Abstract

E-government information systems (IS) projects experience numerous challenges that can lead to total or partial failure. The project failure factors have been identified and studied by numerous researchers, but the root causes of such failures are not well-articulated. In this study, literature on e-government IS project failures in developing-world contexts is reviewed through the application of qualitative meta-synthesis, design–reality gap analysis, and root cause analysis. In the process, 18 causal factors and 181 root causes are identified as responsible for e-government IS project failures. The most prevalent of the 18 causal factors are found to be inadequate system requirements engineering (with 22 root causes), inadequate project management (19 root causes), and missing or incomplete features (16 root causes). These findings can be of use to future researchers, policymakers, and practitioners seeking to identify methods of avoiding e-government IS failures, particularly in developing-world contexts.

Overview

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.23962/10539/32210

Cites

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Claims other papers make about this one

Each is checked against this paper’s own text: does it say what the citing paper says it does?

  • These issues are further compounded in decentralised systems where project governance can vary significantly across regions.

    “These issues are further compounded in decentralised systems where project governance can vary significantly across regions (Nyansiro et al., 2021).”

    From PROJECT MANAGEMENT CHALLENGES IN PUBLIC SECTOR IT: A CASE STUDY IN PALU (2026) · cites this paper as Nyansiro et al., 2021

    The sections on inappropriate organisational management structure and integration failure discuss governance and coordination challenges, but do not say that decentralised systems compound them or that project governance varies across regions. Searches for decentralised systems and regions found no passage addressing that specific claim; page numbers were unavailable in the indexed passages. (LLM, conf=0.72)

    Experimental — accuracy not yet measured

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

No references could be resolved yet.

