The DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.
Production Optimization in Closed-Loop Reservoir Management
Abstract
Summary: In closed-loop reservoir management, one periodically updates reservoir models by integrating production data and then solves an optimal control problem to determine optimum operating conditions to maximize hydrocarbon production or net present value (NPV) for the remaining expected life of the reservoir. The cycle of model updating and production optimization is repeated at specified times. Here, to account for geological uncertainty, we suggest using the ensemble Kalman filter for reservoir model updating and consider three different algorithms for production optimization. Two simple but representative examples indicate that the steepest ascent algorithm is the best of the optimization methods. If the required adjoint software for calculating the gradient of NPV with respect to the controls is not available, we show that iteration using an easily computed stochastic gradient can yield a good estimate of the optimal NPV if properly implemented. For the problem considered, it is shown that NPV is a nonlinear function of the controls, but the final controls from the cases with both known true geology and uncertain geology show "bang-bang" behavior.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Evensen, G. (1994) · Journal of Geophysical Research: Oceans · doi:10.1029/94jc00572 · Cited by 5,371
Cited by
Ensemble smoother with multiple data assimilation
Emerick, A. A., & Reynolds, A. C. (2013) · Computers & Geosciences · doi:10.1016/j.cageo.2012.03.011 · Cited by 1,007
Self-citationEfficient Ensemble-Based Closed-Loop Production Optimization
Chen, Y., Oliver, D. S., & Zhang, D. (2009) · SPE Journal · doi:10.2118/112873-pa · Cited by 374
Closed-Loop Reservoir Management
Jansen, J. D., Douma, S. D., Brouwer, D. R., Van den Hof, P. M. J., Bosgra, O. H., & Heemink, A. W. (2009) · SPE Reservoir Simulation Symposium · doi:10.2118/119098-ms · Cited by 308
Metadata
- Authors
- Wang, C., Li, G., & Reynolds, A. C.
- Venue
- SPE Journal
- Publisher
- Society of Petroleum Engineers (SPE)
- Published
- 2008-05-18
- Volume
- 14
- Issue
- 03
- Pages
- 506-523
- ISSN
- 1086-055X (ISSN-L)
- 1930-0220
- OpenAlex
- W2103720101
- Cited by
- 237
- References
- 1
- FWCI
- 24.18
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Production Optimization in Closed-Loop Reservoir Management. https://app.cochat.ai/papers/10.2118/109805-pa
- The paper
- Wang, C., Li, G., & Reynolds, A. C. (2009). Production Optimization in Closed-Loop Reservoir Management. SPE Journal. https://doi.org/10.2118/109805-pa
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.