CoChat

Task-Driven Long-Term Co-Planning of Computing, Communication, and Power Infrastructure in China

Lv, Jian, Chen, Xiaohong, Liu, Yongmei · 2026
PreprintCited by 0

The DOI matches its Crossref record; the references it cites are not checked yet.

Abstract

The rapid development of artificial intelligence is driving the continued expansion of computing infrastructure, creating large-scale and spatially concentrated electricity demand. Existing long-term planning studies typically treat computing loads as fixed exogenous demand, making it difficult to capture how spatiotemporal workload flexibility and communication infrastructure affect long-term power-system investment. This study extends the SWITCH-China framework and develops a task-driven, multi-period co-planning model for computing, communication, and power infrastructures. The model jointly optimizes computing-facility deployment, spatiotemporal workload scheduling, communication-network expansion, and investments in generation, storage, and transmission across 32 provincial load zones in China. Counterfactual scenarios for 2025-2050 are used to identify the long-term effects of computing-demand growth, workload flexibility, and communication constraints. The results show that, over a broad range of demand growth, additional computing demand is primarily accommodated through expansion of wind, solar, storage, and network infrastructure, while the dominant power-system technology mix remains broadly stable. Carbon capture and storage (CCS) and additional pumped-storage capacity enter the marginal technology mix more prominently only under extremely high demand. Spatiotemporal workload flexibility reduces total discounted planning costs by approximately 2.68%, with about 98.5% of the savings arising from fixed computing-infrastructure costs. Shapley attribution assigns approximately 64.7% and 35.3% of the joint value to temporal and spatial flexibility, respectively. Temporal flexibility mainly reduces computing-capacity requirements by smoothing local workload peaks, whereas spatial flexibility mainly reshapes provincial computing deployment by relocating task execution. Communication capacity further determines the extent to which potential spatial flexibility can be realized. With task attributes and feasible interprovincial migration links held fixed, existing communication capacity alone realizes about 51% of the reference interprovincial workload migration while capturing about 94% of the reference economic value of spatial flexibility. This indicates that migration volume and economic value are not linearly related, and that greater interprovincial workload migration does not necessarily reduce transmission expansion. These findings reveal the distinct mechanisms through which computingdemand growth, spatiotemporal workload flexibility, and communication constraints shape long-term infrastructure investment.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.2139/ssrn.7372739

Cites

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Metadata

Authors
Lv, J., Chen, X., & Liu, Y.
Publisher
Elsevier BV
Published
2026
Cited by
0
Type
Preprint

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Task-Driven Long-Term Co-Planning of Computing, Communication, and Power Infrastructure in China. https://app.cochat.ai/papers/10.2139/ssrn.7372739
The paper
Lv, J., Chen, X., & Liu, Y. (2026). Task-Driven Long-Term Co-Planning of Computing, Communication, and Power Infrastructure in China. https://doi.org/10.2139/ssrn.7372739

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.