Towards a new supraregulatory approach to environmental assessment in Northern Canada
Open accessThe DOI matches its Crossref record; 44 of the 46 references it cites were found in a registry or an index.
Abstract
In some jurisdictions in northern Canada, co-managed environmental assessment (EA) processes, such as that of the Mackenzie Valley Environmental Impact Review Board (MVEIRB), have been adopted. In these same jurisdictions, Aboriginal communities are increasingly negotiating private agreements with mining project proponents as a means of managing impacts and ensuring that local communities secure benefits from the developments. This paper offers a formal assessment of the MVEIRB EA process, to determine whether the rise of private agreements might be attributable partly to deficiencies in the EA process. While the MVEIRB EA process excels in its use of traditional and local knowledge, and its fair and rigorous decision-making process, significant deficiencies remain, as the EA process does not adequately consider benefits, provide project-specific follow-up, or build trust and capacity among stakeholders. We argue that these deficiencies help to explain the rise of supraregulatory agreements; we suggest further research to assess their effectiveness for achieving positive outcomes.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
The source backs part of the claim, not all of it — or backs it for a different population, condition or comparison.
In the citing paper
“This critique of agreements as a manifestation of neoliberal governance serving only powerful economic interests rarely considers that Indigenous peoples might use agreements in a proactive way to pursue their own interests (Caine and Krogman, 2010; Cameron and Levitan, 2014; Galbraith et al., 2007; Howlett and Lawrence, 2019; Papillon and Rodon, 2017; StLaurent and Le Billon, 2015).”
From Negotiated Agreements, Indigenous Peoples and Extractive Industry in the Salar de Atacama, Chile: When Is an Agreement More than a Contract? (2023) · cites this paper as Galbraith et al., 2007
Experimental — accuracy not yet measured
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Adaptive Environmental Assessment and Management
(1980) · Forest Science · doi:10.1093/forestscience/26.3.435 · Cited by 3,222 · cited 3×
“As argued previously, the ex ante recommendations of an EA can be vulnerable to regular system change and surprise events that take place during project construction, operation, and closure (Holling, 1978; Hammond et al, 1983; Noble, 2000).”
BackgroundReport of the Royal Commission on Aboriginal Peoples
Canadá (1996) · Cited by 751
Environmental Impact Assessment: A Comparative Review
Wood, C. M. (1995) · Cited by 588
Race, class and environmental justice
Cutter, S. L. (1995) · Progress in Human Geography · doi:10.1177/030913259501900111 · Cited by 493 · cited 2×
“One approach to mending this inequity is offered by those environmental justice scholars who suggest that compensation be used to help offset the unequal distribution of risks and benefits (Cutter, 1995; Fletcher, 2003).”
BackgroundFreudenburg, W. R. (1986) · Annual Review of Sociology · doi:10.1146/annurev.so.12.080186.002315 · Cited by 340
Environmental Impact Assessment: Practical Solutions to Recurrent Problems
Lawrence, D. P. (2003) · Wiley eBooks · doi:10.1002/0471722022 · Cited by 209
AN ECOLOGICAL FRAMEWORK FOR ENVIRONMENTAL IMPACT ASSESSMENT IN CANADA.
Beanlands, G. E., & Duinker, P. N. (1983) · Cited by 193
The need for subjectivity in EIA: discourse as a tool for sustainable development
Wilkins, H. (2003) · Environmental Impact Assessment Review · doi:10.1016/s0195-9255(03)00044-1 · Cited by 189
Baker, D. C., & McLelland, J. N. (2003) · Environmental Impact Assessment Review · doi:10.1016/s0195-9255(03)00093-3 · Cited by 188 · cited 4×
“…natural-resource developments affecting northern Aboriginal communities, existing criteria — such as Sadler’s checklist (1996) or the criteria used by Baker and McLelland (2003) to evaluate British Columbia’s EA process in the context of First Nations’ participation in mining developments — are…”
BackgroundMethodInfluentialUnnatural Law: Rethinking Canadian Environmental Law and Policy
Colgan, P. W., & Boyd, D. R. (2004) · Canadian Public Policy / Analyse de Politiques · doi:10.2307/3552585 · Cited by 171
Research works printed but not linked: 35
- Berger, T R 1988. Northern Frontier, Northern Homeland: the Re- port of the Mackenzie Pipeline Inquiry. Vancouver: Douglas and McIntyre.
- CBC, Canadian Broadcasting Corporation 2004. Value Aboriginal knowledge, science forum hears. Available at <http://www. north.cbc.ca>, last accessed 16 September 2004.
