Cited by 1Scheduling and Optimization AlgorithmsManagement and Optimization TechniquesHealthcare Operations and Scheduling Optimization

Production Scheduling System Based on Customer Orders at AsMedia Percetakan Nganjuk

Open access
Ananda, Melyka Ayu, Handayani, Wiwik·2024·International Journal of Scientific Research and Management (IJSRM)

Abstract

This research aims to identify the most effective production scheduling system at AsMedia Percetakan Nganjuk to reduce delays in order fulfillment. The proposed scheduling method is based on a priority rule system with the following criteria: First Come First Served (FCFS), Short Processing Time (SPT), Long Processing Time (LPT), and Earliest Due Date (EDD). Based on the results of data analysis and discussion, the First Come First Served (FCFS) and Earliest Due Date (EDD) methods are considered superior compared to the other methods. This is based on findings that show the effectiveness of the First Come First Served (FCFS) and Earliest Due Date (EDD) methods aligns with current criteria, including minimum average completion time, maximum utilization, minimum average number of jobs in the system, and minimum delays. Therefore, the researcher recommends that AsMedia Percetakan Nganjuk use the First Come First Served (FCFS) and Earliest Due Date (EDD) methods as alternative production scheduling methods. Given the relatively high average job delays with each method used, the company is deemed less effective in production scheduling. This is evident from the relatively high average job delays with each method used. Therefore, the solution the researcher can offer to AsMedia Percetakan Nganjuk is to increase the workforce and production machine capacity.

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.18535/ijsrm/v12i09.em06

Cites

Statistics

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Cites

No references could be resolved yet.

Research works printed but not linked: 13

  1. Baker, Kenneth R. (2020). Introduction to Sequencing and Scheduling (3rd ed.). Retrieved from https://openlibrary.org/books/OL5047415M/Introduction_to_sequencing_and_scheduling
  2. Fadli, Muhammad Rizal, & Wiwik Sulistyowati. (2019). Optimalisasi Penjadwalan Produksi Pipa Di Line 18 Dengan Metode First Come First Serve (Fcfs), Earlier Due Date (Edd), Short Process Time (Spt). PROZIMA (Productivity, Optimization and Manufacturing System Engineering), 3(2), 44-54.
  3. Faris, Moh. Fahrul, & Handayani, Wiwik. (2021). Analisis Penjadwalan Produksi Berdasarkan Pesanan Menggunakan Metode Asas Prioritas pada CV Davero Cemerlang Indonesia Surabaya. Al-Kharaj : Jurnal Ekonomi, Keuangan & Bisnis Syariah, 4(2), 380-396. https://doi.org/10.47467/alkharaj.v4i2.676 · DOI
  4. Gao, Jianfeng, & Chien, Chien Feng. (2021). Smart Manufacturing Scheduling Systems: Performance Analysis and Simulation-Based Optimization. Springer.
  5. Hardani, Auliya, Nur Hikmatul, Andriani, Helmina, Fardani, Roushandy Asri, Ustiawaty, Jumari, Utami, Evi Fatmi, Sukmana, Dhika Juliana, & Istiqomah, Ria Rahmatul. (2020). Metode Penelitian Kualitatif & Kuantitatif (Husnu Abadi, ed.). CV. Pustaka Ilmu.
  6. Heizer, Jay, & Render, Barry. (2020). Operations Management (13th ed.). Salemba Empat.
  7. Heizer, Jay, & Render, Barry. (2021). Operations Management: Sustainability and Supply Chain Management (13th ed.). Retrieved from https://books.google.co.id/books/about/Operations_Management.html?id=XX7xoAEACAAJ&redir_e sc=y
  8. Kiran, D. R. (2019). Production Planning and Control: A Comprehensive Approach. In Production Planning and Control. https://doi.org/10.1016/b978-0-12-818364-9.00036-6 · DOI
  9. Pinedo, Michael L. (2020). Scheduling: Theory, Algorithms, and Systems (6th ed.). Retrieved from https://link.springer.com/book/10.1007/978-3-031-059 · DOI
  10. Render, Jay, & Barry, Roberta M. (2020). Operations Management: Creating Value Along the Supply Chain (12th ed.).
  11. Safitri, Rosi Indah. (2019). Analisis Sistem Penjadwalan Produksi Berdasarkan Pesanan Pelanggan dengan Metode FCFS, LPT, SPT dan EDD Pada PD. X. Jurnal Optimasi Teknik Industri (JOTI), 1(2), 26. https://doi.org/10.30998/joti.v1i2.3840 · DOI
  12. Sarwono, Jonathan. (2023). Metode Penelitian Kuantitatif & Kualitatif (6th ed.). Yogyakarta: Penerbit Andi.
  13. Sugiyono. (2023). Metode Penelitian Kuantitatif, Kualitatif, dan R&D (18th ed.). Bandung: Alfabeta.

Cited by

Sorted by citations

Authors
Ananda, M. A., & Handayani, W.
Affiliations
University of Pembangunan Nasional Veteran Jawa Timur (ID)
Venue
International Journal of Scientific Research and Management (IJSRM)
Published
2024-09-10
Volume
12
Issue
09
Pages
7388-7398
ISSN
2321-3418 (ISSN-L)
OpenAlex
W4402495090
Cited by
0
References
0
FWCI
0.00
Type
journal article
Language
en
Open access
Locations
International Journal of Scientific Research and Management (IJSRM) (publishedVersion, cc-by)
Topics
  • Physical Sciences › Engineering › Industrial and Manufacturing Engineering › Scheduling and Optimization Algorithms
  • Social Sciences › Business, Management and Accounting › Strategy and Management › Management and Optimization Techniques
  • Health Sciences › Health Professions › Emergency Medical Services › Healthcare Operations and Scheduling Optimization
Keywords
production scheduling, printing industry, customer orders, dispatching rules, first come first served, earliest due date, average completion time, equipment utilization

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review