Constructing the Olympic Dream: A Future Perfect Strategy of Project Management
Open accessAbstract
In this paper we investigate a uniquely complex organizational context—that of the fast-tracked large-scale project management of a significant piece of Sydney 2000 Olympic infrastructure, which we researched in terms of its management through the “future perfect.” In a grounded analysis we resolved to track how the future perfect developed in the life of one large, complex project whose uniqueness meant that it was unable to be strategically planned in advance. We tracked the use of what we term “future perfect strategy” through analysis of data collected both in leadership meetings of the directing agency, “PALT”—Project Alliance Leadership Team—as well as in individual interviews that we conducted in and around the project, and through analysis of media coverage. Overall, the project was a success, but some problems arose along the way to completion. Largely, these were focused on issues of social rather than technical construction—something even the most strategic of plans cannot account for. As well as identifying some of the specific mechanisms for encouraging future perfect strategy that were used in the project, including encouraging “strange conversations,” “playing end games,” “workshopping,” and “projecting feelings, concerns and issues,” we also suggest some ways that the social construction issues might be handled in the future.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Bell, E., Bryman, A., & Harley, B. (2022) · Oxford University Press eBooks · doi:10.1093/hebz/9780198869443.001.0001 · Cited by 10,965
Core capabilities and core rigidities: A paradox in managing new product development
Leonard-Barton, D. (1992) · Strategic Management Journal · doi:10.1002/smj.4250131009 · Cited by 6,477
WHY COMPANIES GO GREEN: A MODEL OF ECOLOGICAL RESPONSIVENESS.
Bansal, P., & Roth, K. (2000) · Academy of Management Journal · doi:10.2307/1556363 · Cited by 4,020
Cited by
Costas, J., & Grey, C. (2014) · Organization Studies · doi:10.1177/0170840613502768 · Cited by 117
Metadata
- Authors
- Pitsis, T. S., Clegg, S. R., Marosszeky, M., & Rura-Polley, T.
- Venue
- Organization Science
- Published
- 2003-10
- Volume
- 14
- Issue
- 5
- Pages
- 574-590
- ISSN
- 1047-7039 (ISSN-L)
- 1526-5455
- OpenAlex
- W2058144861
- Cited by
- 306
- References
- 3
- FWCI
- 7.24
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Constructing the Olympic Dream: A Future Perfect Strategy of Project Management. https://app.cochat.ai/papers/10.1287/orsc.14.5.574.16762
- The paper
- Pitsis, T. S., Clegg, S. R., Marosszeky, M., & Rura-Polley, T. (2003). Constructing the Olympic Dream: A Future Perfect Strategy of Project Management. Organization Science. https://doi.org/10.1287/orsc.14.5.574.16762
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.