- CBC, Canadian Broadcasting Corporation 2006. New diamond agreement to aid traditional Tlicho. Available at <http://www. north.cbc.ca., last accessed 2 April 2006.
- CEAA, Canadian Environmental Assessment Agency 1996. NWT Diamonds Project: Report of the Environmental Assessment Panel. Hull: Federal Environmental Assessment Review Office.
- CIRL, Canadian Institute of Resource Law 1997. Independent Review of the BHP Diamond Mine Process. Calgary: CIRL.
- DBC, De Beers Canada 2004a. Environmental Agreement. Yellowknife: DBC.
- DBC, De Beers Canada 2004b. Snap Lake Diamond Project Socio-Economic Agreement. Yellowknife: DBC.
- DDMI, Diavik Diamond Mines Inc 2000a. Environmental Agree- ment. Yellowknife: DDMI.
- Donihee, J, J Gilmour and D Burch 2000. Resource Development and the Mackenzie Valley Resource Management Act: the New Regime. Calgary: Canadian Institute for Resource Law.
- Galbraith, L 2005. Understanding the Rationale for Supraregula- tory Agreements: an Evaluation from the Mackenzie Valley, Northwest Territories. Burnaby: Simon Fraser University. A Masters dissertation available at <http://www.impactandbenefit. com/Galbraith_MAThesis_2005_LIBRARY_FINAL.pdf>, last accessed 2 February 2007.
- Gibson, R B 2000. Favouring the higher test: contribution to sus- tainability as the central criterion for reviews and decisions under the Canadian Environmental Assessment Act. Journal of Environmental Law and Practice, 10, 39-54.
- Gross J., 2005, Community benefits agreements: making development projects accountable
- 1992, Gwich'in Land Claim Settlement Act
- 1993, Canadian Environmental Assessment Act. Chapter 37, Bill C-13 assented to 23 June 1992
- Gross, J 2005. Community benefits agreements: making devel- opment projects accountable. Available at <www. californiapartnership.org/downloads/CBA%20Handbook% 202005%20final.pdf>, last accessed February 2006. Government of Canada 1992. Gwich'in Land Claim Settlement Act. Chapter 53, Bill C94 assented to 17 December. Ottawa: Cat no: YX4-1992/53. Government of Canada 1993a. Canadian Environmental As- sessment Act. Chapter 37, Bill C-13 assented to 23 June 1992. Ottawa: Cat no: YX4-1992/37. Government of Canada 1993b. Nunavut Land Claims Agreement Act. Chapter 29, Bill C133 assented to the 10 June 1993. Ottawa: Cat no: YX4-1993/29. Government of Canada 1994. Sahtu Dene and Metis Land Claim Settlement Act. Chapter 27, Bill C-16 assented to 23 June. Ottawa: Cat no: YX4-1994/27. Government of Canada 1998. Mackenzie Valley Resource Man- agement Act. Chapter 25, Bill C-6 assented to 18 June. Ottawa: Cat no: XY4-1998/25. Government of Canada 2005. An Act to give effect to a Land Claims and Self-government Agreement among the Tlicho, the Government of the Northwest Territories and the Government of Canada, to make Related Amendments to the Mackenzie Valley Resource Management Act and to make Consequential Amendments to other Acts. Chapter 1, Bill C-14 assented to 15 February. Ottawa: Cat no: YX4-2005/1.
- 1994, Sahtu Dene and Metis Land Claim Settlement Act
- 1998, Mackenzie Valley Resource Management Act
- 2005, An Act to give effect to a Land Claims and Self-government Agreement among the Tlicho, the Government of the Northwest Territories and the Government of Canada, to make Related Amendments to the Mackenzie Valley Resource Management Act and to make Consequential Amendments to other Acts
- Keeping, J 1999. Local Benefits from Mineral Development: the Law Applicable in the Northwest Territories. Calgary: Canadian Institute of Resource Law.
- Kennett, S 1999. A Guide to Impact and Benefits Agreements. Calgary: Canadian Institute of Resource Law.
- LANWT, Legislative Assembly of the Northwest Territories 2003. 14th Assembly of the Northwest Territories Legislative Assem- bly, 6th Session, Day 34. Yellowknife: LANWT.
- MVEIRB, Mackenzie Environmental Impact Review Board 2001. Guidelines for EIA in the Mackenzie Valley. Yellowknife: MVEIRB.
- MVEIRB, Mackenzie Environmental Impact Review Board 2003a. Report of Environmental Assessment and Reasons for Deci- sion on the De Beers Canada Mining Inc. Snap Lake Diamond Project. Yellowknife: MVEIRB. Available at <http://mveirb.nt. ca/registry/>, last accessed July 2006.