Research works printed but not linked: 75

  1. Abbas, A., Faiz, A., Fatima, A., & Avdic, A. (2017). Reasons for the failure of government IT projects in Pakistan: A contemporary study. In IEEE (Ed.), 2017 International Conference on Service Systems and Service Management (ICSSSM 2017). https://doi.org/10.1109/ICSSSM.2017.7996223 · DOI
  2. Afyonluoğlu, M., Aydin, A., Sevil, S. G., Yüksel, E., & Güngör, M. K. (2014). An e-government project management approach with e-transformation perspective. International Journal of eBusiness and eGovernment Studies, 6(1), 21–33.
  3. Aikins, S. K. (2012). Improving e-government project management: Best practices and critical success factors. In S. K. Aikins (Ed.), Managing e-government projects: Concepts, issues, and best practices (pp. 42–60). IGI Global. https://doi.org/10.4018/978-1-4666-0086-7.ch003 · DOI
  4. Al-Ahmad, W., Al-Fagih, K., Khanfar, K., Alsamara, K., Abuleil, S., & Abu-Salem, H. (2009). A taxonomy of an IT project failure: Root causes. International Management Review, 5(1), 93–104.
  5. Al-Khanjari, Z. A., Al-Hosni, N., & Kraiem, N. (2014). Developing a service oriented e-government architecture towards achieving e-government interoperability. International Journal of Software Engineering and its Applications, 8(5), 29–42. https://doi.org/10.14257/ijseia.2014.8.5.04 · DOI
  6. Al Salmi, M., Mohtar, S., & Hasnan, N. (2017). Skills and factors of e-government: Case study of Sultanate of Oman. International Journal of Innovation, Management and Technology, 8(4), 313–319. https://doi.org/10.18178/ijimt.2017.8.4.747 · DOI
  7. Al-Zwainy, F. M. S., Mohammed, I. A., & Varouqa, I. F. (2018). Diagnosing the causes of failure in the construction sector using root cause analysis technique. Journal of Engineering, 1804053, 1–12. https://doi.org/10.1155/2018/1804053 · DOI
  8. Baguma, R., & Lubega, J. (2013). Factors for success and failure of e-government projects. In ICEGOV’13: Proceedings of the 7th International Conference on Theory and Practice of Electronic Governance (pp. 194–197). https://doi.org/10.1145/2591888.2591921 · DOI
  9. Bail, W. (2010). Effective requirements engineering. In SIGAda ’10:Proceedings of the ACM SIGAda Annual International Conference on SIGAda. https://doi.org/10.1145/1879063.1879065 · DOI
  10. Bakunzibake, P., Grönlund, Å., & Klein, G. O. (2018). E-government implementation in developing countries: Enterprise content management in Rwanda. In H. J. Scholl, O. Glassey, & M. Janssen (Eds.), Electronic government and electronic participation. IOS Press. https://doi.org/10.3233/978-1-61499-670-5-251 · DOI
  11. Boota, M. W., Ahmad, N., & Masoom, A. H. (2014). Requirement engineering issues and their solutions. International Journal of Engineering and Technical Research (IJETR 2014), 2(11), 50–56.
  12. Botchkarev, A., & Finnigan, P. (2015). Complexity in the context of information systems project management. Organisational Project Management, 2(1), 15–34. https://doi.org/10.5130/opm.v2i1.4272 · DOI
  13. Bubenko, J. A. (1995). Challenges in requirements engineering. In IEEE (Ed.), Proceedings of IEEE International Symposium on Requirements Engineering (RE’95) (pp. 160–162). https://doi.org/10.1109/isre.1995.512557 · DOI
  14. Chaudhary, S. (2017). Latest software testing tools and techniques: A review. International Journal of Advanced Research in Computer Science and Software Engineering, 7(5), 538–540. https://doi.org/10.23956/ijarcsse/SV7I5/0138 · DOI
  15. Dada, D. (2006). The failure of e-government in developing countries: A literature review. The Electronic Journal of Information Systems in Developing Countries, 26(1), 1–10. https://doi.org/10.1002/j.1681-4835.2006.tb00176.x · DOI
  16. Dahiya, D., & Mathew, S. K. (2018). IT infrastructure capability and e-government system performance: An empirical study. Transforming Government: People, Process and Policy, 12(1), 16–38. https://doi.org/10.1108/TG-07-2017-0038 · DOI
  17. Dalal, S., & Chhillar, R. S. (2013). Empirical study of root cause analysis of software failure. ACM SIGSOFT Software Engineering Notes, 38(4), 1–7. https://doi.org/10.1145/2492248.2492263 · DOI
  18. Damoah, I. S., & Akwei, C. (2017). Government project failure in Ghana: A multidimensional approach. International Journal of Managing Projects in Business, 10(1), 32–59. https://doi.org/10.1108/IJMPB-02-2016-0017 · DOI
  19. Dwivedi, Y. K., Wastell, D., Laumer, S., Henriksen, H. Z., Myers, M. D., Bunker, D., Elbanna, A., Ravishankar, M. N., & Srivastava, S. C. (2014). Research on information systems failures and successes: Status update and future directions. Information Systems Frontiers, 17(1), 143–157. https://doi.org/10.1007/s10796-014-9500-y · DOI · Paper page
  20. Feldgen, M., & Clua, O. (2014). Teaching effective requirements engineering for largescale software development with scaffolding. In IEEE (Ed.), 2014 IEEE Frontiers in Education Conference (FIE) proceedings. https://doi.org/10.1109/FIE.2014.7044176 · DOI
  21. Gartlan, J., & Shanks, G. (2007). The alignment of business and information technology strategy in Australia. Australasian Journal of Information Systems, 14(2), 113–139. https://doi.org/10.3127/ajis.v14i2.184 · DOI
  22. Ghapanchi, A., & Albadvi, A. (2008). A framework for e-government planning and implementation. Electronic Government: An International Journal, 5(1), 71–90. https://doi.org/10.1504/EG.2008.016129 · DOI
  23. Gilbert, D., Balestrini, P., & Littleboy, D. (2004). Barriers and benefits in the adoption of e-government. International Journal of Public Sector Management, 17(4), 286–301. https://doi.org/10.1108/09513550410539794 · DOI
  24. Goedeke, J., Mueller, M., & Pankratz, O. (2017). Uncovering the causes of information system project failure. In AMCIS 2017 proceedings (pp. 1–10).
