wu, L., Shahidehpour, M., & Li, T. (2007) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2007.894843 · Cited by 847
Unit Commitment for Systems With Significant Wind Penetration
Tuohy, A., Meibom, P., Denny, E., & O'Malley, M. (2009) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2009.2016470 · Cited by 703
Decision making under uncertainty in electricity markets
Barroso, L. A., & Conejo, A. J. (2006) · 2006 IEEE Power Engineering Society General Meeting · doi:10.1109/pes.2006.1709323 · Cited by 622
A multicut algorithm for two-stage stochastic linear programs
Birge, J. R., & Louveaux, F. V. (1988) · European Journal of Operational Research · doi:10.1016/0377-2217(88)90159-2 · Cited by 540
Electric Energy Systems : Analysis and Operation
Gómez‐Expósito, A., Conejo, A. J., & Cañizares, C. A. (2008) · Cited by 519
Tight Mixed Integer Linear Programming Formulations for the Unit Commitment Problem
Ostrowski, J., Anjos, M. F., & Vannelli, A. (2012) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2011.2162008 · Cited by 424
Wind Integration in Power Systems: Operational Challenges and Possible Solutions
Xie, L., Carvalho, P. M. S., Ferreira, L. A. F. M., Liu, J., Krogh, B. H., Popli, N., & Ilić, M. (2010) · Proceedings of the IEEE · doi:10.1109/jproc.2010.2070051 · Cited by 412
Lorca, A., & Sun, X. A. (2015) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2014.2357714 · Cited by 411
Self-citationAdjustable Robust OPF With Renewable Energy Sources
Jabr, R. A. (2013) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2013.2275013 · Cited by 380
A Robust Optimization Perspective on Stochastic Programming
Chen, X., Sim, M., & Sun, P. (2007) · Operations Research · doi:10.1287/opre.1070.0441 · Cited by 362
Unified Stochastic and Robust Unit Commitment
Zhao, C., & Guan, Y. (2013) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2013.2251916 · Cited by 323
Robust unit commitment problem with demand response and wind energy
Zhao, L., & Zeng, B. (2012) · IEEE Power Engineering Society General Meeting · doi:10.1109/pesgm.2012.6344860 · Cited by 285
Street, A., Oliveira, F., & Arroyo, J. M. (2010) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2010.2087367 · Cited by 262
The Next Generation of Electric Power Unit Commitment Models
(2001) · International Series in Operations Research & Management Science · doi:10.1007/b108628 · Cited by 261
Constantinescu, E. M., Zavala, V. M., Rocklin, M., Lee, S., & Anitescu, M. (2011) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2010.2048133 · Cited by 259
Primal and dual linear decision rules in stochastic and robust optimization
Kuhn, D., Wiesemann, W., & Georghiou, A. (2011) · Mathematical Programming · doi:10.1007/s10107-009-0331-4 · Cited by 256
A Linear Decision-Based Approximation Approach to Stochastic Programming
Chen, X., Sim, M., Sun, P., & Zhang, J. (2008) · Operations Research · doi:10.1287/opre.1070.0457 · Cited by 248
A Solution to the Stochastic Unit Commitment Problem Using Chance Constrained Programming
Öztürk, U. A., Mazumdar, M., & Norman, B. A. (2004) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2004.831651 · Cited by 243
Optimality of Affine Policies in Multistage Robust Optimization
Bertsimas, D., Iancu, D. A., & Parrilo, P. A. (2010) · Mathematics of Operations Research · doi:10.1287/moor.1100.0444 · Cited by 228
Market Solutions for Managing Ramp Flexibility With High Penetration of Renewable Resource
Navid, N., & Rosenwald, G. (2012) · IEEE Transactions on Sustainable Energy · doi:10.1109/tste.2012.2203615 · Cited by 209
Generalized decision rule approximations for stochastic programming via liftings
Georghiou, A., Wiesemann, W., & Kühn, D. (2014) · Mathematical Programming · doi:10.1007/s10107-014-0789-6 · Cited by 158
Robust multi-echelon multi-period inventory control
Ben‐Tal, A., Golany, B., & Shtern, S. (2009) · European Journal of Operational Research · doi:10.1016/j.ejor.2009.01.058 · Cited by 133
Robust Optimization Made Easy with ROME
Goh, J., & Sim, M. (2011) · Operations Research · doi:10.1287/opre.1110.0944 · Cited by 105
Cutting plane versus compact formulations for uncertain (integer) linear programs
Fischetti, M., & Monaci, M. (2012) · Mathematical Programming Computation · doi:10.1007/s12532-012-0039-y · Cited by 88
Robust reserve operation in power systems using affine policies
Warrington, J., Goulart, P. J., Mariéthoz, S., & Morari, M. (2012) · IEEE Conference on Decision and Control (CDC) · doi:10.1109/cdc.2012.6425913 · Cited by 34
Dullerud, G. E. (1996) · Birkhäuser Boston eBooks · doi:10.1007/978-1-4612-2440-2_5 · Cited by 14
Cited by
Ning, C., & You, F. (2019) · Computers & Chemical Engineering · doi:10.1016/j.compchemeng.2019.03.034 · Cited by 343
Power systems optimization under uncertainty: A review of methods and applications
Roald, L. A., Pozo, D., Papavasiliou, A., Molzahn, D. K., Kazempour, J., & Conejo, A. (2023) · Electric Power Systems Research · doi:10.1016/j.epsr.2022.108725 · Cited by 317
Chance-Constrained AC Optimal Power Flow: Reformulations and Efficient Algorithms
Roald, L., & Andersson, G. (2018) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2017.2745410 · Cited by 267
Metadata
- Authors
- Lorca, Á., Sun, X. A., Litvinov, E., & Zheng, T.
- Venue
- Operations Research
- Published
- 2016-02
- Volume
- 64
- Issue
- 1
- Pages
- 32-51
- ISSN
- 0030-364X (ISSN-L)
- 1526-5463
- OpenAlex
- W2225094937
- Cited by
- 276
- References
- 38
- FWCI
- 12.50
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.