- MVEIRB, Mackenzie Environmental Impact Review Board 2004b. Report of Environmental Assessment and Reasons for Deci- sion on the New Shoshoni Ventures Preliminary Diamond Exploration in Drybones Bay. Yellowknife: MVEIRB.
- MVEIRB, Mackenzie Environmental Impact Review Board 2005. Lessons Learned: from the MVEIRB's Snap Lake Environ- mental Assessment Process. Yellowknife: MVEIRB.
- MVEIRB, Mackenzie Environmental Impact Review Board 2006a. Participant funding. Valley Talk Newsletter, 1(8), 2.
- MVEIRB, Mackenzie Environmental Impact Review Board 2006b. Reasons for Decision and Report of Environmental Assess- ment for the DeBeers Gahcho Kué Diamond Mine, Kennady Lake, NT. Yellowknife: MVEIRB, Available at <http://www. mveirb.nt.ca/upload/project_document/1151527459_EA0506- 008-Gahcho_Kue-Report_of_Environmental_Assessment. pdf>, last accessed July 2006.
- MVEIRB, Mackenzie Environmental Impact Review Board 2006c. Raising the Bar for Socio-Economic Impact Assessment. Yel- lowknife: MVEIRB.
- Nikiforuk, A 1997. The Nasty Game: the Failure of Environmental Assessment in Canada. Available at <http://www.sierraclub. ca/national/n-g/nasty-game.pdf>, last accessed December 2003.
- Sadler, B 1996. International Study of the Effectiveness of Envi- ronmental Assessment. Final Report. Available at <http:// www.iaia.org/Non_Members/EIA/EAE/EAE_10E.PDF>, last accessed 1 February 2007.
- Sallenave, J 1994. Giving traditional ecological knowledge its rightful place in environmental impact. Northern Perspectives, 22(1), 16-19.
- Sosa, I and K Keenan 2001. Impact Benefit Agreements between Aboriginal Communities and Mining Companies: their use in Canada. Available at < http://www.cela.ca/international/ IBAeng.pdf>, last accessed January 2004.
- Usher, P 1997. The North: one land, two ways of life. In Heartland and Hinterland: A Regional Geography of Canada, 2nd edn, eds. L McCann and A Gunn, pp. 161-204. Scarborough: Pren- tice Hall.
- Wilkinson, P 2003. Impact and Benefits Agreements: an Overview and Evaluation. Montreal: Paul F Wilkinson and Associates Inc.
- Wismer, S 1996. The nasty game: how environmental assess- ment is failing Aboriginal communities in Canada's north. Alternatives, 22(4), 10-17.
Cited by
Prno, J., & Scott Slocombe, D. (2012) · Resources Policy · doi:10.1016/j.resourpol.2012.04.002 · Cited by 885
“follow-up, and closure requirements (Couch, 2002; Galbraith et al., 2007; GNWT, 2010).”
BackgroundHacking, T., & Guthrie, P. (2008) · Environmental Impact Assessment Review · doi:10.1016/j.eiar.2007.03.002 · Cited by 566
Sustainability assessment: the state of the art
Bond, A., Morrison-Saunders, A., & Pope, J. (2012) · Impact Assessment and Project Appraisal · doi:10.1080/14615517.2012.661974 · Cited by 428
Human rights, Indigenous peoples and the concept of Free, Prior and Informed Consent
Hanna, P., & Vanclay, F. (2013) · Impact Assessment and Project Appraisal · doi:10.1080/14615517.2013.780373 · Cited by 254
“Before the IBA model, the social and environmental impacts of development projects on communities used to be addressed only through environmental impact assessment procedures, regulated by the government (Galbraith et al. 2007).”
BackgroundCaine, K. J., & Krogman, N. (2010) · Organization & Environment · doi:10.1177/1086026609358969 · Cited by 198
Papillon, M., & Rodon, T. (2017) · Environmental Impact Assessment Review · doi:10.1016/j.eiar.2016.06.009 · Cited by 169
“In fact, both Indigenous and industry actors tend to consider EIAs as a limited and insufficient mechanism to establish the legitimacy of a project (Galbraith et al., 2007; Fidler and Hitch, 2007).”