  25. Gunawong, P., & Gao, P. (2017). Understanding e-government failure in the developing country context: A process-oriented study. Information Technology for Development, 23(1), 153–178. https://doi.org/10.1080/02681102.2016.1269713 · DOI
  26. Hangal, S., & Lam, M. S. (2002). Tracking down software bugs using automatic anomaly detection. In ICSE ‘02: Proceedings of the 24th International Conference on Software Engineering (pp. 291–301). https://doi.org/10.1145/581376.581377 · DOI
  27. Hasan, M. M. (2015). E-government success and failure: A case study of Bangladesh police. Daffodil International University Journal of Science and Technology, 10(1), 61–67.
  28. Heeks, R. (Ed.). (1999). Reinventing government in the information age: International practice in IT-enabled public sector reform (1st ed.). Routledge. https://doi.org/10.4324/9780203204962 · DOI
  29. Heeks, R. (2001). Understanding e-governance for development. iGovernment Working Paper 11. https://doi.org/10.2139/ssrn.3540058 · DOI
  30. Heeks, R. (2003). Most eGovernment-for-development projects fail: How can risks be reduced? iGovernment Working Paper 14. https://doi.org/10.2139/ssrn.3540052 · DOI
  31. Hofmann, H. F., & Lehner, F. (2001). Requirements engineering as a success factor in software projects. IEEE Software, 18(4), 58–66. https://doi.org/10.1109/MS.2001.936219 · DOI
  32. Hossan, C. G., & Kushchu, I. (2006). Success and failure factors for e-government projects implementation in developing countries: A study on the perception of government officials of Bangladesh. https://www.semanticscholar.org/paper/Success-and-FailureFactors-for-e-Government-in-%3A-A-Hossan-Habib/2f519f1afb33ed4acc870aa2459681fce84a2399
  33. Hussain, A., Mkpojiogu, E. O. C., & Abdullah, I. (2016). Requirements engineering practices in UUMIT centre: An assessment based on the perceptions of in-house software developers. Journal of Telecommunication, Electronic and Computer Engineering, 8(8), 27–32.
  34. Hussain, A., Mkpojiogu, E. O. C., & Kamal, F. M. (2016). The role of requirements in the success or failure of software projects. International Review of Management and Marketing, 6(S7), 306–311.
  35. Hussein, R., Shahriza, N., & Karim, A. (2007). The impact of technological factors on information systems success in the electronic-government context. Business Process Management Journal, 13(5), 613–627. https://doi.org/10.1108/14637150710823110 · DOI
  36. Imran, A., Gregor, S., & Turner, T. (2017). eGovernment management for developing countries (2nd ed.). ACPI.
  37. Khan, N., & Islamabad, D. E. (2009). Public sector innovation: Case study of e-government projects in Pakistan. The Pakistan Development Review, 48(4), 439–457. https://doi.org/10.30541/v48i4IIpp.439-457 · DOI
  38. Lachal, J., Revah-Levy, A., Orri, M., & Moro, M. R. (2017). Metasynthesis: An original method to synthesize qualitative literature in psychiatry. Frontiers in Psychiatry, 8, 269. https://doi.org/10.3389/fpsyt.2017.00269 · DOI
  39. Lam, W. (2005). Barriers to e-government integration. Journal of Enterprise Information Management, 18(5), 511–530. https://doi.org/10.1108/17410390510623981 · DOI
  40. Layne, K., & Lee, J. (2001). Developing fully functional e-government: A four stage model. Government Information Quarterly, 18(2), 122–136. https://doi.org/10.1016/S0740-624X(01)00066-1 · DOI
  41. Livingston, A. D., Jackson, G., & Priestley, K. (2001). Root causes analysis: Literature review. HSE Books.
  42. Mansor, Z., & Ndudi, E. E. (2015). Issues, challenges and best practices of software testing activity. In Recent Advances in Computer Engineering (pp. 42–47), proceedings of ACE 2015, Seoul. https://www.wseas.us/e-library/conferences/2015/Seoul/ACE/ACE-06.pdf
  43. Martin, R. L., & Montagna, J. M. (2006). Business process reengineering role in electronic government. In D. E. Avison, S. Elliot, J. Krogstie, & J. Pries-Heje (Eds.) The past and future of information systems: 1976–2006 and beyond: IFIP 19th World Computer Congress, TC-8, Information System Stream, August 21–23, 2006, Santiago, Chile (pp. 77–88). Springer. https://doi.org/10.1007/978-0-387-34732-5 · DOI
  44. Matte, R. (2017). Bureaucratic structures and organizational performance: A comparative study of Kampala Capital City Authority and National Planning Authority. Journal of Public Administration and Policy Research, 9(1), 1–16. https://doi.org/10.5897/JPAPR2016.0377 · DOI
  45. Michael, K. A., & Boniface, K. A. (2014). Inadequate requirements engineering process: A key factor for poor software development in developing nations: A case study. International Journal of Computer, Electrical, Automation, Control and Information Engineering, 8(9), 1572–1575.
  46. Mukherjee, I. (2008). Understanding information system failures from the complexity perspective. Journal of Social Sciences, 4(4), 308–319. https://doi.org/10.3844/jssp.2008.308.319 · DOI
  47. Nograsek, J. (2011). Change management as a critical success factor in e-government implementation. Business Systems Research, 2(2), 1–56. https://doi.org/10.2478/v10305-012-0016-y · DOI
  48. Ojha, S., & Pandey, I. M. (2017). Management and financing of e-government projects in India: Does financing strategy add value? IIMB Management Review, 20, 1–19. https://doi.org/10.1016/j.iimb.2017.04.002 · DOI
  49. Paradies, M., & Busch, D. (1988). Root cause analysis at Savannah River Plant nuclear power station. In Conference record for 1988 IEEE Fourth Conference on Human Factors and Power Plants. https://doi.org/10.1109/HFPP.1988.27547 · DOI
  50. Patanakul, P. (2014). Managing large-scale IS/IT projects in the public sector: Problems and causes leading to poor performance. Journal of High Technology Management Research, 25(1), 21–35. https://doi.org/10.1016/j.hitech.2013.12.004 · DOI
