Cited by 1Construction Project Management and PerformanceConstruction Engineering and SafetyCivil and Structural Engineering Research

Assessment of Technical Capacity and Performance of Local Builders in Residential Building Construction Sites

Open access
Sigdel, Sandesh·2023·Baltic Journal of Real Estate Economics and Construction Management

Abstract

This research aims to investigate the technical capability and performance of local builders on residential building construction sites in Gaindakot Municipality, Nepal. The construction industry plays a vital role in the growth of economies worldwide. The quality of construction heavily depends on the technical capacity and performance of builders involved in residential projects. This study aims to assess local builders’ technical competence and performance operating on residential building construction sites. By examining the capabilities of local builders, this research contributes to enhancing the overall quality and efficiency of residential construction projects. The research employs a mixed-methods approach, combining quantitative and qualitative data collection techniques. A comprehensive survey is administered to local builders to evaluate their technical knowledge, skill sets, and utilisation of modern construction techniques. Concurrently, on-site observations and interviews are conducted to gain insights into the actual performance of builders during different construction phases. The findings of this study shed light on the strengths and weaknesses of local builders in residential construction. The on-site observations and interviews offer qualitative insights into the practical application of skills, compliance with safety protocols, and adherence to project timelines. The outcomes of this research are intended to guide policymakers, industry stakeholders, and training institutions in formulating strategies to enhance the technical capacity of local builders. Bridging the identified gaps can improve construction quality, reduce project delays, and increase customer satisfaction. Additionally, the study emphasizes the need for ongoing professional development programs to keep builders updated with the latest construction techniques and standards.

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.2478/bjreecm-2023-0011

Cites

Statistics

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Claims other papers make about this one

Each is checked against this paper’s own text: does it say what the citing paper says it does?

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Cites

No references could be resolved yet.

Research works printed but not linked: 6

  1. Adhikari, R. K., & D'Ayala, D. (2020). 2015 Nepal earthquake: seismic performance and post- earthquake reconstruction of stone in mud mortar masonry buildings. Bulletin of Earthquake Engineering, 18(8), 3863-3896. https://doi.org/10.1007/s10518-020-00834-y · DOI
  2. Aje, I. O., & Famakin, I. O. (2012). The impact of contractors' technical capability on cost and time performance of building projects in Nigeria. Conference paper: RICS COBRA 2012.
  3. Carstens, D., Richardson, G., & Smith, R. (2013). Earned value management, Project Management Tools and Techniques. 1st ed. Boca Raton: CRC Press.
  4. Mishra, A. K., Karmacharya, G., & Aithal, P. S. (2021). Compliance status of building bylaws and codes in high-rise apartment buildings of Nepal. International Journal of Applied Engineering and Management Letters, 66-79. https://doi.org/10.47992/ijaeml.2581.7000.0093 · DOI
  5. Oke, A., Aigbavboa, C., & Khangale, T. (2018). Effect of skills shortage on sustainable construction. AHFE 2017: Advances in Human Factors, Sustainable Urban Planning and Infrastructure, 303- 309. https://doi.org/10.1007/978-3-319-60450-3_29 · DOI
  6. Zainal, R., Hamza, G., Manap, N., & Syahrom, N. S. (2019). Significant ways to improve the performance of medium and large local contractors in the Jigawa State, Nigeria. MATEC Web of Conferences, 266, 03018. https://doi.org/10.1051/matecconf/201926603018 · DOI

Authors
Sigdel, S.
Affiliations
Oxford College of Engineering and Management (NP)
Corresponding author
Sigdel, Sandesh
Venue
Baltic Journal of Real Estate Economics and Construction Management
Published
2023-01-01
Volume
11
Issue
1
Pages
160-171
ISSN
  • 2255-9604 (ISSN-L)
  • 2255-9671
OpenAlex
W4386915408
Cited by
1
References
0
Citations by year
2024: 1
FWCI
0.18
Type
journal article
Language
en
Open access
Locations
  • Baltic Journal of Real Estate Economics and Construction Management (publishedVersion, cc-by)
  • DOAJ (DOAJ: Directory of Open Access Journals) (submittedVersion, cc-by-sa)
Topics
  • Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
  • Physical Sciences › Engineering › Civil and Structural Engineering › Construction Engineering and Safety
  • Physical Sciences › Engineering › Civil and Structural Engineering › Civil and Structural Engineering Research
Keywords
housing construction, technical capacity, construction quality, project delays

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review