BackgroundMining and Communities in Northern Canada: History, Politics, and Memory
Keeling, A., & Sandlos, J. (2015) · University of Calgary Press eBooks · doi:10.1515/9781552388068 · Cited by 146
O'Faircheallaigh, C. (2010) · Canadian Journal of Development Studies / Revue canadienne d'études du développement · doi:10.1080/02255189.2010.9669282 · Cited by 108
St‐Laurent, G. P., & Billon, P. L. (2015) · The Extractive Industries and Society · doi:10.1016/j.exis.2015.06.001 · Cited by 143
Prno, J., Bradshaw, B., Wandel, J., Pearce, T. D., Smit, B. E., & Tozer, L. (2011) · Polar Research · doi:10.3402/polar.v30i0.7363 · Cited by 111
“This has been especially true for Inuit given their negotiation of formal agreements*termed Impact and Benefit Agreements (IBAs)*with mineral developers that include, among other things, provisions to ensure employment and the preferential use of Inuit businesses for mine servicing (Galbraith et al. 2007).”
BackgroundInfluentialSelf-citationSub‐surface Property, Free‐entry Mineral Staking and Settler Colonialism in Canada
Hoogeveen, D. (2014) · Antipode · doi:10.1111/anti.12095 · Cited by 109
Craik, N., Gardner, H., & McCarthy, D. D. P. (2017) · Resources Policy · doi:10.1016/j.resourpol.2017.05.002 · Cited by 106
“…activities and receive commitments from resource developers respecting the responsible management of the environmental and social impacts that often accompany resource development (Kennett, 1999; Sosa and Keenan, 2001; Galbraith et al., 2007; Fidler and Hitch, 2007; O’Faircheallaigh, 2008).”
BackgroundShaping projects, shaping impacts: community-controlled impact assessments and negotiated agreements
O’Faircheallaigh, C. (2017) · Third World Quarterly · doi:10.1080/01436597.2017.1279539 · Cited by 99
Fidler, C. (2009) · Environment Development and Sustainability · doi:10.1007/s10668-009-9191-6 · Cited by 98
“The need for more certainty with respect to land tenure and project development has therefore led many mining proponents toward negotiating NAs, with Aboriginal groups willing to negotiate to remedy perceived EIA deficiencies ( Galbraith et al. 2007 ) and help secure their rights (proven or potential), title, and inte…”
BackgroundBooth, A. L., & Skelton, N. W. (2011) · Impact Assessment and Project Appraisal · doi:10.3152/146155111x12913679730395 · Cited by 96
“…Sekani Tribal Council, 2007; Couch, 2002; Confederacy of Nations, 1999; Fidler, 2010; First Nations Energy and Mining Council, 2009; Haddock, 2010; Harvard Law School, 2010; Galbraith et al, 2007; Gibson, 2002; O’Faircheallaigh, 2007; Plate et al, 2009; Tollefson and Wipond 1998; Wismer, 1996).”
BackgroundResource development and aboriginal culture in the Canadian north
Angell, A. C., & Parkins, J. R. (2010) · Polar Record · doi:10.1017/s0032247410000124 · Cited by 93
Bowie, R. (2013) · Journal of Canadian Studies · doi:10.3138/jcs.47.1.91 · Cited by 86
Gendering Environmental Assessment: Women’s Participation and Employment Outcomes at Voisey’s Bay
Cox, D. R., & Mills, S. (2015) · ARCTIC · doi:10.14430/arctic4478 · Cited by 79
“While some scholars have applauded IBAs as a mechanism to address weaknesses in the EA processes (Galbraith et al., 2007; O’Faircheallaigh, 2007; Noble and Fidler, 2011), others have problematized the use of IBAs as a regulatory mechanism arguing that IBA negotiations can lessen the effectiveness of EA processes and t…”
BackgroundInfluentialAttitudes and behaviors of mining sector employers towards the Indigenous workforce
Caron, J., Asselin, H., & Beaudoin, J.-M. (2019) · Resources Policy · doi:10.1016/j.resourpol.2019.02.001 · Cited by 78
Explaining outcomes from negotiated agreements in Australia and Canada
O’Faircheallaigh, C. (2020) · Resources Policy · doi:10.1016/j.resourpol.2020.101922 · Cited by 74
Wanvik, T. I. (2016) · The Extractive Industries and Society · doi:10.1016/j.exis.2016.01.007 · Cited by 73
“…communities in Canada in general, and more specifically in Alberta, to establish formal relationships between them, to reduce the predicted impact of an industrial operation and to secure economic benefits for affected communities (Galbraith et al., 2007; Gibson, 2008; Sosa and Keenan, 2001).”