  51. Pohl, K. (2010). Requirements engineering: Fundamentals, principles, and techniques (1st ed). Springer. · DOI
  52. Rahman, S., Rashid, N., Yadlapalli, A., & Yiqun, L. (2014). Determining factors of e-government implementation: A multi-criteria decision-making approach. In Proceedings - Pacific Asia Conference on Information Systems (PACIS 2014).
  53. Rajala, T., & Aaltonen, H. (2020). Reasons for the failure of information technology projects in the public sector. In H. Sullivan, H. Dickinson, & H. Henderson (Eds.), The Palgrave handbook of the public servant (pp. 1–21). Palgrave MacMillan. https://doi.org/10.1007/978-3-030-03008-7_78-1 · DOI
  54. Rajapakse, J., Van der Vyver, A., & Hommes, E. (2012). E-government implementations in developing countries: Success and failure, two case studies. In IEEE (Ed.), 2012 IEEE 6th International Conference on Information and Automation for Sustainability (pp. 95–100). https://doi.org/10.1109/ICIAFS.2012.6419888 · DOI
  55. Palanisamy, R. (2004). Issues and challenges in electronic governance planning. Electronic Government, an International Journal, 1(3), 253-272. https://doi.org/10.1504/EG.2004.005551 · DOI
  56. Reffat, R. M. (2003). Developing a successful e-government. In The proceedings of the Symposium on E-Government: Opportunities and Challenge, Muscat Municipality (pp 1–13).
  57. Sæbø, Ø. (2012). E-government in Tanzania: Current status and future challenges. In H. J. Scholl, M. Janssen, M. A. Wimmer, C. E. Moe, & L. S. Flak (Eds.), Electronic government: 11th IFIP WG 8.5 International Conference, EGOV 2012, Kristiansand, Norway, September 3-6, 2012. (pp. 198–209). https://doi.org/10.1007/978-3-642-33489-4_17 · DOI
  58. Sandelowski, M., Docherty, S., & Emden, C. (1997). Qualitative metasynthesis: Issues and techniques. Research in Nursing & Health, 20(4), 365–371. https://doi.org/10.1002/(SICI)1098-240X(199708)20:4<365::AID-NUR9>3.0.CO;2-E · DOI
  59. Shah, S. R. A., Khan, A. Z., & Khalil, D. M. S. (2011). Project management practices in e-government projects: A case study of electronic government directorate (EGD) in Pakistan. International Journal of Business and Social Science, 2(7), 235–243.
  60. Shah, T., & Patel, S. V. (2014). A review of requirement engineering issues and challenges in various software development methods. International Journal of Computer Applications, 99(15), 36–45. https://doi.org/10.5120/17451-8370 · DOI
  61. Sun, P. L., Ku, C. Y., & Shih, D. H. (2015). An implementation framework for e-government 2.0. Telematics and Informatics, 32(3), 504–520. https://doi.org/10.1016/j.tele.2014.12.003 · DOI
  62. Swartz, E. M. J. (2018). Challenges to the implementation of business process re-engineering of the recruitment process in the Ministry of Fisheries and Marine Resources, Namibia. MPA thesis, Faculty of Economic and Management Sciences, University of Stellenbosch. https://scholar.sun.ac.za/handle/10019.1/103566
  63. Sweis, R. J. (2015). An investigation of failure in information systems projects: The case of Jordan. Journal of Management Research, 7(1), 173–185. https://doi.org/10.5296/jmr.v7i1.7002 · DOI
  64. Thakur, S., & Singh, S. (2012). A study of some e-government activities in South Africa. 2012 E-Leadership Conference on Sustainable e-Government and e-Business Innovations (E-LEADERSHIP) (pp. 1–11). https://doi.org/10.1109/e-Leadership.2012.6524704 · DOI
  65. Tomić, B., & Brkić, V. S. (2011). Effective root cause analysis and corrective action process. Journal of Engineering Management and Competitiveness ( JEMC), 1(1/2), 16–20. http://www.tfzr.uns.ac.rs/jemc
  66. Toots, M. (2019). Why e-participation systems fail: The case of Estonia’s Osale.ee. Government Information Quarterly, 36(3), 546–559. https://doi.org/10.1016/j.giq.2019.02.002 · DOI
  67. Trkman, P. (2010). The critical success factors of business process management. International Journal of Information Management, 30(2), 125–134. https://doi.org/10.1016/j.ijinfomgt.2009.07.003 · DOI
  68. Twizeyimana, J. D., Larsson, H., & Grönlund, Å. (2018). Egovernment in Rwanda: Implementation, challenges and reflections. The Electronic Journal of E-Government, 16(1), 19–31.
  69. Ullah, S., Iqbal, M., & Khan, A. M. (2011). A survey on issues in non-functional requirements elicitation. In Proceedings of International Conference on Computer Networks and Information Technology (pp. 333–340). https://doi.org/10.1109/ICCNIT.2011.6020890 · DOI
  70. Verner, J., Sampson, J., & Cerpa, N. (2008). What factors lead to software project failure? In 2008 Second International Conference on Research Challenges in Information Science (pp. 71–80). https://doi.org/10.1109/RCIS.2008.4632095 · DOI
  71. Vyas, V., Vyas, S., & Kundan, A. (2014). Management information system: Information needs of organisation. International Journal of Information & Computation Technology, 4(17), 1903–1908.
  72. Williams, P. M. (2001). Techniques for root cause analysis. Baylor University Medical Center Proceedings, 14(2), 154–157. https://doi.org/10.1080/08998280.2001.11927753 · DOI
  73. Xia, W., & Lee, G. (2005). Complexity of information systems development projects: Conceptualization and measurement development. Journal of Management Information Systems, 22(1), 45–83. https://doi.org/10.1080/07421222.2003.11045831 · DOI
  74. Zakaria, N. H., Haron, A., Sahibuddin, S., & Harun, M. (2011). Requirement engineering critical issues in public sector software project success factor. International Journal of Information and Electronics Engineering, 1(3), 200–209. https://doi.org/10.7763/IJIEE.2011.V1.32 · DOI
  75. Zwikael, O. (2014). Top management involvement in project management: Exclusive support practices for different project scenarios. International Journal of Managing Projects in Business, 1(3), 387–403. https://doi.org/10.1108/17538370810883837 · DOI