BackgroundUdofia, A., Noble, B. F., & Poelzer, G. (2016) · Environmental Impact Assessment Review · doi:10.1016/j.eiar.2016.04.008 · Cited by 76
“…as privatized impact and benefit agreements, to accommodate for the shortcomings of the participatory EA process – namely, facilitating early engagement of affected communities and minimizing conflict and delays during project review and approval (Noble and Fidler, 2011; Galbraith et al., 2007).”
BackgroundBooth, A. L., & Skelton, N. W. (2011) · Journal of Environmental Assessment Policy and Management · doi:10.1142/s1464333211003936 · Cited by 64
Indigenous Peoples and Mining: A Global Perspective
O’Faircheallaigh, C. (2023) · doi:10.1093/oso/9780192894564.001.0001 · Cited by 63
Noble, B. F., & Birk, J. A. (2010) · Environmental Impact Assessment Review · doi:10.1016/j.eiar.2010.05.002 · Cited by 61
"Not the Almighty": Evaluating Aboriginal Influence in Northern Land-Claim Boards
White, G. (2009) · ARCTIC · doi:10.14430/arctic103 · Cited by 56
O'Faircheallaigh, C., & Babidge, S. (2023) · Development and Change · doi:10.1111/dech.12767 · Cited by 54
Booth, A. L., & Skelton, N. W. (2010) · Environmental Impact Assessment Review · doi:10.1016/j.eiar.2010.11.002 · Cited by 53
Jones, J., Cunsolo, A., & Harper, S. L. (2018) · PLoS ONE · doi:10.1371/journal.pone.0196090 · Cited by 54
Environmental Assessment in the Arctic: A Gap Analysis and Research Agenda
Noble, B. F., & Hanna, K. S. (2015) · ARCTIC · doi:10.14430/arctic4501 · Cited by 46
Gunton, C., & Markey, S. (2021) · Resources Policy · doi:10.1016/j.resourpol.2021.102152 · Cited by 39
Indigenous multilevel governance and power relations
Alcantara, C., & Morden, M. (2017) · Territory Politics Governance · doi:10.1080/21622671.2017.1360197 · Cited by 37
“Environmental assessment processes are thought by some to have improved in recent years (Galbraith et al., 2007), and there are clear examples of Indigenous communities adopting multi-platformMLG strategies (for example, Gibson, 2006).”
BackgroundKnotsch, C., Siebenmorgen, P., & Bradshaw, B. (2012) · Recherches amérindiennes au Québec · doi:10.7202/1009369ar · Cited by 35
Self-citationJones, J., & Bradshaw, B. (2015) · The Northern Review · doi:10.22584/nr41.2015.004 · Cited by 32
“As a supplement to EA, the advent of HIA has been important for addressing human health and well-being in the assessment of resource development; that said, limitations continue to constrain eff ective policy and practice responses to identifi ed issues, especially those with historical origins.”
BackgroundMethodInfluentialSelf-citationMcCreary, T., Mills, S., & St-Amand, A. (2016) · Canadian Public Policy · doi:10.3138/cpp.2015-061 · Cited by 32
Myette, E., & Riva, M. (2021) · The Extractive Industries and Society · doi:10.1016/j.exis.2021.100901 · Cited by 31
Bullock, R. C. L., Kirchhoff, D., Mauro, I. J., & Boerchers, M. (2017) · Environment Development and Sustainability · doi:10.1007/s10668-017-9917-9 · Cited by 26
“Much has changed since the Commission, including an increase in the number of natural resource development agreements involving Indigenous groups, other governments, and industries (Galbraith et al. 2007; O’Faircheallaigh 2010).”