Cited by

Sorted by citations

Metadata

Authors
Nyansiro, J. B., Mtebe, J. S., & Kissaka, M. M.
Affiliations
University of Dar es Salaam (TZ)
Venue
The African Journal of Information and Communication (AJIC)
Published
2021-12-06
Issue
28
ISSN
  • 2077-7205 (ISSN-L)
  • 2077-7213
OpenAlex
W4200607347
Cited by
23
References
0
Citations by year
2026: 5 · 2025: 8 · 2024: 7 · 2023: 3
FWCI
6.00
Type
journal article
Language
en
Open access
Locations
  • The African Journal of Information and Communication (AJIC) (publishedVersion, cc-by)
  • DOAJ (DOAJ: Directory of Open Access Journals) (submittedVersion)
  • University of the Witwatersrand, Johannesburg Institutional Repository on DSpace (University of the Witwatersrand, Johannesburg) (submittedVersion, cc-by)
Topics
  • Social Sciences › Political Science and International Relations › E-Government and Public Services
  • Physical Sciences › Computer Science › Information Systems › Software Engineering Techniques and Practices
  • Social Sciences › Business, Management and Accounting › Management Information Systems › Information Systems Theories and Implementation
Keywords
e-government, developing countries, design-reality gap, project management, failure prevention

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review