BackgroundNakamura, N. (2008) · Australian Geographer · doi:10.1080/00049180802419179 · Cited by 25
“(Emphasis in original) Galbraith et al. (2007), p. 28) also argue that [a]nother failing concerns the tendency for EA to focus on process rather than outcomes; that is, instead of concentrating on substantive goals (such as environmental or cultural protection or the attainment of sustainability),…”
BackgroundFidler, C., & Noble, B. F. (2013) · Journal of Environmental Assessment Policy and Management · doi:10.1142/s1464333213500075 · Cited by 24
“To date, the focus on research on benefit agreements in relation to environmental management has focused exclusively on project-level EA, namely in the mineral sector (see Noble and Fidler, 2011), and suggest that such agreements have emerged, in part, due to the inadequacies of project-based assessments in addressing…”
BackgroundCompany–community agreements in the mining sector
Bradshaw, B., & McElroy, C. A. (2014) · Critical studies on corporate responsibility, governance and sustainability · doi:10.1108/s2043-9059_2014_0000007007 · Cited by 23
Self-citationExtractive Settler Colonialism: Navigating Extractive Bargains on Indigenous Territories in Canada
Atleo, C. G., & Boron, J. (2023) · Springer eBooks · doi:10.1007/978-3-031-32172-6_5 · Cited by 22
Udofia, A., Noble, B. F., & Poelzer, G. (2015) · The Northern Review · Cited by 21
The geography of skill: Mobility and exclusionary unionism in Canada’s north
Mills, S. (2018) · Environment and Planning A Economy and Space · doi:10.1177/0308518x18801025 · Cited by 21
“Though many scholars have celebrated IBAs as a mechanism that can provide Indigenous communities with greater agency and control over development (Galbraith et al., 2007; Noble and Fidler, 2011; O’Faircheallaigh, 2007), others have been more sceptical, suggesting that IBAs neoliberalize state–community relations, weak…”
BackgroundMaking space for reconciliation in the planning system
Galbraith, L. (2014) · Planning Theory & Practice · doi:10.1080/14649357.2014.963650 · Cited by 22
Self-citationTurning Protesters into Monitors: Appraising Critical Collaboration in the Mining Industry
Smith, J. M. (2015) · Society & Natural Resources · doi:10.1080/08941920.2014.945063 · Cited by 20
“Like EAs in general, the agreement between the coalition and the mine is supraregulatory, in the sense that it exists alongside formal processes like environmental impact assessment but is not itself proscribed in regulation (Fidler and Hitch 2007; Galbraith et al. 2007).”
BackgroundInfluentialImpact and Benefit Agreements: Are they working?
Prno, J., Bradshaw, B., & Lapierre, D. (2010) · Cited by 20
Self-citationZilliox, S., & Smith, J. M. (2016) · The Extractive Industries and Society · doi:10.1016/j.exis.2016.11.008 · Cited by 19
Collins, B. C., & Kumral, M. (2022) · The Extractive Industries and Society · doi:10.1016/j.exis.2022.101094 · Cited by 19
Constitutional change, Aboriginal rights, and mining policy in Canada
Panagos, D., & Grant, J. A. (2013) · Commonwealth and Comparative Politics · doi:10.1080/14662043.2013.838373 · Cited by 19
Brunet, N. D., & Longboat, S. (2023) · Routledge eBooks · doi:10.4324/9781003182375 · Cited by 18
Mills, S. (2010) · Labor Studies Journal · doi:10.1177/0160449x10392527 · Cited by 19
Lajoie-O’Malley, A., Bronson, K., & Blue, G. (2023) · Social Studies of Science · doi:10.1177/03063127231177311 · Cited by 18
Noble, B. F., & Fidler, C. (2011) · Oil, Gas & Energy Law Journal · Cited by 17
Haalboom, B. J. (2016) · The Extractive Industries and Society · doi:10.1016/j.exis.2016.09.002 · Cited by 16
Boron, J., & Markey, S. (2020) · Journal of rural and community development · doi:10.63315/m7zfd028 · Cited by 16
Grant, J. A., Panagos, D., Hughes, M., & Mitchell, M. I. (2014) · Social Science Quarterly · doi:10.1111/ssqu.12115 · Cited by 15
Haalboom, B. J. (2014) · Canadian Geographies / Géographies canadiennes · doi:10.1111/cag.12086 · Cited by 15
Spitzer, A. J., & Selle, P. (2019) · Canadian Journal of Political Science · doi:10.1017/s0008423919000301 · Cited by 11
“In the case of environmental assessments in the Mackenzie Valley, this process has been described as “a ‘bottom-up approach,’ whereby the board includes and involves a wide range of ‘everyday folks’ steeped in local knowledge and values” (Galbraith et al., 2007: 34).”
BackgroundDecolonizing Scaffolding: Learning from First Nations’ Resurgence to Recalibrate Entrepreneurship
Cascadden, M. M., Bastien, F., Block, E. S., & Jennings, P. D. (2025) · Journal of Management Studies · doi:10.1111/joms.13255 · Cited by 10
Dokis, C. (2023) · Frontiers in Sociology · doi:10.3389/fsoc.2022.1056277 · Cited by 9
“These formal agreements reached between corporations and Indigenous communities help to secure particular benefits stemming from extractive industries, compensate for social and economic disruption, provide employment opportunities for Indigenous community members and development opportunities for Indigenousowned busi…”
BackgroundUdofia, A., Noble, B. F., & Poelzer, G. (2016) · Journal of Environmental Assessment Policy and Management · doi:10.1142/s1464333216500204 · Cited by 9
Program Evaluation In A Northern Aboriginal Setting: Assessing Impact and Benefit Agreements
Prno, J., & Bradshaw, B. (2008) · Journal of Aboriginal Economic Development · doi:10.29173/jaed262 · Cited by 9
“Finally, the three operations were the subject of prior related research (see Galbraith et al., 2007), which was drawn upon for completion of this research.”
BackgroundInfluentialSelf-citationRegional strategic environmental assessment roles and stakes in Arctic oil and gas development
Ketilson, S. (2011) · University Library - University of Saskatchewan (University of Saskatchewan) · Cited by 9
Siebenmorgen, P. (2009) · The Atrium (University of Guelph) · Cited by 9
Counter-institutionalizing First Nation–Crown relations in British Columbia
Persaud, A. W., Satterfield, T. A., & Macdonald, E. (2020) · Environment and Planning A Economy and Space · doi:10.1177/0308518x20924027 · Cited by 8
“Although these negotiated agreements are seen to address the deficiencies of other funding and impact assessment processes, and even act as cultural and social permits for development within First Nation territories, their impacts are still poorly understood (Galbraith et al., 2007).”
BackgroundMcGetrick, J. A., Bubela, T. M., & Hik, D. S. (2015) · Environmental Science & Policy · doi:10.1016/j.envsci.2015.07.005 · Cited by 7
Kwon, K. (2016) · Summit (Simon Fraser University) · Cited by 7
Political Opportunity and Public Participation: EIA in Northern Canada and South Africa
Boyco, M. (2010) · The Atrium (University of Guelph) · Cited by 7
Land-Murphy, B. (2009) · Summit (Simon Fraser University) · Cited by 6
Management of socio-political risk arising from corporate transitions : the Mt. Milligan experience
Thomson, G. C. (2016) · cIRcle (University of British Columbia) · doi:10.14288/1.0224797 · Cited by 6
“…Nations' traditional lands, or those that may impact First Nations' communities by agreeing upon proper company conduct, grievance mechanisms, cultural provisions, and environmental performance and monitoring (Fidler & Hitch, 2007; Fidler, 2010; Galbraith et al., 2007; Heisler & Markey, 2014).”
BackgroundChan, K. W. (2016) · International Planning Studies · doi:10.1080/13563475.2016.1273097 · Cited by 5
“…and aboriginal communities by drafting an IBA to create more room for indigenous communities to participate in development projects and dispense development benefits and social responsibilities more equitably (Caine and Krogman 2010; Galbraith et al. 2007; O’Faircheallaigh and Corbett 2005).”
Petrov, A. N., Graybill, J. K., Berman, M., Cavin, P., Владимировна, К. В., Rasmussen, R. O., & Cooney, M. (2018) · Routledge eBooks · doi:10.4324/9781351019101-6 · Cited by 5
Lukas-Amulung, S. (2009) · Library and Archives Canada (Government of Canada) · Cited by 5
Wozniak, K. J. (2007) · Summit (Simon Fraser University) · Cited by 5
Broadbent, S. (2014) · Summit (Simon Fraser University) · Cited by 5
Blue, G., Bronson, K., & Lajoie-O’Malley, A. (2020) · doi:10.11575/prism/37943 · Cited by 5
“This includes work on co-management and Aboriginal resource planning in Canada - especially but not exclusively in the Canadian North (Galbraith et al. 2007; Gondor, 2016; Mantyka-Pringle et al., 2017; Nadasdy 2003a, 2003b; Paci 2002), as well as in Alaska (Fernandez-Gimenez et al., 2006), and…”
BackgroundCaron, J. (2020) · Depositum (Université du Québec en Abitibi-Témiscamingue) · Cited by 5
Best practices for Impact Benefit Agreements: A case study of the Mary River Project
Cascadden, M. (2018) · Summit (Simon Fraser University) · Cited by 4
Indigenous Engagement: Negotiation and Agreements
O’Faircheallaigh, C. (2023) · Oxford University Press eBooks · doi:10.1093/oso/9780192894564.003.0008 · Cited by 4
Caddell, E. (2018) · UWSpace (University of Waterloo) · Cited by 4
Sadiq, S. (2017) · Mspace (University of Manitoba) · Cited by 4
Levitan, T. (2012) · Carleton University's Institutional Repository (MacOdrum Library, Carleton University) · doi:10.22215/etd/2012-06763 · Cited by 4
Caron, J., Asselin, H., & Beaudoin, J.-M. (2018) · Corpus Université Laval (Université Laval) · Cited by 4
Roger, L. (2021) · Knowledge UdeS (Institutional Deposit of the University of Sherbrooke) · Cited by 4
Do, M. (2020) · Canadian Journal of Political Science · doi:10.1017/s000842392000027x · Cited by 3
“This scholarship also focuses on specific EA jurisdictions, most notably the north (for example, Armitage, 2005; Galbraith et al., 2007; Noble et al., 2013; Noble and Hanna, 2015; O’Reilly, 1996) and the west (for example, Baker and McLelland, 2003; Booth and Skelton, 2011b) or specific components…”
BackgroundHeisler, K. (2012) · Summit (Simon Fraser University) · Cited by 3
Lucchetta, M. T. (2016) · Summit (Simon Fraser University) · Cited by 3
Nested Regulation in Law and Development: Identifying Sites of Indigenous Resistance and Reform
Graben, S. (2016) · The Law and Development Review · doi:10.1515/ldr-2016-0012 · Cited by 3
INCLUSION, COEXISTENCE AND RESILIENCE: KEY LESSONS LEARNED FROM INDIGENOUS LAW AND METHODOLOGY
Poto, M. P. (2019) · Institutional Research Information System University of Turin (University of Turin) · Cited by 3
Birk, J. A. (2009) · University Library - University of Saskatchewan (University of Saskatchewan) · Cited by 3
Kenny, C. (2015) · The Atrium (University of Guelph) · Cited by 4
Crowley, C. K. (2016) · University Library - University of Saskatchewan (University of Saskatchewan) · Cited by 3
Resource Extraction and Indigenous Community Consent
Gibson, G., & Bradshaw, B. (2017) · Springer eBooks · doi:10.1007/978-3-319-23514-1_128-2 · Cited by 3
Self-citationMontoya, X. C. (2014) · Archipel (Université du Québec à Montréal) · Cited by 3
Impact Benefit Agreements in Critical Mineral Mining: A Typology and Analysis
Carr-Wilson, S., Pattanayak, S. K., & Weinthal, E. S. (2026) · Environment and Security · doi:10.1177/27538796261463020 · Cited by 2
Theoretical Perspectives on Interactions between Indigenous Peoples and Mining
O’Faircheallaigh, C. (2023) · Oxford University Press eBooks · doi:10.1093/oso/9780192894564.003.0002 · Cited by 2
Indigenous Peoples: Diversity and Shared Experiences
O’Faircheallaigh, C. (2023) · Oxford University Press eBooks · doi:10.1093/oso/9780192894564.003.0005 · Cited by 2
Northern environmental assessment
Noble, B. F., Hanna, K. S., & Blakly, J. (2018) · Routledge eBooks · doi:10.4324/9781351019101-4 · Cited by 2
Fidler, C. (2013) · University Library - University of Saskatchewan (University of Saskatchewan) · Cited by 2
Metadata
- Authors
- Galbraith, L., Bradshaw, B., & Rutherford, M. B.
- Affiliations
- University of Guelph (CA)
- Simon Fraser University (CA)
- ORCID
- Bradshaw, Ben
- Venue
- Impact Assessment and Project Appraisal
- Publisher
- Informa UK Limited
- Published
- 2007-03
- Volume
- 25
- Issue
- 1
- Pages
- 27-41
- ISSN
- 1461-5517 (ISSN-L)
- 1471-5465
- OpenAlex
- W1974134364
- Semantic Scholar
- fbbafcdf6b778f9ed55554678178836de8a22a50
- Cited by
- 120
- References
- 46
- Citations by year
- 2026: 2 · 2025: 2 · 2024: 1 · 2023: 30 · 2022: 1 · 2021: 5 · 2020: 5 · 2019: 2 · 2018: 6 · 2017: 5 · 2016: 10 · 2015: 8 · 2014: 6 · 2013: 7 · 2012: 5
- FWCI
- 27.38
- Type
- journal article
- Language
- en
- Open access
- bronze
- doi.org
- Locations
- Impact Assessment and Project Appraisal (publishedVersion)
- Funders
- Simon Fraser University
- Topics
- Physical Sciences › Environmental Science › Management, Monitoring, Policy and Law › Environmental and Social Impact Assessments
- Physical Sciences › Environmental Science › Management, Monitoring, Policy and Law › Mining and Resource Management
- Social Sciences › Anthropology › Indigenous Studies and Ecology
- Keywords
- environmental impact assessment, co-management, Aboriginal communities, mining projects, private contracts, traditional knowledge, stakeholder trust, follow-up mechanisms, northern Canada
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.